http://rpm.rcabc.org/index.php?title=Special:NewPages&feed=atom&hideredirs=1&limit=50&offset=&namespace=0&username=&tagfilter=&size-mode=max&size=0RCABC Roofing Practices Manual - New pages [en]2024-03-19T08:08:05ZFrom RCABC Roofing Practices ManualMediaWiki 1.31.1http://rpm.rcabc.org/index.php?title=RimkusRimkus2024-03-11T18:28:53Z<p>James Klassen: </p>
<hr />
<div>{{Template:RPM Info}}<br />
__NOTOC__<br />
__NONUMBEREDHEADINGS__<br />
{{DISPLAYTITLE:<span style="position: absolute; clip: rect(1px 1px 1px 1px); clip: rect(1px, 1px, 1px, 1px);">{{FULLPAGENAME}}</span>}}<br />
<br />
<big><big>Other Services (Division C)</big></big><br />
<hr><br />
<big><big><big><big><big>Rimkus</big></big></big></big></big><br><br />
<big>Integrity Scanning</big><br />
<br />
{| class="wikitable"<br />
|-<br />
| '''Service Provider''': Rimkus<br />
<br />
;Website: '''https://rimkus.com/locations/vancouver-canada/'''<br />
;Contact Address: <br />
:6900 Graybar Road<br />
:Suite 2230<br />
:Richmond, British Columbia V6W 0A5<br />
|}<br />
<br />
<hr><br />
<br />
[[Division C: Accepted Materials |<i class="fa fa-chevron-circle-left" ></i> ''Accepted Materials'']]<br />
<br />
[[Main Page | <i class="fa fa-home fa"></i> Home]]<br />
{{Template:RPM Page Footer with Copyright and Current Date}}<br />
</div></div>James Klassenhttp://rpm.rcabc.org/index.php?title=PVC_Membrane_Termination_FPVC Membrane Termination F2024-02-26T16:44:45Z<p>James Klassen: Created page with "{{Template:RPM Info}} {{DISPLAYTITLE:<span style="position: absolute; clip: rect(1px 1px 1px 1px); clip: rect(1px, 1px, 1px, 1px);">{{FULLPAGENAME}}</span>}} __NOTOC__ <bi..."</p>
<hr />
<div>{{Template:RPM Info}}<br />
<br />
<br />
<br />
{{DISPLAYTITLE:<span style="position: absolute; clip: rect(1px 1px 1px 1px); clip: rect(1px, 1px, 1px, 1px);">{{FULLPAGENAME}}</span>}}<br />
__NOTOC__<br />
<br />
<big><big>Division D - Construction Details</big></big><br />
<hr><br />
<big><big><big><big><big>PVC | Membrane Termination F (Wall) ([[PVC_Roof_Systems_Standard#10.3.2.3._General_Application_Requirements_for_Perimeters_and_Walls | Article 10.3.2.3.]])</big></big></big></big></big><br />
{{Template:Construction Details Header}}<br />
<div class="panel panel-success"><br />
<div class="panel-heading"><big>'''PVC Details'''</big></div><br />
<div class="panel-body"><br />
<div class="col-md-6"><br />
<div style="text-align:center; vertical-align:center"><br />
<br><br />
[[File:10.3.2.3.-PVC-F.png|class=img-responsive | link=https://rpm.rcabc.org/images/b/b9/10.3.2.3.-PVC-F.png]]<br />
:Drawing NTS<br />
</div><br />
</div><!-- COL-6-MD --><br />
<br />
<div class="col-md-6"><br />
=== WORK INCLUDED ===<br />
<br />
;(1) [[PVC Roof Systems Standard#PART_6|<big>Air/Vapour Control Layers</big>]]: <br />
:As specified by the ''Design Authority'' and installed to provide continuity for optimal control.<br />
;(2) [[PVC Roof Systems Standard#PART_7|<big>Insulation</big>]]:<br />
:Installed in keeping with Section 7.3. Multiple layering illustrated; layers must be offset and staggered at least 304.8 mm (12”) in each direction.<br />
;(3) [[PVC Roof Systems Standard#PART_8|<big>Insulation Overlay Panel</big>]]:<br />
:Required for fully adhered membrane systems or when overburden is specified. Panels must be offset and staggered from underlying insulation panels.<br />
;(4) [[PVC Roof Systems Standard#PART_9|<big>Field Membrane</big>]]:<br />
:See Table 9.2. for permissible application methods and corresponding membrane properties. Membrane must be installed according to the requirements in Section 9.3.<br />
;(5) [[PVC Roof Systems Standard#PART_10|<big>Edge Securement</big>]]:<br />
:Proprietary to the membrane manufacturer. Edge securement is required, irrespective of how the membrane is applied (i.e., adhered, self-adhered, mechanically fastened).<br />
;(6) [[PVC Roof Systems Standard#PART_10|<big>Mechanical Fastening</big>]]:<br />
:Edge securement must be anchored to the roof structure to prevent membrane movement.<br />
;(7) [[PVC Roof Systems Standard#PART_10|<big>Primer or Adhesive</big>]]:<br />
:Proprietary to the membrane manufacturer. Primer may be required for self-adhered membranes; adhesive is required for all other applications. All membranes applied to the vertical substrate must be fully adhered.<br />
;(8) [[PVC Roof Systems Standard#PART_10|<big>Membrane Flashing</big>]]:<br />
:May be run continuously up the vertical substrate from the field or installed as separate flashing (see membrane manufacturer requirements). Membrane shall be carried up the vertical substrate at least 203.2 mm (8”) above the ''finished roof system surface'', plus at least 76.2 mm (3”) for wall control layer overlap. In regions where heavy snow accumulation is possible, or to accommodate future roof membrane replacement, membrane should be carried at least 304.8 mm (12”) up the vertical substrate.<br />
;(9) [[PVC Roof Systems Standard#PART_10|<big>Primary Surface Reglet Counter-flashing and Sealant</big>]]:<br />
:Surface reglet counter-flashing with bead of sealant applied in reglet cut. In this illustration, the linear metal flashing serves to secure the membrane. All membranes applied to a vertical surface must be mechanically fastened.<br />
;(10) [[PVC Roof Systems Standard#PART_10|<big>Secondary Surface Reglet Counter-flashing and Sealant</big>]]:<br />
:Surface reglet counter-flashing with bead of sealant applied in reglet cut. This flashing provides secondary protection for the primary surface reglet/counter-flashing and safe-guards the sealant from weather-induced deterioration and mechanical damage.<br />
<br />
=== RELATED WORK BY OTHERS ===<br />
;(A) [[PVC Roof Systems Standard#PART_2|<big>Acceptable Deck</big>]]<br />
:Illustrated deck is representative. See Sub-section 2.1.5. for acceptable ''deck'' types and conditions.<br />
;(B) [[PVC Roof Systems Standard#PART_2|<big>Wall Structure</big>]]<br />
:Illustrated wall is representative. Wall control layers (i.e. water resistive barrier) must overlap ''roofing system'' to achieve ''continuity''. See Sub-section 2.1.7. for wall conditions.<br />
<br />
</div><!-- COL-6-MD --><br />
</div><!-- PANEL BODY --><br />
</div><!-- PANEL --><br />
<br />
'''NOTE''': See the [[PVC Roof Systems Standard | '''PVC Roof Systems Standard''']] for additional requirements.<br />
<br />
<hr><br />
<br />
[[PVC Roof System Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''PVC Roof System Details'']]<br />
<br />
[[Main Page | <i class="fa fa-home fa"></i> Home]]<br />
<br />
{{Template:RPM Page Footer with Copyright and Current Date}}</div>James Klassenhttp://rpm.rcabc.org/index.php?title=PVC_Membrane_Termination_EPVC Membrane Termination E2024-02-26T16:44:13Z<p>James Klassen: Created page with "{{Template:RPM Info}} {{DISPLAYTITLE:<span style="position: absolute; clip: rect(1px 1px 1px 1px); clip: rect(1px, 1px, 1px, 1px);">{{FULLPAGENAME}}</span>}} __NOTOC__ <bi..."</p>
<hr />
<div>{{Template:RPM Info}}<br />
<br />
<br />
<br />
{{DISPLAYTITLE:<span style="position: absolute; clip: rect(1px 1px 1px 1px); clip: rect(1px, 1px, 1px, 1px);">{{FULLPAGENAME}}</span>}}<br />
__NOTOC__<br />
<br />
<big><big>Division D - Construction Details</big></big><br />
<hr><br />
<big><big><big><big><big>PVC | Membrane Termination E (Wall) ([[PVC_Roof_Systems_Standard#10.3.2.3._General_Application_Requirements_for_Perimeters_and_Walls | Article 10.3.2.3.]])</big></big></big></big></big><br />
{{Template:Construction Details Header}}<br />
<div class="panel panel-success"><br />
<div class="panel-heading"><big>'''PVC Details'''</big></div><br />
<div class="panel-body"><br />
<div class="col-md-6"><br />
<div style="text-align:center; vertical-align:center"><br />
<br><br />
[[File:10.3.2.3.-PVC-E.png|class=img-responsive | link=https://rpm.rcabc.org/images/b/b6/10.3.2.3.-PVC-E.png]]<br />
:Drawing NTS<br />
</div><br />
</div><!-- COL-6-MD --><br />
<br />
<div class="col-md-6"><br />
=== WORK INCLUDED ===<br />
<br />
;(1) [[PVC Roof Systems Standard#PART_6|<big>Air/Vapour Control Layers</big>]]: <br />
:As specified by the ''Design Authority'' and installed to provide continuity for optimal control.<br />
;(2) [[PVC Roof Systems Standard#PART_7|<big>Insulation</big>]]:<br />
:Installed in keeping with Section 7.3. Multiple layering illustrated; layers must be offset and staggered at least 304.8 mm (12”) in each direction.<br />
;(3) [[PVC Roof Systems Standard#PART_8|<big>Insulation Overlay Panel</big>]]:<br />
:Required for fully adhered membrane systems or when overburden is specified. Panels must be offset and staggered from underlying insulation panels.<br />
;(4) [[PVC Roof Systems Standard#PART_9|<big>Field Membrane</big>]]:<br />
:See Table 9.2. for permissible application methods and corresponding membrane properties. Membrane must be installed according to the requirements in Section 9.3.<br />
;(5) [[PVC Roof Systems Standard#PART_10|<big>Edge Securement</big>]]:<br />
:Proprietary to the membrane manufacturer. Edge securement is required, irrespective of how the membrane is applied (i.e., adhered, self-adhered, mechanically fastened).<br />
;(6) [[PVC Roof Systems Standard#PART_10|<big>Mechanical Fastening</big>]]:<br />
:Edge securement must be anchored to the roof structure to prevent membrane movement.<br />
;(7) [[PVC Roof Systems Standard#PART_10|<big>Primer or Adhesive</big>]]:<br />
:Proprietary to the membrane manufacturer. Primer may be required for self-adhered membranes; adhesive is required for all other applications. All membranes applied to the vertical substrate must be fully adhered.<br />
;(8) [[PVC Roof Systems Standard#PART_10|<big>Membrane Flashing</big>]]:<br />
:May be run continuously up the vertical substrate from the field or installed as separate flashing (see membrane manufacturer requirements). Membrane shall be carried up the vertical substrate at least 203.2 mm (8”) above the ''finished roof system surface'', plus at least 76.2 mm (3”) for wall control layer overlap. In regions where heavy snow accumulation is possible, or to accommodate future roof membrane replacement, membrane should be carried at least 304.8 mm (12”) up the vertical substrate.<br />
;(9) [[PVC Roof Systems Standard#PART_10|<big>Membrane Edge Securement and Sealant</big>]]:<br />
:All membranes applied to a vertical surface must be mechanically fastened. Mechanically fastened termination (“term”) bar with tooled sealant shown.<br />
;(10) [[PVC Roof Systems Standard#PART_10|<big>Surface Reglet Counter-flashing and Sealant</big>]]:<br />
:Surface reglet counter-flashing with bead of sealant applied in reglet cut. This flashing provides secondary protection for the “term” bar and safe-guards the sealant from weather-induced deterioration and mechanical damage.<br />
<br />
=== RELATED WORK BY OTHERS ===<br />
;(A) [[PVC Roof Systems Standard#PART_2|<big>Acceptable Deck</big>]]<br />
:Illustrated deck is representative. See Sub-section 2.1.5. for acceptable ''deck'' types and conditions.<br />
;(B) [[PVC Roof Systems Standard#PART_2|<big>Wall Structure</big>]]<br />
:Illustrated wall is representative. Wall control layers (i.e. water resistive barrier) must overlap ''roofing system'' to achieve ''continuity''. See Sub-section 2.1.7. for wall conditions.<br />
<br />
</div><!-- COL-6-MD --><br />
</div><!-- PANEL BODY --><br />
</div><!-- PANEL --><br />
<br />
'''NOTE''': See the [[PVC Roof Systems Standard | '''PVC Roof Systems Standard''']] for additional requirements.<br />
<br />
<hr><br />
<br />
[[PVC Roof System Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''PVC Roof System Details'']]<br />
<br />
[[Main Page | <i class="fa fa-home fa"></i> Home]]<br />
<br />
{{Template:RPM Page Footer with Copyright and Current Date}}</div>James Klassenhttp://rpm.rcabc.org/index.php?title=PVC_Membrane_Termination_DPVC Membrane Termination D2024-02-26T16:43:33Z<p>James Klassen: Created page with "{{Template:RPM Info}} {{DISPLAYTITLE:<span style="position: absolute; clip: rect(1px 1px 1px 1px); clip: rect(1px, 1px, 1px, 1px);">{{FULLPAGENAME}}</span>}} __NOTOC__ <bi..."</p>
<hr />
<div>{{Template:RPM Info}}<br />
<br />
<br />
<br />
{{DISPLAYTITLE:<span style="position: absolute; clip: rect(1px 1px 1px 1px); clip: rect(1px, 1px, 1px, 1px);">{{FULLPAGENAME}}</span>}}<br />
__NOTOC__<br />
<br />
<big><big>Division D - Construction Details</big></big><br />
<hr><br />
<big><big><big><big><big>PVC | Membrane Termination D (Wall) ([[PVC_Roof_Systems_Standard#10.3.2.3._General_Application_Requirements_for_Perimeters_and_Walls | Article 10.3.2.3.]])</big></big></big></big></big><br />
{{Template:Construction Details Header}}<br />
<div class="panel panel-success"><br />
<div class="panel-heading"><big>'''PVC Details'''</big></div><br />
<div class="panel-body"><br />
<div class="col-md-6"><br />
<div style="text-align:center; vertical-align:center"><br />
<br><br />
[[File:10.3.2.3.-PVC-D.png|class=img-responsive | link=https://rpm.rcabc.org/images/3/3c/10.3.2.3.-PVC-D.png]]<br />
