=== WORK INCLUDED ===
 
=== WORK INCLUDED ===
;(1) [[RoofStar Guarantee Standards for ASM Roof Systems#ASMGUT |'''Built-in Gutter Membrane''']]: For construction details see also [[ASM Details:E1.7.17 (Built-in Gutter)|'''E1.7.17 Built-in Gutter''']]. For installation standards, also refer to [[RoofStar Guarantee Standards for ASM Roof Systems#ASMGUT|'''9 Built-in Gutters''']] in the RoofStar Guarantee Standards for ASM Roof Systems.  
+
;(1) [[RoofStar Guarantee Standards for ASM Roof Systems#ASMGUT |'''Built-in Gutter Membrane''']]: For construction details see also [[ASM Details:E1.7.17 (Built-in Gutter)|'''E1.7.17 Built-in Gutter''']]. For installation standards, also refer to [[RoofStar Guarantee Standards for ASM Roof Systems#ASMGUT|'''9 Built-in Gutters''']] in the '''''RoofStar Guarantee Standards for ASM Roof Systems'''''.  
 
;(2) [[RoofStar Guarantee Standards for ASM Roof Systems#ASMUNDERLAYMENT|'''Underlayment''']]: The type of underlay required is determined by roof slope and material used to construct deck.  Shed onto built in gutter membrane and continuity maintained under the insulation.  
 
;(2) [[RoofStar Guarantee Standards for ASM Roof Systems#ASMUNDERLAYMENT|'''Underlayment''']]: The type of underlay required is determined by roof slope and material used to construct deck.  Shed onto built in gutter membrane and continuity maintained under the insulation.  
 
;(3) [[RoofStar Guarantee Standards for ASM Roof Systems#ASMINS |'''Insulation''']]: Tapered crickets formed from accepted insulation set in opposition to allow membrane vapour barrier / underlayment transition seal at built in gutter membrane while providing a level surface for metal panel installation.  
 
;(3) [[RoofStar Guarantee Standards for ASM Roof Systems#ASMINS |'''Insulation''']]: Tapered crickets formed from accepted insulation set in opposition to allow membrane vapour barrier / underlayment transition seal at built in gutter membrane while providing a level surface for metal panel installation.  

Revision as of 17:48, 25 November 2016

RoofStar Guarantee Standards are blue-linked
ASM Details

8.1.4.16.1.jpg

1 WORK INCLUDED

(1) Built-in Gutter Membrane
For construction details see also E1.7.17 Built-in Gutter. For installation standards, also refer to 9 Built-in Gutters in the RoofStar Guarantee Standards for ASM Roof Systems.
(2) Underlayment
The type of underlay required is determined by roof slope and material used to construct deck. Shed onto built in gutter membrane and continuity maintained under the insulation.
(3) Insulation
Tapered crickets formed from accepted insulation set in opposition to allow membrane vapour barrier / underlayment transition seal at built in gutter membrane while providing a level surface for metal panel installation.
(4) Metal Panel Underlayment
Optional
(5) Architectural Metal Roof Panel
For accepted metal roofing panel systems refer to Accepted Materials: Metal Roofing.
(6) Metal Flashing
For installation procedures refer to metal panel construction drawings.

2 RELATED WORK BY OTHERS

(A) Acceptable Deck
(B) Wood Nailer
For attachment of continuous edge hook flashing.
(C) Fascia Board
(D) Built-in Gutters
Slope to Drains

NOTE: Refer to RoofStar Guarantee Standards for additional requirements.



RoofStar Guarantee Standards for ASM Roof Systems

Back to ASM Construction Details

Back to Construction Details