Difference between revisions of "PVC Roof System Details"

Jump to: navigation, search

Difference between revisions of "PVC Roof System Details"

(AIR and VAPOUR CONTROLS)
(7 intermediate revisions by the same user not shown)
Line 24: Line 24:
  
 
====GENERAL====
 
====GENERAL====
:[[TPO Details:D3.7.1-1 Assemblies (Insulated Conventional)|D3.7.1-1 Assemblies (Insulated Conventional)]]
+
:[[PVC 1.3.1-1 Conventionally Insulated System (mechanically attached) | PVC 1.3.1-1 Conventionally Insulated System (mechanically attached)]]
:[[TPO Details:D3.7.1-2 Assemblies (Ballasted Protected Membrane)|D3.7.1-2 Assemblies (Ballasted Protected Membrane)]]
+
:[[PVC 1.3.1-2 Conventionally Insulated System (adhered)| PVC 1.3.1-2 Conventionally Insulated System (adhered)]]
:[[TPO Details:D3.7.1-3 Assemblies (Fully Adhered)|D3.7.1-3 Assemblies (Fully Adhered)]]
+
:[[PVC 1.3.1-3 Protected Membrane Roof Assembly (typical)| PVC 1.3.1-3 Protected Membrane Roof Assembly (typical)]]
  
 
====SUPPORTING STRUCTURES: Decks and Walls====
 
====SUPPORTING STRUCTURES: Decks and Walls====
Line 37: Line 37:
  
 
====AIR and VAPOUR CONTROLS====
 
====AIR and VAPOUR CONTROLS====
 +
:[[6.3.1 Air and Vapour Controls (field) | {{hilite | 6.3.1 Air and Vapour Controls (field)|| 2021-February-7 }}]]
  
 
====INSULATION====
 
====INSULATION====
Line 45: Line 46:
  
 
====PERIMETERS and WALLS====
 
====PERIMETERS and WALLS====
:[[TPO Details:D3.7.5-1 Roof-Wall Transitions (Expansion Joint)|D3.7.5-1 Roof-Wall Transitions (Expansion Joint)'''(Under Construction''')]]
 
:[[TPO Details:D3.7.5-2 Roof-Wall Transitions (Divider/Joint)|D3.7.5-2 Roof-Wall Transitions (Divider/Joint)'''(Under Construction)''']]
 
:[[TPO Details:D3.7.5-3 Roof-Wall Transitions (Fire Separation Joint)|D3.7.5-3 Roof-Wall Transitions (Fire Separation Joint)'''(Under Construction)''']]
 
:[[TPO Details:D3.7.5-4 Roof-Wall Transitions (Fire Separation Wall)|D3.7.5-4 Roof-Wall Transitions (Fire Separation Wall)'''(Under Construction)''']]
 
:[[TPO Details:D3.7.2-1 Parapets & Copings (High - Wall Supported)|D3.7.2-1 Parapets & Copings (High - Wall Supported)'''(Under Construction)''']]
 
:[[TPO Details:D3.7.2-2 Parapets & Copings (Parapet - Wall Transition)|D3.7.2-2 Parapets & Copings (Parapet - Wall Transition)'''(Under Construction)''']]
 
:[[TPO Details:D3.7.3-1 Edges & Fascia (Cant Edge)|D3.7.3-1 Edges & Fascia (Cant Edge)'''(Under Construction)''']]
 
:[[TPO Details:D3.7.3-2 Edges & Fascia (Gravel Stop)|D3.7.3-2 Edges & Fascia (Gravel Stop)'''(Under Construction)''']]
 
:[[TPO Details:D3.7.3-3 Edges & Fascia (Roof Edge)|D3.7.3-3 Edges & Fascia (Roof Edge)]]
 
  
:[[TPO Details:D3.7.4-1 Counter-flashings & Reglets (Deck - Wall Supported)|D3.7.4-1 Counter-flashings & Reglets (Deck - Wall Supported)'''(Under Construction''')]]
 
:[[TPO Details:D3.7.4-2 Counter-flashings & Reglets (Deck - Unsupported by Wall)|D3.7.4-2 Counter-flashings & Reglets (Deck - Unsupported by Wall)'''(Under Construction)''']]
 
:[[TPO Details:D3.7.4-3 Counter-flashings & Reglets (Stucco Wall: Re-roofing)|D3.7.4-3 Counter-flashings & Reglets (Stucco Wall: Re-roofing)'''(Under Construction)''']]
 
:[[TPO Details:D3.7.4-4 Counter-flashings & Reglets (Stucco Wall: New)|D3.7.4-4 Counter-flashings & Reglets (Stucco Wall: New)'''(Under Construction''')]]
 
:[[TPO Details:D3.7.4-5 Counter-flashings & Reglets (Double Surface Reglet)|D3.7.4-5 Counter-flashings & Reglets (Double Surface Reglet)'''(Under Construction)''']]
 
:[[TPO Details:D3.7.4-6 Counter-flashings & Reglets (Low Door Sill)|D3.7.4-6 Counter-flashings & Reglets (Low Door Sill)'''(Under Construction)''']]
 
:[[TPO Details:D3.7.4-7 Counter-flashings & Reglets (Window Curb)|D3.7.4-7 Counter-flashings & Reglets (Window Curb)'''(Under Construction''')]]
 