:Drawing NTS<br />
</div><br />
</div><!-- COL-6-MD --><br />
<br />
<div class="col-md-6"><br />
=== WORK INCLUDED ===<br />
<br />
;(1) [[PVC Roof Systems Standard#PART_6|<big>Air/Vapour Control Layers</big>]]: <br />
:As specified by the ''Design Authority'' and installed to provide continuity for optimal control.<br />
;(2) [[PVC Roof Systems Standard#PART_7|<big>Insulation</big>]]:<br />
:Installed in keeping with Section 7.3. Multiple layering illustrated; layers must be offset and staggered at least 304.8 mm (12”) in each direction.<br />
;(3) [[PVC Roof Systems Standard#PART_8|<big>Insulation Overlay Panel</big>]]:<br />
:Required for fully adhered membrane systems or when overburden is specified. Panels must be offset and staggered from underlying insulation panels.<br />
;(4) [[PVC Roof Systems Standard#PART_9|<big>Field Membrane</big>]]:<br />
:See Table 9.2. for permissible application methods and corresponding membrane properties. Membrane must be installed according to the requirements in Section 9.3.<br />
;(5) [[PVC Roof Systems Standard#PART_10|<big>Edge Securement</big>]]:<br />
:Proprietary to the membrane manufacturer. Edge securement is required, irrespective of how the membrane is applied (i.e., adhered, self-adhered, mechanically fastened).<br />
;(6) [[PVC Roof Systems Standard#PART_10|<big>Mechanical Fastening</big>]]:<br />
:Edge securement must be anchored to the roof structure to prevent membrane movement.<br />
;(7) [[PVC Roof Systems Standard#PART_10|<big>Primer or Adhesive</big>]]:<br />
:Proprietary to the membrane manufacturer. Primer may be required for self-adhered membranes; adhesive is required for all other applications. All membranes applied to the vertical substrate must be fully adhered.<br />
;(8) [[PVC Roof Systems Standard#PART_10|<big>Membrane Flashing</big>]]:<br />
:May be run continuously up the vertical substrate from the field or installed as separate flashing (see membrane manufacturer requirements). Membrane shall be carried up the vertical substrate at least 203.2 mm (8”) above the ''finished roof system surface'', plus at least 76.2 mm (3”) for wall control layer overlap. In regions where heavy snow accumulation is possible, or to accommodate future roof membrane replacement, membrane should be carried at least 304.8 mm (12”) up the vertical substrate.<br />
;(9) [[PVC Roof Systems Standard#PART_10|<big>Membrane Edge Securement and Sealant</big>]]:<br />
:All membranes applied to a vertical surface must be mechanically fastened. Mechanically fastened termination (“term”) bar with tooled sealant shown.<br />
;(10) [[PVC Roof Systems Standard#PART_10|<big>Cut Reglet Counter-flashing and Sealant</big>]]:<br />
:Cut reglet counter-flashing with bead of sealant applied in reglet cut. This flashing provides secondary protection for the “term” bar and safe-guards the sealant from weather-induced deterioration and mechanical damage.<br />
<br />
=== RELATED WORK BY OTHERS ===<br />
;(A) [[PVC Roof Systems Standard#PART_2|<big>Acceptable Deck</big>]]<br />
:Illustrated deck is representative. See Sub-section 2.1.5. for acceptable ''deck'' types and conditions.<br />
;(B) [[PVC Roof Systems Standard#PART_2|<big>Wall Structure</big>]]<br />
:Illustrated wall is representative. Wall control layers (i.e. water resistive barrier) must overlap ''roofing system'' to achieve ''continuity''. See Sub-section 2.1.7. for wall conditions.<br />
<br />
</div><!-- COL-6-MD --><br />
</div><!-- PANEL BODY --><br />
</div><!-- PANEL --><br />
<br />
'''NOTE''': See the [[PVC Roof Systems Standard | '''PVC Roof Systems Standard''']] for additional requirements.<br />
<br />
<hr><br />
<br />
[[PVC Roof System Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''PVC Roof System Details'']]<br />
<br />
[[Main Page | <i class="fa fa-home fa"></i> Home]]<br />
<br />
{{Template:RPM Page Footer with Copyright and Current Date}}</div>James Klassenhttp://rpm.rcabc.org/index.php?title=PVC_Membrane_Termination_CPVC Membrane Termination C2024-02-26T16:42:53Z<p>James Klassen: Created page with "{{Template:RPM Info}} {{DISPLAYTITLE:<span style="position: absolute; clip: rect(1px 1px 1px 1px); clip: rect(1px, 1px, 1px, 1px);">{{FULLPAGENAME}}</span>}} __NOTOC__ <bi..."</p>
<hr />
<div>{{Template:RPM Info}}<br />
<br />
<br />
<br />
{{DISPLAYTITLE:<span style="position: absolute; clip: rect(1px 1px 1px 1px); clip: rect(1px, 1px, 1px, 1px);">{{FULLPAGENAME}}</span>}}<br />
__NOTOC__<br />
<br />
<big><big>Division D - Construction Details</big></big><br />
<hr><br />
<big><big><big><big><big>PVC | Membrane Termination C (Wall) ([[PVC_Roof_Systems_Standard#10.3.2.3._General_Application_Requirements_for_Perimeters_and_Walls | Article 10.3.2.3.]])</big></big></big></big></big><br />
{{Template:Construction Details Header}}<br />
<div class="panel panel-success"><br />
<div class="panel-heading"><big>'''PVC Details'''</big></div><br />
<div class="panel-body"><br />
<div class="col-md-6"><br />
<div style="text-align:center; vertical-align:center"><br />
<br><br />
[[File:10.3.2.3.-PVC-C.png|class=img-responsive | link=https://rpm.rcabc.org/images/8/88/10.3.2.3.-PVC-C.png]]<br />
:Drawing NTS<br />
</div><br />
</div><!-- COL-6-MD --><br />
<br />
<div class="col-md-6"><br />
=== WORK INCLUDED ===<br />
<br />
;(1) [[PVC Roof Systems Standard#PART_6|<big>Air/Vapour Control Layers</big>]]: <br />
:As specified by the ''Design Authority'' and installed to provide continuity for optimal control.<br />
;(2) [[PVC Roof Systems Standard#PART_7|<big>Insulation</big>]]:<br />
:Installed in keeping with Section 7.3. Multiple layering illustrated; layers must be offset and staggered at least 304.8 mm (12”) in each direction.<br />
;(3) [[PVC Roof Systems Standard#PART_8|<big>Insulation Overlay Panel</big>]]:<br />
:Required for fully adhered membrane systems or when overburden is specified. Panels must be offset and staggered from underlying insulation panels.<br />
;(4) [[PVC Roof Systems Standard#PART_9|<big>Field Membrane</big>]]:<br />
:See Table 9.2. for permissible application methods and corresponding membrane properties. Membrane must be installed according to the requirements in Section 9.3.<br />
;(5) [[PVC Roof Systems Standard#PART_10|<big>Edge Securement</big>]]:<br />
:Proprietary to the membrane manufacturer. Edge securement is required, irrespective of how the membrane is applied (i.e., adhered, self-adhered, mechanically fastened).<br />
;(6) [[PVC Roof Systems Standard#PART_10|<big>Mechanical Fastening</big>]]:<br />
:Edge securement must be anchored to the roof structure to prevent membrane movement.<br />
;(7) [[PVC Roof Systems Standard#PART_10|<big>Primer or Adhesive</big>]]:<br />
:Proprietary to the membrane manufacturer. Primer may be required for self-adhered membranes; adhesive is required for all other applications. All membranes applied to the vertical substrate must be fully adhered.<br />
;(8) [[PVC Roof Systems Standard#PART_10|<big>Membrane Flashing</big>]]:<br />
:May be run continuously up the vertical substrate from the field or installed as separate flashing (see membrane manufacturer requirements). Membrane shall be carried up the vertical substrate at least 203.2 mm (8”) above the ''finished roof system surface'', plus at least 76.2 mm (3”) for wall control layer overlap. In regions where heavy snow accumulation is possible, or to accommodate future roof membrane replacement, membrane should be carried at least 304.8 mm (12”) up the vertical substrate.<br />
;(9) [[PVC Roof Systems Standard#PART_10|<big>Membrane Edge Securement and Sealant</big>]]:<br />
:All membranes applied to a vertical surface must be mechanically fastened. 2-component fleece-reinforced PMMA/PUMA is illustrated, together with sealant applied to upper membrane edge (See [[PVC Roof Systems Standard#10.3.3.4. Liquid Membrane Flashing | Article 10.3.3.4.]] for application requirements); liquid membrane flashing must be compatible with the primary membrane and listed in [https://rpm.rcabc.org/index.php?title=Division_C Division C] of the RPM.<br />
<br />
=== RELATED WORK BY OTHERS ===<br />
;(A) [[PVC Roof Systems Standard#PART_2|<big>Acceptable Deck</big>]]<br />
:Illustrated deck is representative. See Sub-section 2.1.5. for acceptable ''deck'' types and conditions.<br />
;(B) [[PVC Roof Systems Standard#PART_2|<big>Wall Structure</big>]]<br />
:Illustrated wall is representative. Wall control layers (i.e. water resistive barrier) must overlap ''roofing system'' to achieve ''continuity''. See Sub-section 2.1.7. for wall conditions.<br />
<br />
</div><!-- COL-6-MD --><br />
</div><!-- PANEL BODY --><br />
</div><!-- PANEL --><br />
<br />
'''NOTE''': See the [[PVC Roof Systems Standard | '''PVC Roof Systems Standard''']] for additional requirements.<br />
<br />
<hr><br />
<br />
[[PVC Roof System Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''PVC Roof System Details'']]<br />
<br />
[[Main Page | <i class="fa fa-home fa"></i> Home]]<br />
<br />
{{Template:RPM Page Footer with Copyright and Current Date}}</div>James Klassenhttp://rpm.rcabc.org/index.php?title=PVC_Membrane_Termination_BPVC Membrane Termination B2024-02-26T16:42:15Z<p>James Klassen: Created page with "{{Template:RPM Info}} {{DISPLAYTITLE:<span style="position: absolute; clip: rect(1px 1px 1px 1px); clip: rect(1px, 1px, 1px, 1px);">{{FULLPAGENAME}}</span>}} __NOTOC__ <bi..."</p>
<hr />
<div>{{Template:RPM Info}}<br />
<br />
<br />
<br />
{{DISPLAYTITLE:<span style="position: absolute; clip: rect(1px 1px 1px 1px); clip: rect(1px, 1px, 1px, 1px);">{{FULLPAGENAME}}</span>}}<br />
__NOTOC__<br />
<br />
<big><big>Division D - Construction Details</big></big><br />
<hr><br />
<big><big><big><big><big>PVC | Membrane Termination B (Wall) ([[PVC_Roof_Systems_Standard#10.3.2.3._General_Application_Requirements_for_Perimeters_and_Walls | Article 10.3.2.3.]])</big></big></big></big></big><br />
{{Template:Construction Details Header}}<br />
<div class="panel panel-success"><br />
<div class="panel-heading"><big>'''PVC Details'''</big></div><br />
<div class="panel-body"><br />
<div class="col-md-6"><br />
<div style="text-align:center; vertical-align:center"><br />
<br><br />
[[File:10.3.2.3.-PVC-B.png|class=img-responsive | link=https://rpm.rcabc.org/images/7/7b/10.3.2.3.-PVC-B.png]]<br />
:Drawing NTS<br />
</div><br />
</div><!-- COL-6-MD --><br />
<br />
<div class="col-md-6"><br />
=== WORK INCLUDED ===<br />
<br />
;(1) [[PVC Roof Systems Standard#PART_6|<big>Air/Vapour Control Layers</big>]]: <br />
:As specified by the ''Design Authority'' and installed to provide continuity for optimal control.<br />
;(2) [[PVC Roof Systems Standard#PART_7|<big>Insulation</big>]]:<br />
:Installed in keeping with Section 7.3. Multiple layering illustrated; layers must be offset and staggered at least 304.8 mm (12”) in each direction.<br />
;(3) [[PVC Roof Systems Standard#PART_8|<big>Insulation Overlay Panel</big>]]:<br />
:Required for fully adhered membrane systems or when overburden is specified. Panels must be offset and staggered from underlying insulation panels.<br />
;(4) [[PVC Roof Systems Standard#PART_9|<big>Field Membrane</big>]]:<br />
:See Table 9.2. for permissible application methods and corresponding membrane properties. Membrane must be installed according to the requirements in Section 9.3.<br />
;(5) [[PVC Roof Systems Standard#PART_10|<big>Edge Securement</big>]]:<br />
:Proprietary to the membrane manufacturer. Edge securement is required, irrespective of how the membrane is applied (i.e., adhered, self-adhered, mechanically fastened).<br />
;(6) [[PVC Roof Systems Standard#PART_10|<big>Mechanical Fastening</big>]]:<br />
:Edge securement must be anchored to the roof structure to prevent membrane movement.<br />
;(7) [[PVC Roof Systems Standard#PART_10|<big>Primer or Adhesive</big>]]:<br />
:Proprietary to the membrane manufacturer. Primer may be required for self-adhered membranes; adhesive is required for all other applications. All membranes applied to the vertical substrate must be fully adhered.<br />
;(8) [[PVC Roof Systems Standard#PART_10|<big>Membrane Flashing</big>]]:<br />
:May be run continuously up the vertical substrate from the field or installed as separate flashing (see membrane manufacturer requirements). Membrane shall be carried up the vertical substrate at least 203.2 mm (8”) above the ''finished roof system surface'', plus at least 76.2 mm (3”) for wall control layer overlap. In regions where heavy snow accumulation is possible, or to accommodate future roof membrane replacement, membrane should be carried at least 304.8 mm (12”) up the vertical substrate.<br />
;(9) [[PVC Roof Systems Standard#PART_10|<big>Membrane Edge Securement and Sealant</big>]]:<br />
:All membranes applied to a vertical surface must be mechanically fastened. Fastener illustrated, together with sealant applied to upper membrane edge.<br />
<br />
=== RELATED WORK BY OTHERS ===<br />
;(A) [[PVC Roof Systems Standard#PART_2|<big>Acceptable Deck</big>]]<br />
