SBS 10.3.1-3 Perimeter Membrane Termination (stucco wall, replacement roofing)
SBS 10.3.1-3 Perimeter Membrane Termination (stucco wall, replacement roofing)
RoofStar Guarantee Standards are blue-linked |
SBS Details
1 WORK INCLUDED
- (1) Air or Vapour Control Layers
- The requirement for a vapour retarder is determined by the design authority.
- (2) Insulation
- See available insulation products in the Accepted Materials section of this Manual.
- (3) Insulation Overlay
- Where required.
- (4) Primary Membrane and Membrane Protection
- (5) Membrane Flashing
- Carried up wall minimum 200 mm (8") above roof surface. Caulked at top edge.
- (6) Wall Base Flashing
- Install as detailed. Slide behind building paper under stucco.
- (7) Metal Flashing Fasteners
- Appropriate fasteners depending on parapet construction, at maximum 300 mm (12") o.c.
- (8) Reglet
- To cover lower reglet assembly. Install as detailed.
- (9) Caulking
- Polyurethane sealant, fill to top of flashing and crown to promote drainage.
2 RELATED WORK BY OTHERS
- (A) Acceptable Supporting Deck Structure
- (B) Wood Blocking
- (C) Wall Finish
- Concrete finish or wood sheathing.
- (D) Existing Stucco
- Saw cut 250 mm (10") above roof surface.
NOTE: AVOID SURFACE REGLET: Written permission required for the RoofStar Guarantee.
NOTE: Refer to RoofStar Guarantee Standards for additional requirements.
Back to RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies