Difference between revisions of "Asphalt Shingles - Changes in Slope (Outside Angle)"

Jump to: navigation, search

Difference between revisions of "Asphalt Shingles - Changes in Slope (Outside Angle)"

(RELATED WORK BY OTHERS)
(2 intermediate revisions by the same user not shown)
Line 7: Line 7:
 
<div class="col-md-6">
 
<div class="col-md-6">
 
<div style="text-align:center; vertical-align:center">
 
<div style="text-align:center; vertical-align:center">
<big>Applicable to slopes 1:6 (2" in 12") and greater.</big>
 
  
 
[[File:ASh 9.1.4 CD.jpg|class=img-responsive | link=http://rpm.rcabc.org/images/2/2c/ASh_9.1.4_CD.jpg]]
 
[[File:ASh 9.1.4 CD.jpg|class=img-responsive | link=http://rpm.rcabc.org/images/2/2c/ASh_9.1.4_CD.jpg]]
Line 24: Line 23:
  
 
=== RELATED WORK BY OTHERS ===
 
=== RELATED WORK BY OTHERS ===
;(A) [[RoofStar Guarantee Standards for Asphalt Shingles Roof Assemblies#ASDECK|'''Acceptable Deck''']]
+
;(A) [[RoofStar Guarantee Standards for Asphalt Shingle Systems#AShDECK|'''Acceptable Deck''']]
 
</div><!-- COL-6-MD -->
 
</div><!-- COL-6-MD -->
 
</div><!-- PANEL BODY -->
 
</div><!-- PANEL BODY -->
Line 36: Line 35:
 
[[RoofStar Guarantee Standards for Asphalt Shingle Systems|<i class="fa fa-chevron-circle-left fa" ></i> RoofStar Guarantee Standards for Asphalt Shingle Systems]]
 
[[RoofStar Guarantee Standards for Asphalt Shingle Systems|<i class="fa fa-chevron-circle-left fa" ></i> RoofStar Guarantee Standards for Asphalt Shingle Systems]]
  
[[Asphalt Shingles Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''Asphalt Shingles Construction Details'']]
+
[[Asphalt Shingle Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''Asphalt Shingles Construction Details'']]
  
 
[[Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''Construction Details'']]
 
[[Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''Construction Details'']]

Revision as of 21:00, 21 October 2019

RoofStar Guarantee Standards are blue-linked
Asphalt Shingle Details

1 WORK INCLUDED

(1) Underlayment
Underlayment on the upper slope must overlap the metal transition flashing and lower slope underlayment.
(2) Self-adhered (eave protection) Membrane
Optional for this slope change configuration, to seal the upper edge of the metal transition flashing. When installed, the SA membrane must overlap the metal by at least 50 mm (2”) and extend upslope past the edge of the lower slope underlayment by at least 50 mm (2”).
(3) Metal Transition Flashing
The lower leg must measure at least 100 mm (4”); the upper leg should measure at least 125 mm (5”).
(4) Starter Shingle
(5) Shingle

2 RELATED WORK BY OTHERS

(A) Acceptable Deck

NOTE: Refer to RoofStar Guarantee Standards for additional requirements.



RoofStar Guarantee Standards for Asphalt Shingle Systems

Back to Asphalt Shingles Construction Details

Back to Construction Details