:Illustrated deck is representative. See Sub-section 2.1.5. for acceptable ''deck'' types and conditions.<br />
;(B) [[PVC Roof Systems Standard#PART_2|<big>Wall Structure</big>]]<br />
:Illustrated wall is representative. Wall control layers (i.e. water resistive barrier) must overlap ''roofing system'' to achieve ''continuity''. See Sub-section 2.1.7. for wall conditions.<br />
;(C) <big>Wall System Finish</big><br />
:Illustrated system is representative and shows water-resistive barrier overlapping roof membrane (See above, Item 8).<br />
<br />
</div><!-- COL-6-MD --><br />
</div><!-- PANEL BODY --><br />
</div><!-- PANEL --><br />
<br />
'''NOTE''': See the [[PVC Roof Systems Standard | '''PVC Roof Systems Standard''']] for additional requirements.<br />
<br />
<hr><br />
<br />
[[PVC Roof System Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''PVC Roof System Details'']]<br />
<br />
[[Main Page | <i class="fa fa-home fa"></i> Home]]<br />
<br />
{{Template:RPM Page Footer with Copyright and Current Date}}</div>James Klassenhttp://rpm.rcabc.org/index.php?title=PVC_Membrane_Termination_APVC Membrane Termination A2024-02-26T16:41:36Z<p>James Klassen: Created page with "{{Template:RPM Info}} {{DISPLAYTITLE:<span style="position: absolute; clip: rect(1px 1px 1px 1px); clip: rect(1px, 1px, 1px, 1px);">{{FULLPAGENAME}}</span>}} __NOTOC__ <bi..."</p>
<hr />
<div>{{Template:RPM Info}}<br />
<br />
<br />
<br />
{{DISPLAYTITLE:<span style="position: absolute; clip: rect(1px 1px 1px 1px); clip: rect(1px, 1px, 1px, 1px);">{{FULLPAGENAME}}</span>}}<br />
__NOTOC__<br />
<br />
<big><big>Division D - Construction Details</big></big><br />
<hr><br />
<big><big><big><big><big>PVC | Membrane Termination A (Wall) ([[PVC_Roof_Systems_Standard#10.3.2.3._General_Application_Requirements_for_Perimeters_and_Walls | Article 10.3.2.3.]])</big></big></big></big></big><br />
{{Template:Construction Details Header}}<br />
<div class="panel panel-success"><br />
<div class="panel-heading"><big>'''PVC Details'''</big></div><br />
<div class="panel-body"><br />
<div class="col-md-6"><br />
<div style="text-align:center; vertical-align:center"><br />
<br><br />
[[File:10.3.2.3.-PVC-A.png |class=img-responsive | link=https://rpm.rcabc.org/images/f/fc/10.3.2.3.-PVC-A.png]]<br />
:Drawing NTS<br />
</div><br />
</div><!-- COL-6-MD --><br />
<br />
<div class="col-md-6"><br />
=== WORK INCLUDED ===<br />
<br />
;(1) [[PVC Roof Systems Standard#PART_6|<big>Air/Vapour Control Layers</big>]]: <br />
:As specified by the ''Design Authority'' and installed to provide continuity for optimal control.<br />
;(2) [[PVC Roof Systems Standard#PART_7|<big>Insulation</big>]]:<br />
:Installed in keeping with Section 7.3. Multiple layering illustrated; layers must be offset and staggered at least 304.8 mm (12”) in each direction.<br />
;(3) [[PVC Roof Systems Standard#PART_8|<big>Insulation Overlay Panel</big>]]:<br />
:Required for fully adhered membrane systems or when overburden is specified. Panels must be offset and staggered from underlying insulation panels.<br />
;(4) [[PVC Roof Systems Standard#PART_9|<big>Field Membrane</big>]]:<br />
:See Table 9.2. for permissible application methods and corresponding membrane properties. Membrane must be installed according to the requirements in Section 9.3.<br />
;(5) [[PVC Roof Systems Standard#PART_10|<big>Edge Securement</big>]]:<br />
:Proprietary to the membrane manufacturer. Edge securement is required, irrespective of how the membrane is applied (i.e., adhered, self-adhered, mechanically fastened).<br />
;(6) [[PVC Roof Systems Standard#PART_10|<big>Mechanical Fastening</big>]]:<br />
:Edge securement must be anchored to the roof structure to prevent membrane movement.<br />
;(7) [[PVC Roof Systems Standard#PART_10|<big>Primer or Adhesive</big>]]:<br />
:Proprietary to the membrane manufacturer. Primer may be required for self-adhered membranes; adhesive is required for all other applications. All membranes applied to the vertical substrate must be fully adhered.<br />
;(8) [[PVC Roof Systems Standard#PART_10|<big>Membrane Flashing</big>]]:<br />
:May be run continuously up the vertical substrate from the field or installed as separate flashing (see membrane manufacturer requirements). Membrane shall be carried up the vertical substrate at least 203.2 mm (8”) above the ''finished roof system surface'', plus at least 76.2 mm (3”) for wall control layer overlap. In regions where heavy snow accumulation is possible, or to accommodate future roof membrane replacement, membrane should be carried at least 304.8 mm (12”) up the vertical substrate.<br />
;(9) [[PVC Roof Systems Standard#PART_10|<big>Rigid Support for Through-wall Flashing (optional)</big>]]:<br />
:Where the ''wall'' is insulated on the exterior side of the structure, ''continuity'' of air and vapour controls must be protected from future damage during roof replacement. This can be done by securing a suitable membrane receiver panel against the insulation. The panel must be permanently affixed to the structure through the insulation. During replacement of the roof membrane, membrane flashing may be removed from the receiver panel without disturbing the insulation and control layers. In this way, material waste is also reduced.<br />
<br />
:Where the membrane may not easily separate from its receiver during roof replacement, a second panel (not illustrated) can be screw-fastened to the first. During replacement, both the membrane and the secondary panel may be removed together, simplifying membrane replacement.<br />
;(10) [[PVC Roof Systems Standard#PART_10|<big>Membrane Flashing Substrate</big>]]:<br />
:''Continuity'' of the water-resistive barrier means it must pass through the insulation assembly installed on the exterior side of the wall structure. To do that, a membrane flashing passes through the insulation where the ''roof system'' terminates. Blocking or another suitable support (i.e., hat track) is necessary to support the membrane and its linear metal flashing carrier. Wood blocking illustrated.<br />
;(10) [[PVC Roof Systems Standard#PART_10|<big>Through-wall Flashing</big>]]:<br />
:A self-adhered membrane is used to transition from the ''wall'' to the ''roofing assembly'', providing a continuous drainage path for water. Secure the ''linear metal flashing'' to the support underneath (see Item 9 or 10 above). <br />
<br />
:Note that the water resistive barrier membrane from the ''wall'' (installed by others – see Related Work below) overlaps the through-wall flashing (installed by the ''Contractor'') and is supported by a metal flashing with drip edge, to direct water from the wall to the roof surface.<br />
<br />
=== RELATED WORK BY OTHERS ===<br />
;(A) [[PVC Roof Systems Standard#PART_2|<big>Acceptable Deck</big>]]<br />
:Illustrated deck is representative. See Sub-section 2.1.5. for acceptable ''deck'' types and conditions.<br />
;(B) [[PVC Roof Systems Standard#PART_2|<big>Wall Structure</big>]]<br />
:Illustrated wall is representative. Wall control layers (i.e., water resistive barrier) must overlap ''roofing system'' to achieve ''continuity''. See Sub-section 2.1.7. for wall conditions.<br />
;(C) <big>Wall System Finish</big><br />
:Illustrated system is representative and shows water-resistive barrier overlapping roof membrane (See above, Item 8).<br />
<br />
</div><!-- COL-6-MD --><br />
</div><!-- PANEL BODY --><br />
</div><!-- PANEL --><br />
<br />
'''NOTE''': See the [[PVC Roof Systems Standard | '''PVC Roof Systems Standard''']] for additional requirements.<br />
<br />
<hr><br />
<br />
[[PVC Roof System Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''PVC Roof System Details'']]<br />
<br />
[[Main Page | <i class="fa fa-home fa"></i> Home]]<br />
<br />
{{Template:RPM Page Footer with Copyright and Current Date}}</div>James Klassenhttp://rpm.rcabc.org/index.php?title=TPO_Membrane_Termination_FTPO Membrane Termination F2024-02-26T16:39:21Z<p>James Klassen: Created page with "{{Template:RPM Info}} {{DISPLAYTITLE:<span style="position: absolute; clip: rect(1px 1px 1px 1px); clip: rect(1px, 1px, 1px, 1px);">{{FULLPAGENAME}}</span>}} __NOTOC__ <bi..."</p>
<hr />
<div>{{Template:RPM Info}}<br />
<br />
<br />
<br />
{{DISPLAYTITLE:<span style="position: absolute; clip: rect(1px 1px 1px 1px); clip: rect(1px, 1px, 1px, 1px);">{{FULLPAGENAME}}</span>}}<br />
__NOTOC__<br />
<br />
<big><big>Division D - Construction Details</big></big><br />
<hr><br />
<big><big><big><big><big>TPO | Membrane Termination F (Wall) ([[TPO_Roof_Systems_Standard#10.3.2.3._General_Application_Requirements_for_Perimeters_and_Walls | Article 10.3.2.3.]])</big></big></big></big></big><br />
{{Template:Construction Details Header}}<br />
<div class="panel panel-success"><br />
<div class="panel-heading"><big>'''TPO Details'''</big></div><br />
<div class="panel-body"><br />
<div class="col-md-6"><br />
<div style="text-align:center; vertical-align:center"><br />
<br><br />
[[File:10.3.2.3.-TPO-F.png|class=img-responsive | link=https://rpm.rcabc.org/images/0/02/10.3.2.3.-TPO-F.png]]<br />
:Drawing NTS<br />
</div><br />
</div><!-- COL-6-MD --><br />
<br />
<div class="col-md-6"><br />
=== WORK INCLUDED ===<br />
<br />
;(1) [[TPO Roof Systems Standard#PART_6|<big>Air/Vapour Control Layers</big>]]: <br />
:As specified by the ''Design Authority'' and installed to provide continuity for optimal control.<br />
;(2) [[TPO Roof Systems Standard#PART_7|<big>Insulation</big>]]:<br />
:Installed in keeping with Section 7.3. Multiple layering illustrated; layers must be offset and staggered at least 304.8 mm (12”) in each direction.<br />
;(3) [[TPO Roof Systems Standard#PART_8|<big>Insulation Overlay Panel</big>]]:<br />
:Required for fully adhered membrane systems or when overburden is specified. Panels must be offset and staggered from underlying insulation panels.<br />
;(4) [[TPO Roof Systems Standard#PART_9|<big>Field Membrane</big>]]:<br />
:See Table 9.2. for permissible application methods and corresponding membrane properties. Membrane must be installed according to the requirements in Section 9.3.<br />
;(5) [[TPO Roof Systems Standard#PART_10|<big>Edge Securement</big>]]:<br />
:Proprietary to the membrane manufacturer. Edge securement is required, irrespective of how the membrane is applied (i.e., adhered, self-adhered, mechanically fastened).<br />
;(6) [[TPO Roof Systems Standard#PART_10|<big>Mechanical Fastening</big>]]:<br />
:Edge securement must be anchored to the roof structure to prevent membrane movement.<br />
;(7) [[TPO Roof Systems Standard#PART_10|<big>Primer or Adhesive</big>]]:<br />
:Proprietary to the membrane manufacturer. Primer may be required for self-adhered membranes; adhesive is required for all other applications. All membranes applied to the vertical substrate must be fully adhered.<br />
;(8) [[TPO Roof Systems Standard#PART_10|<big>Membrane Flashing</big>]]:<br />
:May be run continuously up the vertical substrate from the field or installed as separate flashing (see membrane manufacturer requirements). Membrane shall be carried up the vertical substrate at least 203.2 mm (8”) above the ''finished roof system surface'', plus at least 76.2 mm (3”) for wall control layer overlap. In regions where heavy snow accumulation is possible, or to accommodate future roof membrane replacement, membrane should be carried at least 304.8 mm (12”) up the vertical substrate.<br />
;(9) [[TPO Roof Systems Standard#PART_10|<big>Primary Surface Reglet Counter-flashing and Sealant</big>]]:<br />
:Surface reglet counter-flashing with bead of sealant applied in reglet cut. In this illustration, the linear metal flashing serves to secure the membrane. All membranes applied to a vertical surface must be mechanically fastened.<br />
;(10) [[TPO Roof Systems Standard#PART_10|<big>Secondary Surface Reglet Counter-flashing and Sealant</big>]]:<br />
:Surface reglet counter-flashing with bead of sealant applied in reglet cut. This flashing provides secondary protection for the primary surface reglet/counter-flashing and safe-guards the sealant from weather-induced deterioration and mechanical damage.<br />
<br />
=== RELATED WORK BY OTHERS ===<br />
;(A) [[TPO Roof Systems Standard#PART_2|<big>Acceptable Deck</big>]]<br />
:Illustrated deck is representative. See Sub-section 2.1.5. for acceptable ''deck'' types and conditions.<br />
;(B) [[TPO Roof Systems Standard#PART_2|<big>Wall Structure</big>]]<br />
:Illustrated wall is representative. Wall control layers (i.e. water resistive barrier) must overlap ''roofing system'' to achieve ''continuity''. See Sub-section 2.1.7. for wall conditions.<br />
<br />
</div><!-- COL-6-MD --><br />
</div><!-- PANEL BODY --><br />
</div><!-- PANEL --><br />
<br />
'''NOTE''': See the [[TPO Roof Systems Standard | '''TPO Roof Systems Standard''']] for additional requirements.<br />
<br />
<hr><br />
<br />
[[TPO Roof System Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''TPO Roof System Details'']]<br />
<br />
[[Main Page | <i class="fa fa-home fa"></i> Home]]<br />
