Difference between revisions of "SBS Structural Planter"

Jump to: navigation, search

Difference between revisions of "SBS Structural Planter"

(Created page with "<hr> File:D1.7.8.jpg File:D1.7.8a.jpg === WORK INCLUDED === ;(1) Primer: :Application method and coverage rate as approved by Primary Membrane Manufacturer. ;(2)...")
 
(28 intermediate revisions by the same user not shown)
Line 1: Line 1:
<hr>
+
{| class="wikitable" | style="color: black; background-color: orange; width: 100%;text-align:center"
[[File:D1.7.8.jpg]]
+
| colspan="2"  | <big>'''''RoofStar Guarantee Standards''''' are <span style="color:#6495ed">'''blue-linked'''</span></big>
 +
|}
 +
<div class="panel panel-success">
 +
<div class="panel-heading"><big>'''SBS Details'''</big></div>
 +
<div class="panel-body">
 +
<div class="col-md-6">
 +
<div style="text-align:center; vertical-align:center">
 +
[[File:D1.7.6-5 (1).jpg|class=img-responsive]]
 +
 
 +
[[File:D1.7.6-5 (2).jpg|class=img-responsive]]
 +
</div>
 +
 
 +
 
 +
 
 +
::Click below for a printable version of this page.
 +
 
 +
<div style="width:150px; text-align: left;">
 +
:[[File:Pdf.png|100 px|link=http://rpm.rcabc.org/images/7/7e/D1.7.6-5_Print_Sheet.pdf|'''Print Sheet''']]
 +
</div>
  
[[File:D1.7.8a.jpg]]
 
  
 +
</div><!-- COL-MD-6 -->
  
 +
<div class="col-md-6">
 
=== WORK INCLUDED ===
 
=== WORK INCLUDED ===
;(1)  Primer:
+
;(1)  '''Primer''': Application method and coverage rate as approved by Primary Membrane Manufacturer.
:Application method and coverage rate as approved by Primary Membrane Manufacturer.
+
;(2) [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#SBSBASE|'''Primary Roof Membrane''']]: Modified Bituminous base and cap sheet membranes installed as per manufacturer's published application specifications.  
;(2) Primary Roof Membrane:
+
;(3) [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#SBSPRECURB|'''Pre-Curb (Start-Up Curb) Membrane Flashing''']]: Modified Bituminous base and cap sheet membrane flashing installed as per manufacturer's published application specifications.  
:Modified Bituminous base and cap sheet membranes installed as per manufacturer&#8217;s published application specifications.  
+
;(4)  [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#SBSLIQUIDDETAILS|'''Proprietary Liquid Membrane Flashing''']]: RoofStar Guarantee Program accepted Liquid Membrane Flashing System(s) or hot melt SBS modified bitumen. (NOTE: Refer to [[Flexible Membrane Roofing Systems: Liquid Membrane Flashing Systems|'''Liquid Membrane Flashing Systems''']] in the Accepted Materials section of this Manual). Install as per Manufacturer's published instructions.
;(3) Pre-Curb (Start-Up Curb) Membrane Flashing:
+
;(5)  [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#SBS-STRIPPING|'''Inside Planter Wall Membrane Flashing''']]: Adhered according to manufacturer's specifications using cold adhesive, self-adhered or torch-applied membrane.  Torching directly to wood surfaces is not permitted. Carry membrane flashing plies to reglet termination near top of planter wall (stagger membrane seal minimum 300mm (6").
:Modified Bituminous base and cap sheet membrane flashing installed as per manufacturer&#8217;s published application specifications.  
+
;(6)  [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#METALCAP-SBS|'''Reglet - Metal Counter Flashing''']]: As required by the ''RoofStar Guarantee Standards''. Note that a coping flashing may be paired with the reglet flashing, as illustrated.
;(4)  Proprietary liquid membrane flashing System:  
+
;(7)  '''Plaza Deck / Planter Interior Assembly''': Extruded polystyrene insulation and filter mat over primary roof membranes. Concrete pavers placed above pre-curb membrane flashing height, on proprietary pedestals. Note: membrane flashing is not permitted above pre-curb membrane flashing on plaza deck side of planter walls.
:RGC accepted Liquid Membrane Flashing System(s) (Refer to RPM Section2.2, Section 5.2) or hot melt SBS modified bitumen. Install as per the Manufacturer&#8217;s published instructions.
 
;(5)  Inside  
 
:Planter Wall Membrane Flashing: Adhered according to manufacturer&#8217;s specifications using cold adhesive, self- adhered or torch applied membrane.  Torching directly to wood surfaces is not permitted. Carry membrane flashing plies to reglet termination near top of planter wall (stagger membrane seal minimum 300mm (6&#8221;).
 
;(6)  Reglet  
 
:Metal Counter Flashing: As required by <i>RGC Guarantee Standards</i>. (See RGC Guarantee Standard A6.9)
 
;(7)  Plaza Deck Assembly:
 
:Extruded polystyrene insulation and filter mat over primary roof membranes. Concrete pavers placed above pre-curb membrane flashing height, on proprietary pedestals. Note: membrane flashing is not permitted above pre-curb membrane flashing on plaza deck side of planter walls.
 
