Difference between revisions of "SBS Control Joint (Roof Divider)"

Jump to: navigation, search

Difference between revisions of "SBS Control Joint (Roof Divider)"

Line 43: Line 43:
 
[[SBS Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''SBS Construction Details'']]
 
[[SBS Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''SBS Construction Details'']]
  
[[Section:G. Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''Construction Details'']]
+
[[Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''Construction Details'']]

Revision as of 15:43, 21 September 2016

RoofStar Guarantee Standards are blue-linked
SBS Details

10.3.4.2.jpg

1 WORK INCLUDED

(1) Gypsum Deck Overlay
If required by design authority.
(2) Vapour Retarder
If required by design authority.
(3) Insulation
See available insulation products in the Accepted Materials section of this Manual.
(4) Insulation Overlay Board
Where required.
(5) Primary Membrane and Membrane Protection
(6) Membrane Flashing
Lap over top and mechanically fasten.
(7) Base Metal Flashing
Mechanically fasten to top of wood blocking. Optional on flexible membrane systems. Required on assemblies using gravel ballast filter mats.
(8) Metal Cap Flashing
NOTE: (7) and (8) may be one piece.

2 RELATED WORK BY OTHERS

(A) Acceptable Deck
(B) Control Joint Assembly
Required to separate new systems from existing roof systems and at dissimilar roof decks or on BUR assemblies over 45 m x 45 m (150’ x 150’). Primed where applicable. Slope top if wider than 100 mm (4").
(C) Existing Roof Assembly
If applicable. Prepared for application of membrane flashing at control joint.

NOTE: Refer to RoofStar Guarantee Standards for additional requirements.




Back to SBS Application

Back to SBS Construction Details

Back to Construction Details