<br />
{{Template:RPM Page Footer with Copyright and Current Date}}</div>James Klassenhttp://rpm.rcabc.org/index.php?title=TPO_Membrane_Termination_ETPO Membrane Termination E2024-02-26T16:38:45Z<p>James Klassen: Created page with "{{Template:RPM Info}} {{DISPLAYTITLE:<span style="position: absolute; clip: rect(1px 1px 1px 1px); clip: rect(1px, 1px, 1px, 1px);">{{FULLPAGENAME}}</span>}} __NOTOC__ <bi..."</p>
<hr />
<div>{{Template:RPM Info}}<br />
<br />
<br />
<br />
{{DISPLAYTITLE:<span style="position: absolute; clip: rect(1px 1px 1px 1px); clip: rect(1px, 1px, 1px, 1px);">{{FULLPAGENAME}}</span>}}<br />
__NOTOC__<br />
<br />
<big><big>Division D - Construction Details</big></big><br />
<hr><br />
<big><big><big><big><big>TPO | Membrane Termination E (Wall) ([[TPO_Roof_Systems_Standard#10.3.2.3._General_Application_Requirements_for_Perimeters_and_Walls | Article 10.3.2.3.]])</big></big></big></big></big><br />
{{Template:Construction Details Header}}<br />
<div class="panel panel-success"><br />
<div class="panel-heading"><big>'''TPO Details'''</big></div><br />
<div class="panel-body"><br />
<div class="col-md-6"><br />
<div style="text-align:center; vertical-align:center"><br />
<br><br />
[[File:10.3.2.3.-TPO-E.png|class=img-responsive | link=https://rpm.rcabc.org/images/5/50/10.3.2.3.-TPO-E.png]]<br />
:Drawing NTS<br />
</div><br />
</div><!-- COL-6-MD --><br />
<br />
<div class="col-md-6"><br />
=== WORK INCLUDED ===<br />
<br />
;(1) [[TPO Roof Systems Standard#PART_6|<big>Air/Vapour Control Layers</big>]]: <br />
:As specified by the ''Design Authority'' and installed to provide continuity for optimal control.<br />
;(2) [[TPO Roof Systems Standard#PART_7|<big>Insulation</big>]]:<br />
:Installed in keeping with Section 7.3. Multiple layering illustrated; layers must be offset and staggered at least 304.8 mm (12”) in each direction.<br />
;(3) [[TPO Roof Systems Standard#PART_8|<big>Insulation Overlay Panel</big>]]:<br />
:Required for fully adhered membrane systems or when overburden is specified. Panels must be offset and staggered from underlying insulation panels.<br />
;(4) [[TPO Roof Systems Standard#PART_9|<big>Field Membrane</big>]]:<br />
:See Table 9.2. for permissible application methods and corresponding membrane properties. Membrane must be installed according to the requirements in Section 9.3.<br />
;(5) [[TPO Roof Systems Standard#PART_10|<big>Edge Securement</big>]]:<br />
:Proprietary to the membrane manufacturer. Edge securement is required, irrespective of how the membrane is applied (i.e., adhered, self-adhered, mechanically fastened).<br />
;(6) [[TPO Roof Systems Standard#PART_10|<big>Mechanical Fastening</big>]]:<br />
:Edge securement must be anchored to the roof structure to prevent membrane movement.<br />
;(7) [[TPO Roof Systems Standard#PART_10|<big>Primer or Adhesive</big>]]:<br />
:Proprietary to the membrane manufacturer. Primer may be required for self-adhered membranes; adhesive is required for all other applications. All membranes applied to the vertical substrate must be fully adhered.<br />
;(8) [[TPO Roof Systems Standard#PART_10|<big>Membrane Flashing</big>]]:<br />
:May be run continuously up the vertical substrate from the field or installed as separate flashing (see membrane manufacturer requirements). Membrane shall be carried up the vertical substrate at least 203.2 mm (8”) above the ''finished roof system surface'', plus at least 76.2 mm (3”) for wall control layer overlap. In regions where heavy snow accumulation is possible, or to accommodate future roof membrane replacement, membrane should be carried at least 304.8 mm (12”) up the vertical substrate.<br />
;(9) [[TPO Roof Systems Standard#PART_10|<big>Membrane Edge Securement and Sealant</big>]]:<br />
:All membranes applied to a vertical surface must be mechanically fastened. Mechanically fastened termination (“term”) bar with tooled sealant shown.<br />
;(10) [[TPO Roof Systems Standard#PART_10|<big>Surface Reglet Counter-flashing and Sealant</big>]]:<br />
:Surface reglet counter-flashing with bead of sealant applied in reglet cut. This flashing provides secondary protection for the “term” bar and safe-guards the sealant from weather-induced deterioration and mechanical damage.<br />
<br />
=== RELATED WORK BY OTHERS ===<br />
;(A) [[TPO Roof Systems Standard#PART_2|<big>Acceptable Deck</big>]]<br />
:Illustrated deck is representative. See Sub-section 2.1.5. for acceptable ''deck'' types and conditions.<br />
;(B) [[TPO Roof Systems Standard#PART_2|<big>Wall Structure</big>]]<br />
:Illustrated wall is representative. Wall control layers (i.e. water resistive barrier) must overlap ''roofing system'' to achieve ''continuity''. See Sub-section 2.1.7. for wall conditions.<br />
<br />
</div><!-- COL-6-MD --><br />
</div><!-- PANEL BODY --><br />
</div><!-- PANEL --><br />
<br />
'''NOTE''': See the [[TPO Roof Systems Standard | '''TPO Roof Systems Standard''']] for additional requirements.<br />
<br />
<hr><br />
<br />
[[TPO Roof System Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''TPO Roof System Details'']]<br />
<br />
[[Main Page | <i class="fa fa-home fa"></i> Home]]<br />
<br />
{{Template:RPM Page Footer with Copyright and Current Date}}</div>James Klassenhttp://rpm.rcabc.org/index.php?title=TPO_Membrane_Termination_DTPO Membrane Termination D2024-02-26T16:38:00Z<p>James Klassen: Created page with "{{Template:RPM Info}} {{DISPLAYTITLE:<span style="position: absolute; clip: rect(1px 1px 1px 1px); clip: rect(1px, 1px, 1px, 1px);">{{FULLPAGENAME}}</span>}} __NOTOC__ <bi..."</p>
<hr />
<div>{{Template:RPM Info}}<br />
<br />
<br />
<br />
{{DISPLAYTITLE:<span style="position: absolute; clip: rect(1px 1px 1px 1px); clip: rect(1px, 1px, 1px, 1px);">{{FULLPAGENAME}}</span>}}<br />
__NOTOC__<br />
<br />
<big><big>Division D - Construction Details</big></big><br />
<hr><br />
<big><big><big><big><big>TPO | Membrane Termination D (Wall) ([[TPO_Roof_Systems_Standard#10.3.2.3._General_Application_Requirements_for_Perimeters_and_Walls | Article 10.3.2.3.]])</big></big></big></big></big><br />
{{Template:Construction Details Header}}<br />
<div class="panel panel-success"><br />
<div class="panel-heading"><big>'''TPO Details'''</big></div><br />
<div class="panel-body"><br />
<div class="col-md-6"><br />
<div style="text-align:center; vertical-align:center"><br />
<br><br />
[[File:10.3.2.3.-TPO-D.png|class=img-responsive | link=https://rpm.rcabc.org/images/5/57/10.3.2.3.-TPO-D.png]]<br />
:Drawing NTS<br />
</div><br />
</div><!-- COL-6-MD --><br />
<br />
<div class="col-md-6"><br />
=== WORK INCLUDED ===<br />
<br />
;(1) [[TPO Roof Systems Standard#PART_6|<big>Air/Vapour Control Layers</big>]]: <br />
:As specified by the ''Design Authority'' and installed to provide continuity for optimal control.<br />
;(2) [[TPO Roof Systems Standard#PART_7|<big>Insulation</big>]]:<br />
:Installed in keeping with Section 7.3. Multiple layering illustrated; layers must be offset and staggered at least 304.8 mm (12”) in each direction.<br />
;(3) [[TPO Roof Systems Standard#PART_8|<big>Insulation Overlay Panel</big>]]:<br />
:Required for fully adhered membrane systems or when overburden is specified. Panels must be offset and staggered from underlying insulation panels.<br />
;(4) [[TPO Roof Systems Standard#PART_9|<big>Field Membrane</big>]]:<br />
:See Table 9.2. for permissible application methods and corresponding membrane properties. Membrane must be installed according to the requirements in Section 9.3.<br />
;(5) [[TPO Roof Systems Standard#PART_10|<big>Edge Securement</big>]]:<br />
:Proprietary to the membrane manufacturer. Edge securement is required, irrespective of how the membrane is applied (i.e., adhered, self-adhered, mechanically fastened).<br />
;(6) [[TPO Roof Systems Standard#PART_10|<big>Mechanical Fastening</big>]]:<br />
:Edge securement must be anchored to the roof structure to prevent membrane movement.<br />
;(7) [[TPO Roof Systems Standard#PART_10|<big>Primer or Adhesive</big>]]:<br />
:Proprietary to the membrane manufacturer. Primer may be required for self-adhered membranes; adhesive is required for all other applications. All membranes applied to the vertical substrate must be fully adhered.<br />
;(8) [[TPO Roof Systems Standard#PART_10|<big>Membrane Flashing</big>]]:<br />
:May be run continuously up the vertical substrate from the field or installed as separate flashing (see membrane manufacturer requirements). Membrane shall be carried up the vertical substrate at least 203.2 mm (8”) above the ''finished roof system surface'', plus at least 76.2 mm (3”) for wall control layer overlap. In regions where heavy snow accumulation is possible, or to accommodate future roof membrane replacement, membrane should be carried at least 304.8 mm (12”) up the vertical substrate.<br />
;(9) [[TPO Roof Systems Standard#PART_10|<big>Membrane Edge Securement and Sealant</big>]]:<br />
:All membranes applied to a vertical surface must be mechanically fastened. Mechanically fastened termination (“term”) bar with tooled sealant shown.<br />
;(10) [[TPO Roof Systems Standard#PART_10|<big>Cut Reglet Counter-flashing and Sealant</big>]]:<br />
:Cut reglet counter-flashing with bead of sealant applied in reglet cut. This flashing provides secondary protection for the “term” bar and safe-guards the sealant from weather-induced deterioration and mechanical damage.<br />
<br />
=== RELATED WORK BY OTHERS ===<br />
;(A) [[TPO Roof Systems Standard#PART_2|<big>Acceptable Deck</big>]]<br />
:Illustrated deck is representative. See Sub-section 2.1.5. for acceptable ''deck'' types and conditions.<br />
;(B) [[TPO Roof Systems Standard#PART_2|<big>Wall Structure</big>]]<br />
:Illustrated wall is representative. Wall control layers (i.e. water resistive barrier) must overlap ''roofing system'' to achieve ''continuity''. See Sub-section 2.1.7. for wall conditions.<br />
<br />
</div><!-- COL-6-MD --><br />
</div><!-- PANEL BODY --><br />
</div><!-- PANEL --><br />
<br />
'''NOTE''': See the [[PVC Roof Systems Standard | '''TPO Roof Systems Standard''']] for additional requirements.<br />
<br />
<hr><br />
<br />
[[TPO Roof System Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''TPO Roof System Details'']]<br />
<br />
[[Main Page | <i class="fa fa-home fa"></i> Home]]<br />
<br />
{{Template:RPM Page Footer with Copyright and Current Date}}</div>James Klassenhttp://rpm.rcabc.org/index.php?title=TPO_Membrane_Termination_CTPO Membrane Termination C2024-02-26T16:37:13Z<p>James Klassen: Created page with "{{Template:RPM Info}} {{DISPLAYTITLE:<span style="position: absolute; clip: rect(1px 1px 1px 1px); clip: rect(1px, 1px, 1px, 1px);">{{FULLPAGENAME}}</span>}} __NOTOC__ <bi..."</p>
<hr />
<div>{{Template:RPM Info}}<br />
<br />
<br />
<br />
{{DISPLAYTITLE:<span style="position: absolute; clip: rect(1px 1px 1px 1px); clip: rect(1px, 1px, 1px, 1px);">{{FULLPAGENAME}}</span>}}<br />
__NOTOC__<br />
<br />
<big><big>Division D - Construction Details</big></big><br />
<hr><br />
<big><big><big><big><big>TPO | Membrane Termination C (Wall) ([[TPO_Roof_Systems_Standard#10.3.2.3._General_Application_Requirements_for_Perimeters_and_Walls | Article 10.3.2.3.]])</big></big></big></big></big><br />
{{Template:Construction Details Header}}<br />
<div class="panel panel-success"><br />
<div class="panel-heading"><big>'''TPO Details'''</big></div><br />
<div class="panel-body"><br />
<div class="col-md-6"><br />
<div style="text-align:center; vertical-align:center"><br />
<br><br />
[[File:10.3.2.3.-TPO-C.png|class=img-responsive | link=https://rpm.rcabc.org/images/8/8f/10.3.2.3.-TPO-C.png]]<br />
:Drawing NTS<br />
</div><br />
</div><!-- COL-6-MD --><br />
<br />
<div class="col-md-6"><br />
=== WORK INCLUDED ===<br />
<br />
;(1) [[TPO Roof Systems Standard#PART_6|<big>Air/Vapour Control Layers</big>]]: <br />
:As specified by the ''Design Authority'' and installed to provide continuity for optimal control.<br />
;(2) [[TPO Roof Systems Standard#PART_7|<big>Insulation</big>]]:<br />
:Installed in keeping with Section 7.3. Multiple layering illustrated; layers must be offset and staggered at least 304.8 mm (12”) in each direction.<br />
;(3) [[TPO Roof Systems Standard#PART_8|<big>Insulation Overlay Panel</big>]]:<br />
:Required for fully adhered membrane systems or when overburden is specified. Panels must be offset and staggered from underlying insulation panels.<br />
;(4) [[TPO Roof Systems Standard#PART_9|<big>Field Membrane</big>]]:<br />
:See Table 9.2. for permissible application methods and corresponding membrane properties. Membrane must be installed according to the requirements in Section 9.3.<br />
;(5) [[TPO Roof Systems Standard#PART_10|<big>Edge Securement</big>]]:<br />
:Proprietary to the membrane manufacturer. Edge securement is required, irrespective of how the membrane is applied (i.e., adhered, self-adhered, mechanically fastened).<br />
;(6) [[TPO Roof Systems Standard#PART_10|<big>Mechanical Fastening</big>]]:<br />