  
 
</div>
 
</div>
Line 68: Line 53:
  
 
====DRAINS and PENETRATIONS====
 
====DRAINS and PENETRATIONS====
:[[TPO Details:D3.7.6-1 Curbs & Sleepers (Equipment Sleeper)|D3.7.6-1 Curbs & Sleepers (Equipment Sleeper)'''(Under Construction)''']]
 
:[[TPO Details:D3.7.6-2 Curbs & Sleepers (Multiple Roof Penetrations)|D3.7.6-2 Curbs & Sleepers (Multiple Roof Penetrations)'''(Under Construction''')]]
 
:[[TPO Details:D3.7.6-3 Curbs & Sleepers (Basic Curb)|D3.7.6-3 Curbs & Sleepers (Basic Curb)]]
 
:[[TPO Details:D3.7.6-4 Curbs & Sleepers (Mechanical Opening)|D3.7.6-4 Curbs & Sleepers (Mechanical Opening)]]
 
  
:[[TPO Details:D3.7.7-1 Strip-in Flashings (Metal Plumbing)|D3.7.7-1 Strip-in Flashings (Metal Plumbing)'''(Under Construction)''']]
 
:[[TPO Details:D3.7.7-2 Strip-in Flashings (Two-part Cable)|D3.7.7-2 Strip-in Flashings (Two-part Cable)]]
 
:[[TPO Details:D3.7.7-3 Strip-in Flashings (Pourable Sealer Pocket)|D3.7.7-3 Strip-in Flashings (Pourable Sealer  Pocket)'''(Under Construction)''']]
 
 
:[[TPO Details:D3.7.8-1 Water & Drainage (Cast Iron Drain)|D3.7.8-1 Water & Drainage (Cast Iron Drain)'''(Under Construction)''']]
 
:[[TPO Details:D3.7.8-2 Water & Drainage (Spun Copper Drain)|D3.7.8-2 Water & Drainage (Spun Copper Drain)'''(Under Construction)''']]
 
:[[TPO Details:D3.7.8-3 Water & Drainage (Clamping Spun Copper Drain)|D3.7.8-3 Water & Drainage (Clamping Spun Copper Drain)]]
 
:[[TPO Details:D3.7.8-4 Water & Drainage (Open Wall Scupper)|D3.7.8-4 Water & Drainage (Open Wall Scupper)'''(Under Construction)''']]
 
:[[TPO Details:D3.7.8-5 Water & Drainage (Through-wall Scupper)|D3.7.8-5 Water & Drainage (Through-wall Scupper)'''(Under Construction)''']]
 
 
:[[TPO Details:D3.7.9-1 Miscellaneous Penetrations (Roof Anchor)|D3.7.9-1 Miscellaneous Penetrations (Roof Anchor)'''(Under Construction)''']]
 
:[[TPO Details:D3.7.9-2 Miscellaneous Penetrations (Wall Anchor - Conventional Roof Assy)|D3.7.9-2 Miscellaneous Penetrations (Wall Anchor - Conventional Roof Assy)'''(Under Construction)''']]
 
:[[TPO Details:D2.7.9-3 Miscellaneous Penetrations (Wall Anchor - Protected Roof Assy)|D3.7.9-3 Miscellaneous Penetrations (Wall Anchor - Protected Roof Assy)'''(Under Construction)''']]
 
  
 
====PROTECTED MEMBRANES and OTHER DETAILS====
 
====PROTECTED MEMBRANES and OTHER DETAILS====

Revision as of 17:04, 24 June 2020

Editor's note
This page is currently under revision, as the details are renumbered and new details and printable detail pages are added. Continue to watch for further updates to the this page and the displayed links.
The drawings contained within this section are intended to represent a variety of thermoplastic roof system applications while remaining generic with regards to manufacturers’ specific application specifications. They do not represent all possible manufacturer application roof system designs. Consult manufacturers’ specifications and RoofStar Guarantee Standards to develop a system acceptable to both the manufacturer and the RoofStar Guarantee Program.
For further information about thermoplastic (TPO and PVC) membrane system designs and requirements, see PVC (Thermoplastic) Membrane Systems.
TPO-PVC Link Drawing.jpg

Pdf.png

NOTE: 'PDF' shown after a file name below indicates a downloadable print sheet is available for Construction Details. Click on the detail link and look for the icon.


1 GENERAL

PVC 1.3.1-1 Conventionally Insulated System (mechanically attached)
PVC 1.3.1-2 Conventionally Insulated System (adhered)
PVC 1.3.1-3 Protected Membrane Roof Assembly (typical)

2 SUPPORTING STRUCTURES: Decks and Walls

3 SECURING the ROOF ASSEMBLY

4 MATERIALS

5 DECK and WALL OVERLAYS

6 AIR and VAPOUR CONTROLS

6.3.1 Air and Vapour Controls (field)

7 INSULATION

8 INSULATION OVERLAYS

9 FIELD MEMBRANE

10 PERIMETERS and WALLS


11 DRAINS and PENETRATIONS

12 PROTECTED MEMBRANES and OTHER DETAILS

13 METAL FLASHINGS

14 THE ROOF as a PLATFORM