  
 +
<hr>
  
 
=== RELATED WORK BY OTHERS ===
 
=== RELATED WORK BY OTHERS ===
;(A) Acceptable Deck:
+
;(A) [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#SBSDECKS|'''Acceptable Supporting Deck Structure''']]: Concrete slab shown. Each planter area must have a drain through the roof deck.
:Concrete slab shown. Each planter area must have a drain through the roof deck.
+
;(B) '''Pre-Curb''': Minimum of 100mm (4") in height above concrete deck, smooth dry and clean.  
;(B) Pre- Curb:
+
;(C) '''Cast over Concrete Planter Wall''': Form on top of membrane sealed Pre-curbs or Start-up curbs.
:Minimum of 100mm (4&#8221;) in height above concrete deck, smooth dry and clean.  
+
;(D) '''Re-Bar''': Placed at centre of Pre-curb.
;(C) Cast over Concrete Planter Wall:
+
;(E) [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#METALCAP-SBS|'''Reglet''']]: Premanufactured purpose-made reglet cast in concrete wall or saw-cut.  
:Form on top of membrane sealed Pre-curbs or Start-up curbs.
+
;(F) '''Alternate Termination''': Horizontal Reglet alternative to pre-manufactured purpose-made reglet, cast in concrete wall or saw-cut on vertical surface of inside planter walls.
;(D) Re-Bar:
+
</div><!-- COL-6-MD -->
:Placed a centre of Pre-curb.
+
</div><!-- PANEL BODY -->
;(E) Reglet:
+
</div><!-- PANEL -->
:Premanufactured purpose-made reglet cast in concrete wall or saw-cut.  
+
 
;(F) Alternate Termination:
+
'''NOTE''': Refer to '''''RoofStar Guarantee Standards''''' for additional requirements.
:Horizontal Reglet alternative to premanufactured purpose-made reglet cast in concrete wall or saw-cut on vertical surface of inside planter walls.
 
  
NOTE: Refer to <i>RGC Guarantee Standards</i> for additional requirements.
 
  
 
<hr>
 
<hr>
  
  
 +
[[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies |<i class="fa fa-chevron-circle-left fa" ></i> Back to ''RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies'']]
  
[[Section:D. Application: Low Slope Roofs|<i class="fa fa-chevron-circle-left fa-2x" ></i> Back to ''SBS Application'']]
+
[[SBS Modified Bitumen Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''SBS Modified Bitumen Construction Details'']]
 
 
[[SBS Construction Details|<i class="fa fa-chevron-circle-left fa-2x" ></i> Back to ''SBS Construction Details'']]
 
  
[[Section:G. Construction Details|<i class="fa fa-chevron-circle-left fa-2x" ></i> Back to ''Construction Details'']]
+
[[Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''Construction Details'']]

Revision as of 19:40, 5 December 2019

RoofStar Guarantee Standards are blue-linked
SBS Details

D1.7.6-5 (1).jpg

D1.7.6-5 (2).jpg


Click below for a printable version of this page.
Print Sheet


1 WORK INCLUDED

(1) Primer
Application method and coverage rate as approved by Primary Membrane Manufacturer.
(2) Primary Roof Membrane
Modified Bituminous base and cap sheet membranes installed as per manufacturer's published application specifications.
(3) Pre-Curb (Start-Up Curb) Membrane Flashing
Modified Bituminous base and cap sheet membrane flashing installed as per manufacturer's published application specifications.
(4) Proprietary Liquid Membrane Flashing
RoofStar Guarantee Program accepted Liquid Membrane Flashing System(s) or hot melt SBS modified bitumen. (NOTE: Refer to Liquid Membrane Flashing Systems in the Accepted Materials section of this Manual). Install as per Manufacturer's published instructions.
(5) Inside Planter Wall Membrane Flashing
Adhered according to manufacturer's specifications using cold adhesive, self-adhered or torch-applied membrane. Torching directly to wood surfaces is not permitted. Carry membrane flashing plies to reglet termination near top of planter wall (stagger membrane seal minimum 300mm (6").
(6) Reglet - Metal Counter Flashing
As required by the RoofStar Guarantee Standards. Note that a coping flashing may be paired with the reglet flashing, as illustrated.
(7) Plaza Deck / Planter Interior Assembly
Extruded polystyrene insulation and filter mat over primary roof membranes. Concrete pavers placed above pre-curb membrane flashing height, on proprietary pedestals. Note: membrane flashing is not permitted above pre-curb membrane flashing on plaza deck side of planter walls.

2 RELATED WORK BY OTHERS

(A) Acceptable Supporting Deck Structure
Concrete slab shown. Each planter area must have a drain through the roof deck.
(B) Pre-Curb
Minimum of 100mm (4") in height above concrete deck, smooth dry and clean.
(C) Cast over Concrete Planter Wall
Form on top of membrane sealed Pre-curbs or Start-up curbs.
(D) Re-Bar
Placed at centre of Pre-curb.
(E) Reglet
Premanufactured purpose-made reglet cast in concrete wall or saw-cut.
(F) Alternate Termination
Horizontal Reglet alternative to pre-manufactured purpose-made reglet, cast in concrete wall or saw-cut on vertical surface of inside planter walls.

NOTE: Refer to RoofStar Guarantee Standards for additional requirements.




Back to RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies

Back to SBS Modified Bitumen Construction Details

Back to Construction Details