:Edge securement must be anchored to the roof structure to prevent membrane movement.<br />
;(7) [[TPO Roof Systems Standard#PART_10|<big>Primer or Adhesive</big>]]:<br />
:Proprietary to the membrane manufacturer. Primer may be required for self-adhered membranes; adhesive is required for all other applications. All membranes applied to the vertical substrate must be fully adhered.<br />
;(8) [[TPO Roof Systems Standard#PART_10|<big>Membrane Flashing</big>]]:<br />
:May be run continuously up the vertical substrate from the field or installed as separate flashing (see membrane manufacturer requirements). Membrane shall be carried up the vertical substrate at least 203.2 mm (8”) above the ''finished roof system surface'', plus at least 76.2 mm (3”) for wall control layer overlap. In regions where heavy snow accumulation is possible, or to accommodate future roof membrane replacement, membrane should be carried at least 304.8 mm (12”) up the vertical substrate.<br />
;(9) [[TPO Roof Systems Standard#PART_10|<big>Membrane Edge Securement and Sealant</big>]]:<br />
:All membranes applied to a vertical surface must be mechanically fastened. 2-component fleece-reinforced PMMA/PUMA is illustrated, together with sealant applied to upper membrane edge (See [[PVC Roof Systems Standard#10.3.3.4. Liquid Membrane Flashing | Article 10.3.3.4.]] for application requirements); liquid membrane flashing must be compatible with the primary membrane and listed in [https://rpm.rcabc.org/index.php?title=Division_C Division C] of the RPM.<br />
<br />
=== RELATED WORK BY OTHERS ===<br />
;(A) [[TPO Roof Systems Standard#PART_2|<big>Acceptable Deck</big>]]<br />
:Illustrated deck is representative. See Sub-section 2.1.5. for acceptable ''deck'' types and conditions.<br />
;(B) [[TPO Roof Systems Standard#PART_2|<big>Wall Structure</big>]]<br />
:Illustrated wall is representative. Wall control layers (i.e. water resistive barrier) must overlap ''roofing system'' to achieve ''continuity''. See Sub-section 2.1.7. for wall conditions.<br />
<br />
</div><!-- COL-6-MD --><br />
</div><!-- PANEL BODY --><br />
</div><!-- PANEL --><br />
<br />
'''NOTE''': See the [[TPO Roof Systems Standard | '''TPO Roof Systems Standard''']] for additional requirements.<br />
<br />
<hr><br />
<br />
[[TPO Roof System Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''TPO Roof System Details'']]<br />
<br />
[[Main Page | <i class="fa fa-home fa"></i> Home]]<br />
<br />
{{Template:RPM Page Footer with Copyright and Current Date}}</div>James Klassenhttp://rpm.rcabc.org/index.php?title=TPO_Membrane_Termination_BTPO Membrane Termination B2024-02-26T16:36:34Z<p>James Klassen: Created page with "{{Template:RPM Info}} {{DISPLAYTITLE:<span style="position: absolute; clip: rect(1px 1px 1px 1px); clip: rect(1px, 1px, 1px, 1px);">{{FULLPAGENAME}}</span>}} __NOTOC__ <bi..."</p>
<hr />
<div>{{Template:RPM Info}}<br />
<br />
<br />
<br />
{{DISPLAYTITLE:<span style="position: absolute; clip: rect(1px 1px 1px 1px); clip: rect(1px, 1px, 1px, 1px);">{{FULLPAGENAME}}</span>}}<br />
__NOTOC__<br />
<br />
<big><big>Division D - Construction Details</big></big><br />
<hr><br />
<big><big><big><big><big>TPO | Membrane Termination B (Wall) ([[TPO_Roof_Systems_Standard#10.3.2.3._General_Application_Requirements_for_Perimeters_and_Walls | Article 10.3.2.3.]])</big></big></big></big></big><br />
{{Template:Construction Details Header}}<br />
<div class="panel panel-success"><br />
<div class="panel-heading"><big>'''TPO Details'''</big></div><br />
<div class="panel-body"><br />
<div class="col-md-6"><br />
<div style="text-align:center; vertical-align:center"><br />
<br><br />
[[File:10.3.2.3.-TPO-B.png|class=img-responsive | link=https://rpm.rcabc.org/images/b/b6/10.3.2.3.-TPO-B.png]]<br />
:Drawing NTS<br />
</div><br />
</div><!-- COL-6-MD --><br />
<br />
<div class="col-md-6"><br />
=== WORK INCLUDED ===<br />
<br />
;(1) [[TPO Roof Systems Standard#PART_6|<big>Air/Vapour Control Layers</big>]]: <br />
:As specified by the ''Design Authority'' and installed to provide continuity for optimal control.<br />
;(2) [[TPO Roof Systems Standard#PART_7|<big>Insulation</big>]]:<br />
:Installed in keeping with Section 7.3. Multiple layering illustrated; layers must be offset and staggered at least 304.8 mm (12”) in each direction.<br />
;(3) [[TPO Roof Systems Standard#PART_8|<big>Insulation Overlay Panel</big>]]:<br />
:Required for fully adhered membrane systems or when overburden is specified. Panels must be offset and staggered from underlying insulation panels.<br />
;(4) [[TPO Roof Systems Standard#PART_9|<big>Field Membrane</big>]]:<br />
:See Table 9.2. for permissible application methods and corresponding membrane properties. Membrane must be installed according to the requirements in Section 9.3.<br />
;(5) [[TPO Roof Systems Standard#PART_10|<big>Edge Securement</big>]]:<br />
:Proprietary to the membrane manufacturer. Edge securement is required, irrespective of how the membrane is applied (i.e., adhered, self-adhered, mechanically fastened).<br />
;(6) [[TPO Roof Systems Standard#PART_10|<big>Mechanical Fastening</big>]]:<br />
:Edge securement must be anchored to the roof structure to prevent membrane movement.<br />
;(7) [[TPO Roof Systems Standard#PART_10|<big>Primer or Adhesive</big>]]:<br />
:Proprietary to the membrane manufacturer. Primer may be required for self-adhered membranes; adhesive is required for all other applications. All membranes applied to the vertical substrate must be fully adhered.<br />
;(8) [[TPO Roof Systems Standard#PART_10|<big>Membrane Flashing</big>]]:<br />
:May be run continuously up the vertical substrate from the field or installed as separate flashing (see membrane manufacturer requirements). Membrane shall be carried up the vertical substrate at least 203.2 mm (8”) above the ''finished roof system surface'', plus at least 76.2 mm (3”) for wall control layer overlap. In regions where heavy snow accumulation is possible, or to accommodate future roof membrane replacement, membrane should be carried at least 304.8 mm (12”) up the vertical substrate.<br />
;(9) [[TPO Roof Systems Standard#PART_10|<big>Membrane Edge Securement and Sealant</big>]]:<br />
:All membranes applied to a vertical surface must be mechanically fastened. Fastener illustrated, together with sealant applied to upper membrane edge.<br />
<br />
=== RELATED WORK BY OTHERS ===<br />
;(A) [[TPO Roof Systems Standard#PART_2|<big>Acceptable Deck</big>]]<br />
:Illustrated deck is representative. See Sub-section 2.1.5. for acceptable ''deck'' types and conditions.<br />
;(B) [[TPO Roof Systems Standard#PART_2|<big>Wall Structure</big>]]<br />
:Illustrated wall is representative. Wall control layers (i.e. water resistive barrier) must overlap ''roofing system'' to achieve ''continuity''. See Sub-section 2.1.7. for wall conditions.<br />
;(C) <big>Wall System Finish</big><br />
:Illustrated system is representative and shows water-resistive barrier overlapping roof membrane (See above, Item 8).<br />
<br />
</div><!-- COL-6-MD --><br />
</div><!-- PANEL BODY --><br />
</div><!-- PANEL --><br />
<br />
'''NOTE''': See the [[TPO Roof Systems Standard | '''TPO Roof Systems Standard''']] for additional requirements.<br />
<br />
<hr><br />
<br />
[[TPO Roof System Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''TPO Roof System Details'']]<br />
<br />
[[Main Page | <i class="fa fa-home fa"></i> Home]]<br />
<br />
{{Template:RPM Page Footer with Copyright and Current Date}}</div>James Klassenhttp://rpm.rcabc.org/index.php?title=TPO_Membrane_Termination_ATPO Membrane Termination A2024-02-26T16:35:55Z<p>James Klassen: Created page with "{{Template:RPM Info}} {{DISPLAYTITLE:<span style="position: absolute; clip: rect(1px 1px 1px 1px); clip: rect(1px, 1px, 1px, 1px);">{{FULLPAGENAME}}</span>}} __NOTOC__ <bi..."</p>
<hr />
<div>{{Template:RPM Info}}<br />
<br />
<br />
<br />
{{DISPLAYTITLE:<span style="position: absolute; clip: rect(1px 1px 1px 1px); clip: rect(1px, 1px, 1px, 1px);">{{FULLPAGENAME}}</span>}}<br />
__NOTOC__<br />
<br />
<big><big>Division D - Construction Details</big></big><br />
<hr><br />
<big><big><big><big><big>TPO | Membrane Termination A (Wall) ([[TPO_Roof_Systems_Standard#10.3.2.3._General_Application_Requirements_for_Perimeters_and_Walls | Article 10.3.2.3.]])</big></big></big></big></big><br />
{{Template:Construction Details Header}}<br />
<div class="panel panel-success"><br />
<div class="panel-heading"><big>'''TPO Details'''</big></div><br />
<div class="panel-body"><br />
<div class="col-md-6"><br />
<div style="text-align:center; vertical-align:center"><br />
<br><br />
[[File:10.3.2.3.-TPO-A.png |class=img-responsive | link=https://rpm.rcabc.org/images/f/fb/10.3.2.3.-TPO-A.png]]<br />
:Drawing NTS<br />
</div><br />
</div><!-- COL-6-MD --><br />
<br />
<div class="col-md-6"><br />
=== WORK INCLUDED ===<br />
<br />
;(1) [[TPO Roof Systems Standard#PART_6|<big>Air/Vapour Control Layers</big>]]: <br />
:As specified by the ''Design Authority'' and installed to provide continuity for optimal control.<br />
;(2) [[TPO Roof Systems Standard#PART_7|<big>Insulation</big>]]:<br />
:Installed in keeping with Section 7.3. Multiple layering illustrated; layers must be offset and staggered at least 304.8 mm (12”) in each direction.<br />
;(3) [[TPO Roof Systems Standard#PART_8|<big>Insulation Overlay Panel</big>]]:<br />
:Required for fully adhered membrane systems or when overburden is specified. Panels must be offset and staggered from underlying insulation panels.<br />
;(4) [[TPO Roof Systems Standard#PART_9|<big>Field Membrane</big>]]:<br />
:See Table 9.2. for permissible application methods and corresponding membrane properties. Membrane must be installed according to the requirements in Section 9.3.<br />
;(5) [[TPO Roof Systems Standard#PART_10|<big>Edge Securement</big>]]:<br />
:Proprietary to the membrane manufacturer. Edge securement is required, irrespective of how the membrane is applied (i.e., adhered, self-adhered, mechanically fastened).<br />
;(6) [[TPO Roof Systems Standard#PART_10|<big>Mechanical Fastening</big>]]:<br />
:Edge securement must be anchored to the roof structure to prevent membrane movement.<br />
;(7) [[TPO Roof Systems Standard#PART_10|<big>Primer or Adhesive</big>]]:<br />
:Proprietary to the membrane manufacturer. Primer may be required for self-adhered membranes; adhesive is required for all other applications. All membranes applied to the vertical substrate must be fully adhered.<br />
;(8) [[TPO Roof Systems Standard#PART_10|<big>Membrane Flashing</big>]]:<br />
:May be run continuously up the vertical substrate from the field or installed as separate flashing (see membrane manufacturer requirements). Membrane shall be carried up the vertical substrate at least 203.2 mm (8”) above the ''finished roof system surface'', plus at least 76.2 mm (3”) for wall control layer overlap. In regions where heavy snow accumulation is possible, or to accommodate future roof membrane replacement, membrane should be carried at least 304.8 mm (12”) up the vertical substrate.<br />
;(9) [[TPO Roof Systems Standard#PART_10|<big>Rigid Support for Through-wall Flashing (optional)</big>]]:<br />
:Where the ''wall'' is insulated on the exterior side of the structure, ''continuity'' of air and vapour controls must be protected from future damage during roof replacement. This can be done by securing a suitable membrane receiver panel against the insulation. The panel must be permanently affixed to the structure through the insulation. During replacement of the roof membrane, membrane flashing may be removed from the receiver panel without disturbing the insulation and control layers. In this way, material waste is also reduced.<br />
<br />
:Where the membrane may not easily separate from its receiver during roof replacement, a second panel (not illustrated) can be screw-fastened to the first. During replacement, both the membrane and the secondary panel may be removed together, simplifying membrane replacement.<br />
;(10) [[TPO Roof Systems Standard#PART_10|<big>Membrane Flashing Substrate</big>]]:<br />
:''Continuity'' of the water-resistive barrier means it must pass through the insulation assembly installed on the exterior side of the wall structure. To do that, a membrane flashing passes through the insulation where the ''roof system'' terminates. Blocking or another suitable support (i.e., hat track) is necessary to support the membrane and its linear metal flashing carrier. Wood blocking illustrated.<br />
;(10) [[TPO Roof Systems Standard#PART_10|<big>Through-wall Flashing</big>]]:<br />
:A self-adhered membrane is used to transition from the ''wall'' to the ''roofing assembly'', providing a continuous drainage path for water. Secure the ''linear metal flashing'' to the support underneath (see Item 9 or 10 above). <br />
<br />
:Note that the water resistive barrier membrane from the ''wall'' (installed by others – see Related Work below) overlaps the through-wall flashing (installed by the ''Contractor'') and is supported by a metal flashing with drip edge, to direct water from the wall to the roof surface.<br />
<br />
=== RELATED WORK BY OTHERS ===<br />
;(A) [[TPO Roof Systems Standard#PART_2|<big>Acceptable Deck</big>]]<br />
:Illustrated deck is representative. See Sub-section 2.1.5. for acceptable ''deck'' types and conditions.<br />
;(B) [[TPO Roof Systems Standard#PART_2|<big>Wall Structure</big>]]<br />
:Illustrated wall is representative. Wall control layers (i.e., water resistive barrier) must overlap ''roofing system'' to achieve ''continuity''. See Sub-section 2.1.7. for wall conditions.<br />
;(C) <big>Wall System Finish</big><br />
:Illustrated system is representative and shows water-resistive barrier overlapping roof membrane (See above, Item 8).<br />
<br />
</div><!-- COL-6-MD --><br />
</div><!-- PANEL BODY --><br />
</div><!-- PANEL --><br />
<br />
'''NOTE''': See the [[TPO Roof Systems Standard | '''TPO Roof Systems Standard''']] for additional requirements.<br />
<br />
<hr><br />
<br />
[[TPO Roof System Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''TPO Roof System Details'']]<br />
<br />
[[Main Page | <i class="fa fa-home fa"></i> Home]]<br />
<br />
{{Template:RPM Page Footer with Copyright and Current Date}}</div>James Klassenhttp://rpm.rcabc.org/index.php?title=EPDM_Membrane_Termination_FEPDM Membrane Termination F2024-02-26T16:30:09Z<p>James Klassen: Created page with "{{Template:RPM Info}} {{DISPLAYTITLE:<span style="position: absolute; clip: rect(1px 1px 1px 1px); clip: rect(1px, 1px, 1px, 1px);">{{FULLPAGENAME}}</span>}} __NOTOC__ <big>..."</p>
<hr />
<div>{{Template:RPM Info}}<br />
<br />
{{DISPLAYTITLE:<span style="position: absolute; clip: rect(1px 1px 1px 1px); clip: rect(1px, 1px, 1px, 1px);">{{FULLPAGENAME}}</span>}}<br />
__NOTOC__<br />
<br />
<big><big>Division D - Construction Details</big></big><br />
<hr><br />
<big><big><big><big><big>EPDM | Membrane Termination F (Wall) ([[EPDM_Roof_Systems_Standard#10.3.2.3._General_Application_Requirements_for_Perimeters_and_Walls | Article 10.3.2.3.]])</big></big></big></big></big><br />
{{Template:Construction Details Header}}<br />
<div class="panel panel-success"><br />
<div class="panel-heading"><big>'''EPDM Details'''</big></div><br />
<div class="panel-body"><br />
<div class="col-md-6"><br />
<div style="text-align:center; vertical-align:center"><br />
<br><br />
[[File:10.3.2.3.-EPDM-F.png|class=img-responsive | link=https://rpm.rcabc.org/images/d/d3/10.3.2.3.-EPDM-F.png]]<br />
:Drawing NTS<br />
</div><br />
</div><!-- COL-6-MD --><br />
<br />
<div class="col-md-6"><br />
=== WORK INCLUDED ===<br />
<br />
;(1) [[EPDM Roof Systems Standard#PART_6|<big>Air/Vapour Control Layers</big>]]: <br />
:As specified by the ''Design Authority'' and installed to provide continuity for optimal control.<br />
;(2) [[EPDM Roof Systems Standard#PART_7|<big>Insulation</big>]]:<br />
:Installed in keeping with Section 7.3. Multiple layering illustrated; layers must be offset and staggered at least 304.8 mm (12”) in each direction.<br />
;(3) [[EPDM Roof Systems Standard#PART_8|<big>Insulation Overlay Panel</big>]]:<br />
:Required for fully adhered membrane systems or when overburden is specified. Panels must be offset and staggered from underlying insulation panels.<br />
;(4) [[EPDM Roof Systems Standard#PART_9|<big>Field Membrane</big>]]:<br />
:See Table 9.2. for permissible application methods and corresponding membrane properties. Membrane must be installed according to the requirements in Section 9.3.<br />
;(5) [[EPDM Roof Systems Standard#PART_10|<big>Edge Securement</big>]]:<br />
:Proprietary to the membrane manufacturer. Edge securement is required, irrespective of how the membrane is applied (i.e., adhered, self-adhered, mechanically fastened).<br />
;(6) [[EPDM Roof Systems Standard#PART_10|<big>Mechanical Fastening</big>]]:<br />
:Edge securement must be anchored to the roof structure to prevent membrane movement.<br />
;(7) [[EPDM Roof Systems Standard#PART_10|<big>Primer or Adhesive</big>]]:<br />
:Proprietary to the membrane manufacturer. Primer may be required for self-adhered membranes; adhesive is required for all other applications. All membranes applied to the vertical substrate must be fully adhered.<br />
;(8) [[EPDM Roof Systems Standard#PART_10|<big>Membrane Flashing</big>]]:<br />
:May be run continuously up the vertical substrate from the field or installed as separate flashing (see membrane manufacturer requirements). Membrane shall be carried up the vertical substrate at least 203.2 mm (8”) above the ''finished roof system surface'', plus at least 76.2 mm (3”) for wall control layer overlap. In regions where heavy snow accumulation is possible, or to accommodate future roof membrane replacement, membrane should be carried at least 304.8 mm (12”) up the vertical substrate.<br />
;(9) [[EPDM Roof Systems Standard#PART_10|<big>Primary Surface Reglet Counter-flashing and Sealant</big>]]:<br />
:Surface reglet counter-flashing with tooled sealant shown at top edge of flashing. In this illustration, the linear metal flashing serves to secure the membrane. All membranes applied to a vertical surface must be mechanically fastened.<br />
;(10) [[EPDM Roof Systems Standard#PART_10|<big>Secondary Surface Reglet Counter-flashing and Sealant</big>]]:<br />
:Surface reglet counter-flashing with bead of sealant applied in reglet cut. This flashing provides secondary protection for the primary surface reglet/counter-flashing and safe-guards the sealant from weather-induced deterioration and mechanical damage.<br />
<br />
=== RELATED WORK BY OTHERS ===<br />
;(A) [[EPDM Roof Systems Standard#PART_2|<big>Acceptable Deck</big>]]<br />
:Illustrated deck is representative. See Sub-section 2.1.5. for acceptable ''deck'' types and conditions.<br />
;(B) [[EPDM Roof Systems Standard#PART_2|<big>Wall Structure</big>]]<br />
:Illustrated wall is representative. Wall control layers (i.e. water resistive barrier) must overlap ''roofing system'' to achieve ''continuity''. See Sub-section 2.1.7. for wall conditions.<br />
<br />
</div><!-- COL-6-MD --><br />
</div><!-- PANEL BODY --><br />
</div><!-- PANEL --><br />
<br />
'''NOTE''': See the [[EPDM Roof Systems Standard | '''EPDM Roof Systems Standard''']] for additional requirements.<br />
<br />
<hr><br />
<br />
[[EPDM Roof System Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''EPDM Roof System Details'']]<br />
<br />
[[Main Page | <i class="fa fa-home fa"></i> Home]]<br />
<br />
{{Template:RPM Page Footer with Copyright and Current Date}}</div>James Klassenhttp://rpm.rcabc.org/index.php?title=EPDM_Membrane_Termination_EEPDM Membrane Termination E2024-02-26T16:29:37Z<p>James Klassen: Created page with "{{Template:RPM Info}} {{DISPLAYTITLE:<span style="position: absolute; clip: rect(1px 1px 1px 1px); clip: rect(1px, 1px, 1px, 1px);">{{FULLPAGENAME}}</span>}} __NOTOC__ <big>..."</p>
<hr />
<div>{{Template:RPM Info}}<br />
<br />
{{DISPLAYTITLE:<span style="position: absolute; clip: rect(1px 1px 1px 1px); clip: rect(1px, 1px, 1px, 1px);">{{FULLPAGENAME}}</span>}}<br />
__NOTOC__<br />
<br />
<big><big>Division D - Construction Details</big></big><br />
<hr><br />
<big><big><big><big><big>EPDM | Membrane Termination E (Wall) ([[EPDM_Roof_Systems_Standard#10.3.2.3._General_Application_Requirements_for_Perimeters_and_Walls | Article 10.3.2.3.]])</big></big></big></big></big><br />
{{Template:Construction Details Header}}<br />
<div class="panel panel-success"><br />
<div class="panel-heading"><big>'''EPDM Details'''</big></div><br />
<div class="panel-body"><br />
<div class="col-md-6"><br />
<div style="text-align:center; vertical-align:center"><br />
<br><br />
[[File:10.3.2.3.-EPDM-E.png |class=img-responsive | link=https://rpm.rcabc.org/images/a/ad/10.3.2.3.-EPDM-E.png]]<br />
:Drawing NTS<br />
</div><br />
</div><!-- COL-6-MD --><br />
<br />
<div class="col-md-6"><br />
=== WORK INCLUDED ===<br />
<br />
;(1) [[EPDM Roof Systems Standard#PART_6|<big>Air/Vapour Control Layers</big>]]: <br />
:As specified by the ''Design Authority'' and installed to provide continuity for optimal control.<br />
;(2) [[EPDM Roof Systems Standard#PART_7|<big>Insulation</big>]]:<br />
:Installed in keeping with Section 7.3. Multiple layering illustrated; layers must be offset and staggered at least 304.8 mm (12”) in each direction.<br />
;(3) [[EPDM Roof Systems Standard#PART_8|<big>Insulation Overlay Panel</big>]]:<br />
:Required for fully adhered membrane systems or when overburden is specified. Panels must be offset and staggered from underlying insulation panels.<br />
;(4) [[EPDM Roof Systems Standard#PART_9|<big>Field Membrane</big>]]:<br />
:See Table 9.2. for permissible application methods and corresponding membrane properties. Membrane must be installed according to the requirements in Section 9.3.<br />
;(5) [[EPDM Roof Systems Standard#PART_10|<big>Edge Securement</big>]]:<br />
:Proprietary to the membrane manufacturer. Edge securement is required, irrespective of how the membrane is applied (i.e., adhered, self-adhered, mechanically fastened).<br />
;(6) [[EPDM Roof Systems Standard#PART_10|<big>Mechanical Fastening</big>]]:<br />
:Edge securement must be anchored to the roof structure to prevent membrane movement.<br />
;(7) [[EPDM Roof Systems Standard#PART_10|<big>Primer or Adhesive</big>]]:<br />
:Proprietary to the membrane manufacturer. Primer may be required for self-adhered membranes; adhesive is required for all other applications. All membranes applied to the vertical substrate must be fully adhered.<br />
;(8) [[EPDM Roof Systems Standard#PART_10|<big>Membrane Flashing</big>]]:<br />
:May be run continuously up the vertical substrate from the field or installed as separate flashing (see membrane manufacturer requirements). Membrane shall be carried up the vertical substrate at least 203.2 mm (8”) above the ''finished roof system surface'', plus at least 76.2 mm (3”) for wall control layer overlap. In regions where heavy snow accumulation is possible, or to accommodate future roof membrane replacement, membrane should be carried at least 304.8 mm (12”) up the vertical substrate.<br />
;(9) [[EPDM Roof Systems Standard#PART_10|<big>Membrane Edge Securement and Sealant</big>]]:<br />
:All membranes applied to a vertical surface must be mechanically fastened. Mechanically fastened termination (“term”) bar with tooled sealant shown.<br />
;(10) [[EPDM Roof Systems Standard#PART_10|<big>Surface Reglet Counter-flashing and Sealant</big>]]:<br />
:Surface reglet counter-flashing with bead of sealant applied in reglet cut. This flashing provides secondary protection for the “term” bar and safe-guards the sealant from weather-induced deterioration and mechanical damage.<br />
<br />
=== RELATED WORK BY OTHERS ===<br />
;(A) [[EPDM Roof Systems Standard#PART_2|<big>Acceptable Deck</big>]]<br />
:Illustrated deck is representative. See Sub-section 2.1.5. for acceptable ''deck'' types and conditions.<br />
;(B) [[EPDM Roof Systems Standard#PART_2|<big>Wall Structure</big>]]<br />
:Illustrated wall is representative. Wall control layers (i.e. water resistive barrier) must overlap ''roofing system'' to achieve ''continuity''. See Sub-section 2.1.7. for wall conditions.<br />
<br />
</div><!-- COL-6-MD --><br />
</div><!-- PANEL BODY --><br />
</div><!-- PANEL --><br />
<br />
'''NOTE''': See the [[EPDM Roof Systems Standard | '''EPDM Roof Systems Standard''']] for additional requirements.<br />
<br />
<hr><br />
<br />
[[EPDM Roof System Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''EPDM Roof System Details'']]<br />
<br />
[[Main Page | <i class="fa fa-home fa"></i> Home]]<br />
<br />
{{Template:RPM Page Footer with Copyright and Current Date}}</div>James Klassenhttp://rpm.rcabc.org/index.php?title=EPDM_Membrane_Termination_DEPDM Membrane Termination D2024-02-26T16:28:23Z<p>James Klassen: Created page with "{{Template:RPM Info}} {{DISPLAYTITLE:<span style="position: absolute; clip: rect(1px 1px 1px 1px); clip: rect(1px, 1px, 1px, 1px);">{{FULLPAGENAME}}</span>}} __NOTOC__ <big>..."</p>
<hr />
<div>{{Template:RPM Info}}<br />
<br />
{{DISPLAYTITLE:<span style="position: absolute; clip: rect(1px 1px 1px 1px); clip: rect(1px, 1px, 1px, 1px);">{{FULLPAGENAME}}</span>}}<br />
__NOTOC__<br />
<br />
<big><big>Division D - Construction Details</big></big><br />
<hr><br />
<big><big><big><big><big>EPDM | Membrane Termination D (Wall) ([[EPDM_Roof_Systems_Standard#10.3.2.3._General_Application_Requirements_for_Perimeters_and_Walls | Article 10.3.2.3.]])</big></big></big></big></big><br />
{{Template:Construction Details Header}}<br />
<div class="panel panel-success"><br />
<div class="panel-heading"><big>'''EPDM Details'''</big></div><br />
<div class="panel-body"><br />
<div class="col-md-6"><br />
<div style="text-align:center; vertical-align:center"><br />
<br><br />
[[File:10.3.2.3.-EPDM-D.png |class=img-responsive | link=https://rpm.rcabc.org/images/7/74/10.3.2.3.-EPDM-D.png]]<br />
:Drawing NTS<br />
</div><br />
</div><!-- COL-6-MD --><br />
<br />
<div class="col-md-6"><br />
=== WORK INCLUDED ===<br />
<br />
;(1) [[EPDM Roof Systems Standard#PART_6|<big>Air/Vapour Control Layers</big>]]: <br />
:As specified by the ''Design Authority'' and installed to provide continuity for optimal control.<br />
;(2) [[EPDM Roof Systems Standard#PART_7|<big>Insulation</big>]]:<br />
:Installed in keeping with Section 7.3. Multiple layering illustrated; layers must be offset and staggered at least 304.8 mm (12”) in each direction.<br />
;(3) [[EPDM Roof Systems Standard#PART_8|<big>Insulation Overlay Panel</big>]]:<br />
:Required for fully adhered membrane systems or when overburden is specified. Panels must be offset and staggered from underlying insulation panels.<br />
;(4) [[EPDM Roof Systems Standard#PART_9|<big>Field Membrane</big>]]:<br />
:See Table 9.2. for permissible application methods and corresponding membrane properties. Membrane must be installed according to the requirements in Section 9.3.<br />
;(5) [[EPDM Roof Systems Standard#PART_10|<big>Edge Securement</big>]]:<br />
:Proprietary to the membrane manufacturer. Edge securement is required, irrespective of how the membrane is applied (i.e., adhered, self-adhered, mechanically fastened).<br />
;(6) [[EPDM Roof Systems Standard#PART_10|<big>Mechanical Fastening</big>]]:<br />
:Edge securement must be anchored to the roof structure to prevent membrane movement.<br />
;(7) [[EPDM Roof Systems Standard#PART_10|<big>Primer or Adhesive</big>]]:<br />
:Proprietary to the membrane manufacturer. Primer may be required for self-adhered membranes; adhesive is required for all other applications. All membranes applied to the vertical substrate must be fully adhered.<br />
;(8) [[EPDM Roof Systems Standard#PART_10|<big>Membrane Flashing</big>]]:<br />
:May be run continuously up the vertical substrate from the field or installed as separate flashing (see membrane manufacturer requirements). Membrane shall be carried up the vertical substrate at least 203.2 mm (8”) above the ''finished roof system surface'', plus at least 76.2 mm (3”) for wall control layer overlap. In regions where heavy snow accumulation is possible, or to accommodate future roof membrane replacement, membrane should be carried at least 304.8 mm (12”) up the vertical substrate.<br />
;(9) [[EPDM Roof Systems Standard#PART_10|<big>Membrane Edge Securement and Sealant</big>]]:<br />
:All membranes applied to a vertical surface must be mechanically fastened. Mechanically fastened termination (“term”) bar with tooled sealant shown.<br />
;(10) [[EPDM Roof Systems Standard#PART_10|<big>Cut Reglet Counter-flashing and Sealant</big>]]:<br />
:Cut reglet counter-flashing with bead of sealant applied in reglet cut. This flashing provides secondary protection for the “term” bar and safe-guards the sealant from weather-induced deterioration and mechanical damage.<br />
<br />
=== RELATED WORK BY OTHERS ===<br />
;(A) [[EPDM Roof Systems Standard#PART_2|<big>Acceptable Deck</big>]]<br />
:Illustrated deck is representative. See Sub-section 2.1.5. for acceptable ''deck'' types and conditions.<br />
;(B) [[EPDM Roof Systems Standard#PART_2|<big>Wall Structure</big>]]<br />
:Illustrated wall is representative. Wall control layers (i.e. water resistive barrier) must overlap ''roofing system'' to achieve ''continuity''. See Sub-section 2.1.7. for wall conditions.<br />
<br />
</div><!-- COL-6-MD --><br />
</div><!-- PANEL BODY --><br />
</div><!-- PANEL --><br />
<br />
'''NOTE''': See the [[EPDM Roof Systems Standard | '''EPDM Roof Systems Standard''']] for additional requirements.<br />
<br />
<hr><br />
<br />
[[EPDM Roof System Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''EPDM Roof System Details'']]<br />
<br />
[[Main Page | <i class="fa fa-home fa"></i> Home]]<br />
<br />
{{Template:RPM Page Footer with Copyright and Current Date}}</div>James Klassenhttp://rpm.rcabc.org/index.php?title=EPDM_Membrane_Termination_CEPDM Membrane Termination C2024-02-26T16:27:44Z<p>James Klassen: Created page with "{{Template:RPM Info}} {{DISPLAYTITLE:<span style="position: absolute; clip: rect(1px 1px 1px 1px); clip: rect(1px, 1px, 1px, 1px);">{{FULLPAGENAME}}</span>}} __NOTOC__ <big>..."</p>
<hr />
<div>{{Template:RPM Info}}<br />
<br />
{{DISPLAYTITLE:<span style="position: absolute; clip: rect(1px 1px 1px 1px); clip: rect(1px, 1px, 1px, 1px);">{{FULLPAGENAME}}</span>}}<br />
__NOTOC__<br />
<br />
<big><big>Division D - Construction Details</big></big><br />
<hr><br />
<big><big><big><big><big>EPDM | Membrane Termination C (Wall) ([[EPDM_Roof_Systems_Standard#10.3.2.3._General_Application_Requirements_for_Perimeters_and_Walls | Article 10.3.2.3.]])</big></big></big></big></big><br />
{{Template:Construction Details Header}}<br />
<div class="panel panel-success"><br />
<div class="panel-heading"><big>'''EPDM Details'''</big></div><br />
<div class="panel-body"><br />
<div class="col-md-6"><br />
<div style="text-align:center; vertical-align:center"><br />
<br><br />
[[File:10.3.2.3.-EPDM-C.png |class=img-responsive | link=https://rpm.rcabc.org/images/b/be/10.3.2.3.-EPDM-C.png]]<br />
:Drawing NTS<br />
</div><br />
</div><!-- COL-6-MD --><br />
<br />
<div class="col-md-6"><br />
=== WORK INCLUDED ===<br />
<br />
;(1) [[EPDM Roof Systems Standard#PART_6|<big>Air/Vapour Control Layers</big>]]: <br />
:As specified by the ''Design Authority'' and installed to provide continuity for optimal control.<br />
;(2) [[EPDM Roof Systems Standard#PART_7|<big>Insulation</big>]]:<br />
:Installed in keeping with Section 7.3. Multiple layering illustrated; layers must be offset and staggered at least 304.8 mm (12”) in each direction.<br />
;(3) [[EPDM Roof Systems Standard#PART_8|<big>Insulation Overlay Panel</big>]]:<br />
:Required for fully adhered membrane systems or when overburden is specified. Panels must be offset and staggered from underlying insulation panels.<br />
;(4) [[EPDM Roof Systems Standard#PART_9|<big>Field Membrane</big>]]:<br />
:See Table 9.2. for permissible application methods and corresponding membrane properties. Membrane must be installed according to the requirements in Section 9.3.<br />
;(5) [[EPDM Roof Systems Standard#PART_10|<big>Edge Securement</big>]]:<br />
:Proprietary to the membrane manufacturer. Edge securement is required, irrespective of how the membrane is applied (i.e., adhered, self-adhered, mechanically fastened).<br />
;(6) [[EPDM Roof Systems Standard#PART_10|<big>Mechanical Fastening</big>]]:<br />
:Edge securement must be anchored to the roof structure to prevent membrane movement.<br />
;(7) [[EPDM Roof Systems Standard#PART_10|<big>Primer or Adhesive</big>]]:<br />
:Proprietary to the membrane manufacturer. Primer may be required for self-adhered membranes; adhesive is required for all other applications. All membranes applied to the vertical substrate must be fully adhered.<br />
;(8) [[EPDM Roof Systems Standard#PART_10|<big>Membrane Flashing</big>]]:<br />
:May be run continuously up the vertical substrate from the field or installed as separate flashing (see membrane manufacturer requirements). Membrane shall be carried up the vertical substrate at least 203.2 mm (8”) above the ''finished roof system surface'', plus at least 76.2 mm (3”) for wall control layer overlap. In regions where heavy snow accumulation is possible, or to accommodate future roof membrane replacement, membrane should be carried at least 304.8 mm (12”) up the vertical substrate.<br />
;(9) [[EPDM Roof Systems Standard#PART_10|<big>Membrane Edge Securement and Sealant</big>]]:<br />
:All membranes applied to a vertical surface must be mechanically fastened. 2-component fleece-reinforced PMMA/PUMA is illustrated, together with sealant applied to upper membrane edge (See [[EPDM Roof Systems Standard#10.3.3.4. Liquid Membrane Flashing | Article 10.3.3.4.]] for application requirements); liquid membrane flashing must be compatible with the primary membrane and listed in [https://rpm.rcabc.org/index.php?title=Division_C Division C] of the RPM.<br />
<br />
=== RELATED WORK BY OTHERS ===<br />
;(A) [[EPDM Roof Systems Standard#PART_2|<big>Acceptable Deck</big>]]<br />
:Illustrated deck is representative. See Sub-section 2.1.5. for acceptable ''deck'' types and conditions.<br />
;(B) [[EPDM Roof Systems Standard#PART_2|<big>Wall Structure</big>]]<br />
:Illustrated wall is representative. Wall control layers (i.e. water resistive barrier) must overlap ''roofing system'' to achieve ''continuity''. See Sub-section 2.1.7. for wall conditions.<br />
<br />
</div><!-- COL-6-MD --><br />
</div><!-- PANEL BODY --><br />
</div><!-- PANEL --><br />
<br />
'''NOTE''': See the [[EPDM Roof Systems Standard | '''EPDM Roof Systems Standard''']] for additional requirements.<br />
<br />
<hr><br />
<br />
[[EPDM Roof System Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''EPDM Roof System Details'']]<br />
<br />
[[Main Page | <i class="fa fa-home fa"></i> Home]]<br />
<br />
{{Template:RPM Page Footer with Copyright and Current Date}}</div>James Klassenhttp://rpm.rcabc.org/index.php?title=EPDM_Membrane_Termination_BEPDM Membrane Termination B2024-02-26T16:27:04Z<p>James Klassen: Created page with "{{Template:RPM Info}} {{DISPLAYTITLE:<span style="position: absolute; clip: rect(1px 1px 1px 1px); clip: rect(1px, 1px, 1px, 1px);">{{FULLPAGENAME}}</span>}} __NOTOC__ <big>..."</p>
<hr />
<div>{{Template:RPM Info}}<br />
<br />
{{DISPLAYTITLE:<span style="position: absolute; clip: rect(1px 1px 1px 1px); clip: rect(1px, 1px, 1px, 1px);">{{FULLPAGENAME}}</span>}}<br />
__NOTOC__<br />
<br />
<big><big>Division D - Construction Details</big></big><br />
<hr><br />
<big><big><big><big><big>EPDM | Membrane Termination B (Wall) ([[EPDM_Roof_Systems_Standard#10.3.2.3._General_Application_Requirements_for_Perimeters_and_Walls | Article 10.3.2.3.]])</big></big></big></big></big><br />
{{Template:Construction Details Header}}<br />
<div class="panel panel-success"><br />
<div class="panel-heading"><big>'''EPDM Details'''</big></div><br />
<div class="panel-body"><br />
<div class="col-md-6"><br />
<div style="text-align:center; vertical-align:center"><br />
<br><br />
[[File:10.3.2.3.-EPDM-B.png|class=img-responsive | link=https://rpm.rcabc.org/images/c/c6/10.3.2.3.-EPDM-B.png]]<br />
:Drawing NTS<br />
</div><br />
</div><!-- COL-6-MD --><br />
<br />
<div class="col-md-6"><br />
=== WORK INCLUDED ===<br />
<br />
;(1) [[EPDM Roof Systems Standard#PART_6|<big>Air/Vapour Control Layers</big>]]: <br />
:As specified by the ''Design Authority'' and installed to provide continuity for optimal control.<br />
;(2) [[EPDM Roof Systems Standard#PART_7|<big>Insulation</big>]]:<br />
:Installed in keeping with Section 7.3. Multiple layering illustrated; layers must be offset and staggered at least 304.8 mm (12”) in each direction.<br />
;(3) [[EPDM Roof Systems Standard#PART_8|<big>Insulation Overlay Panel</big>]]:<br />
:Required for fully adhered membrane systems or when overburden is specified. Panels must be offset and staggered from underlying insulation panels.<br />
;(4) [[EPDM Roof Systems Standard#PART_9|<big>Field Membrane</big>]]:<br />
:See Table 9.2. for permissible application methods and corresponding membrane properties. Membrane must be installed according to the requirements in Section 9.3.<br />
;(5) [[EPDM Roof Systems Standard#PART_10|<big>Edge Securement</big>]]:<br />
:Proprietary to the membrane manufacturer. Edge securement is required, irrespective of how the membrane is applied (i.e., adhered, self-adhered, mechanically fastened).<br />
;(6) [[EPDM Roof Systems Standard#PART_10|<big>Mechanical Fastening</big>]]:<br />
:Edge securement must be anchored to the roof structure to prevent membrane movement.<br />
;(7) [[EPDM Roof Systems Standard#PART_10|<big>Primer or Adhesive</big>]]:<br />
:Proprietary to the membrane manufacturer. Primer may be required for self-adhered membranes; adhesive is required for all other applications. All membranes applied to the vertical substrate must be fully adhered.<br />
;(8) [[EPDM Roof Systems Standard#PART_10|<big>Membrane Flashing</big>]]:<br />
:May be run continuously up the vertical substrate from the field or installed as separate flashing (see membrane manufacturer requirements). Membrane shall be carried up the vertical substrate at least 203.2 mm (8”) above the ''finished roof system surface'', plus at least 76.2 mm (3”) for wall control layer overlap. In regions where heavy snow accumulation is possible, or to accommodate future roof membrane replacement, membrane should be carried at least 304.8 mm (12”) up the vertical substrate.<br />
;(9) [[EPDM Roof Systems Standard#PART_10|<big>Membrane Edge Securement and Sealant</big>]]:<br />
:All membranes applied to a vertical surface must be mechanically fastened. Fastener illustrated, together with sealant applied to upper membrane edge.<br />
<br />
=== RELATED WORK BY OTHERS ===<br />
;(A) [[EPDM Roof Systems Standard#PART_2|<big>Acceptable Deck</big>]]<br />
:Illustrated deck is representative. See Sub-section 2.1.5. for acceptable ''deck'' types and conditions.<br />
;(B) [[EPDM Roof Systems Standard#PART_2|<big>Wall Structure</big>]]<br />
:Illustrated wall is representative. Wall control layers (i.e. water resistive barrier) must overlap ''roofing system'' to achieve ''continuity''. See Sub-section 2.1.7. for wall conditions.<br />
;(C) <big>Wall System Finish</big><br />
:Illustrated system is representative and shows water-resistive barrier overlapping roof membrane (See above, Item 8).<br />
<br />
</div><!-- COL-6-MD --><br />
</div><!-- PANEL BODY --><br />
</div><!-- PANEL --><br />
<br />
'''NOTE''': See the [[EPDM Roof Systems Standard | '''EPDM Roof Systems Standard''']] for additional requirements.<br />
<br />
<hr><br />
<br />
[[EPDM Roof System Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''EPDM Roof System Details'']]<br />
<br />
[[Main Page | <i class="fa fa-home fa"></i> Home]]<br />
<br />
{{Template:RPM Page Footer with Copyright and Current Date}}</div>James Klassenhttp://rpm.rcabc.org/index.php?title=EPDM_Membrane_Termination_AEPDM Membrane Termination A2024-02-26T16:26:29Z<p>James Klassen: Created page with "{{Template:RPM Info}} {{DISPLAYTITLE:<span style="position: absolute; clip: rect(1px 1px 1px 1px); clip: rect(1px, 1px, 1px, 1px);">{{FULLPAGENAME}}</span>}} __NOTOC__ <big>..."</p>
<hr />
<div>{{Template:RPM Info}}<br />
<br />
{{DISPLAYTITLE:<span style="position: absolute; clip: rect(1px 1px 1px 1px); clip: rect(1px, 1px, 1px, 1px);">{{FULLPAGENAME}}</span>}}<br />
__NOTOC__<br />
<br />
<big><big>Division D - Construction Details</big></big><br />
<hr><br />
<big><big><big><big><big>EPDM | Membrane Termination A (Wall) ([[EPDM_Roof_Systems_Standard#10.3.2.3._General_Application_Requirements_for_Perimeters_and_Walls | Article 10.3.2.3.]])</big></big></big></big></big><br />
{{Template:Construction Details Header}}<br />
<div class="panel panel-success"><br />
<div class="panel-heading"><big>'''EPDM Details'''</big></div><br />
<div class="panel-body"><br />
<div class="col-md-6"><br />
<div style="text-align:center; vertical-align:center"><br />
<br><br />
[[File:10.3.2.3.-EPDM-A.png |class=img-responsive | link=https://rpm.rcabc.org/images/5/53/10.3.2.3.-EPDM-A.png]]<br />
:Drawing NTS<br />
</div><br />
</div><!-- COL-6-MD --><br />
<br />
<div class="col-md-6"><br />
=== WORK INCLUDED ===<br />
<br />
;(1) [[EPDM Roof Systems Standard#PART_6|<big>Air/Vapour Control Layers</big>]]: <br />
:As specified by the ''Design Authority'' and installed to provide continuity for optimal control.<br />
;(2) [[EPDM Roof Systems Standard#PART_7|<big>Insulation</big>]]:<br />
:Installed in keeping with Section 7.3. Multiple layering illustrated; layers must be offset and staggered at least 304.8 mm (12”) in each direction.<br />
;(3) [[EPDM Roof Systems Standard#PART_8|<big>Insulation Overlay Panel</big>]]:<br />
:Required for fully adhered membrane systems or when overburden is specified. Panels must be offset and staggered from underlying insulation panels.<br />
;(4) [[EPDM Roof Systems Standard#PART_9|<big>Field Membrane</big>]]:<br />
:See Table 9.2. for permissible application methods and corresponding membrane properties. Membrane must be installed according to the requirements in Section 9.3.<br />
;(5) [[EPDM Roof Systems Standard#PART_10|<big>Edge Securement</big>]]:<br />
:Proprietary to the membrane manufacturer. Edge securement is required, irrespective of how the membrane is applied (i.e., adhered, self-adhered, mechanically fastened).<br />
;(6) [[EPDM Roof Systems Standard#PART_10|<big>Mechanical Fastening</big>]]:<br />
:Edge securement must be anchored to the roof structure to prevent membrane movement.<br />
;(7) [[EPDM Roof Systems Standard#PART_10|<big>Primer or Adhesive</big>]]:<br />
:Proprietary to the membrane manufacturer. Primer may be required for self-adhered membranes; adhesive is required for all other applications. All membranes applied to the vertical substrate must be fully adhered.<br />
;(8) [[EPDM Roof Systems Standard#PART_10|<big>Membrane Flashing</big>]]:<br />
:May be run continuously up the vertical substrate from the field or installed as separate flashing (see membrane manufacturer requirements). Membrane shall be carried up the vertical substrate at least 203.2 mm (8”) above the ''finished roof system surface'', plus at least 76.2 mm (3”) for wall control layer overlap. In regions where heavy snow accumulation is possible, or to accommodate future roof membrane replacement, membrane should be carried at least 304.8 mm (12”) up the vertical substrate.<br />
;(9) [[EPDM Roof Systems Standard#PART_10|<big>Rigid Support for Through-wall Flashing (optional)</big>]]:<br />
:Where the ''wall'' is insulated on the exterior side of the structure, ''continuity'' of air and vapour controls must be protected from future damage during roof replacement. This can be done by securing a suitable membrane receiver panel against the insulation. The panel must be permanently affixed to the structure through the insulation. During replacement of the roof membrane, membrane flashing may be removed from the receiver panel without disturbing the insulation and control layers. In this way, material waste is also reduced.<br />
<br />
:Where the membrane may not easily separate from its receiver during roof replacement, a second panel (not illustrated) can be screw-fastened to the first. During replacement, both the membrane and the secondary panel may be removed together, simplifying membrane replacement.<br />
;(10) [[EPDM Roof Systems Standard#PART_10|<big>Membrane Flashing Substrate</big>]]:<br />
:''Continuity'' of the water-resistive barrier means it must pass through the insulation assembly installed on the exterior side of the wall structure. To do that, a membrane flashing passes through the insulation where the ''roof system'' terminates. Blocking or another suitable support (i.e., hat track) is necessary to support the membrane and its linear metal flashing carrier. Wood blocking illustrated.<br />
;(10) [[EPDM Roof Systems Standard#PART_10|<big>Through-wall Flashing</big>]]:<br />
:A self-adhered membrane is used to transition from the ''wall'' to the ''roofing assembly'', providing a continuous drainage path for water. Secure the ''linear metal flashing'' to the support underneath (see Item 9 or 10 above). <br />
<br />
:Note that the water resistive barrier membrane from the ''wall'' (installed by others – see Related Work below) overlaps the through-wall flashing (installed by the ''Contractor'') and is supported by a metal flashing with drip edge, to direct water from the wall to the roof surface.<br />
<br />
=== RELATED WORK BY OTHERS ===<br />
;(A) [[EPDM Roof Systems Standard#PART_2|<big>Acceptable Deck</big>]]<br />
:Illustrated deck is representative. See Sub-section 2.1.5. for acceptable ''deck'' types and conditions.<br />
;(B) [[EPDM Roof Systems Standard#PART_2|<big>Wall Structure</big>]]<br />
:Illustrated wall is representative. Wall control layers (i.e., water resistive barrier) must overlap ''roofing system'' to achieve ''continuity''. See Sub-section 2.1.7. for wall conditions.<br />
;(C) <big>Wall System Finish</big><br />
:Illustrated system is representative and shows water-resistive barrier overlapping roof membrane (See above, Item 8).<br />
<br />
</div><!-- COL-6-MD --><br />
</div><!-- PANEL BODY --><br />
</div><!-- PANEL --><br />
<br />
'''NOTE''': See the [[EPDM Roof Systems Standard | '''EPDM Roof Systems Standard''']] for additional requirements.<br />
<br />
<hr><br />
<br />
[[EPDM Roof System Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''EPDM Roof System Details'']]<br />
<br />
[[Main Page | <i class="fa fa-home fa"></i> Home]]<br />
<br />
{{Template:RPM Page Footer with Copyright and Current Date}}</div>James Klassenhttp://rpm.rcabc.org/index.php?title=SBS_Membrane_Termination_FSBS Membrane Termination F2024-02-26T16:00:43Z<p>James Klassen: Created page with "{{Template:RPM Info}} {{DISPLAYTITLE:<span style="position: absolute; clip: rect(1px 1px 1px 1px); clip: rect(1px, 1px, 1px, 1px);">{{FULLPAGENAME}}</span>}} __NOTOC__ <big..."</p>
<hr />
<div>{{Template:RPM Info}}<br />
<br />
<br />
{{DISPLAYTITLE:<span style="position: absolute; clip: rect(1px 1px 1px 1px); clip: rect(1px, 1px, 1px, 1px);">{{FULLPAGENAME}}</span>}}<br />
__NOTOC__<br />
<br />
<big><big>Division D - Construction Details</big></big><br />
<hr><br />
<big><big><big><big><big>SBS | Membrane Termination F (Wall) ([[SBS_Roof_Systems_Standard#10.3.2.3._General_Application_Requirements_for_Perimeters_and_Walls | Article 10.3.2.3.]])</big></big></big></big></big><br />
{{Template:Construction Details Header}}<br />
<div class="panel panel-success"><br />
<div class="panel-heading"><big>'''SBS Details'''</big></div><br />
<div class="panel-body"><br />
<div class="col-md-6"><br />
<div style="text-align:center; vertical-align:center"><br />
<br><br />
[[File:10.3.2.3.-SBS-F.png|class=img-responsive | link=https://rpm.rcabc.org/images/8/8d/10.3.2.3.-SBS-F.png]]<br />
:Drawing NTS<br />
</div><br />
</div><!-- COL-6-MD --><br />
<br />
<div class="col-md-6"><br />
=== WORK INCLUDED ===<br />
<br />
<br />
;(1) [[SBS Roof Systems Standard#PART_6|<big>Air/Vapour Control Layers</big>]]: <br />
:As specified by the ''Design Authority'' and installed to provide continuity for optimal control.<br />
;(2) [[SBS Roof Systems Standard#PART_7|<big>Insulation</big>]]:<br />
:Installed in keeping with Section 7.3. Multiple layering illustrated; layers must be offset and staggered at least 304.8 mm (12”) in each direction.<br />
;(3) [[SBS Roof Systems Standard#PART_8|<big>Insulation Overlay Panel</big>]]:<br />
:Required for fully adhered membrane systems or when overburden is specified. Panels must be offset and staggered from underlying insulation panels.<br />
;(4) [[SBS Roof Systems Standard#PART_9|<big>Base Sheet Field Membrane</big>]]:<br />
:See Table 9.2. for permissible application methods and corresponding membrane properties. Membrane must be installed according to the requirements in Section 9.3.<br />
;(5) [[SBS Roof Systems Standard#PART_10|<big>Base Sheet Flashing Membrane</big>]]:<br />
:Install in keeping with the requirements in Section 10.3. Base sheet membrane flashing must extend onto the roof field at least 101.6 mm (4"). Membrane shall be carried up the vertical substrate at least 203.2 mm (8”) above the ''finished roof system surface'', plus at least 76.2 mm (3”) for wall control layer overlap. In regions where heavy snow accumulation is possible, or to accommodate future roof membrane replacement, membrane should be carried at least 304.8 mm (12”) up the vertical substrate.<br />
;(6) [[SBS Roof Systems Standard#PART_10|<big>Cap Sheet Field Membrane</big>]]:<br />
:See Table 9.2. for permissible application methods and corresponding membrane properties. Membrane must be installed according to the requirements in Section 9.3.<br />
;(7) [[SBS Roof Systems Standard#PART_10|<big>Cap Sheet Flashing Membrane</big>]]:<br />
:Install in keeping with the requirements in Section 10.3. Cap sheet membrane flashing must extend onto the field at least 152.4 mm (6"), or at least 50.8 mm (2”) past the edge of the base membrane flashing.<br />
;(8) [[SBS Roof Systems Standard#PART_10|<big>Primary Surface Reglet Counter-flashing and Sealant</big>]]:<br />
:Surface reglet counter-flashing with tooled sealant shown at top edge of flashing. In this illustration, the linear metal flashing serves to secure the membrane. All membranes applied to a vertical surface must be mechanically fastened.<br />
;(9) [[SBS Roof Systems Standard#PART_10|<big>Secondary Surface Reglet Counter-flashing and Sealant</big>]]:<br />
:Surface reglet counter-flashing with bead of sealant applied in reglet cut. This flashing provides secondary protection for the primary surface reglet/counter-flashing and safe-guards the sealant from weather-induced deterioration and mechanical damage.<br />
<br />
=== RELATED WORK BY OTHERS ===<br />
;(A) [[SBS Roof Systems Standard#PART_2|<big>Acceptable Deck</big>]]<br />
:Illustrated deck is representative. See Sub-section 2.1.5. for acceptable ''deck'' types and conditions.<br />
;(B) [[SBS Roof Systems Standard#PART_2|<big>Wall Structure</big>]]<br />
:Illustrated wall is representative. Wall control layers (i.e. water resistive barrier) must overlap ''roofing system'' to achieve ''continuity''. See Sub-section 2.1.7. for wall conditions.<br />
<br />
</div><!-- COL-6-MD --><br />
</div><!-- PANEL BODY --><br />
</div><!-- PANEL --><br />
<br />
'''NOTE''': See the [[SBS Roof Systems Standard | '''SBS Roof Systems Standard''']] for additional requirements.<br />
<br />
<hr><br />
<br />
[[SBS Roof System Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''SBS Roof System Details'']]<br />
<br />
[[Main Page | <i class="fa fa-home fa"></i> Home]]<br />
<br />
{{Template:RPM Page Footer with Copyright and Current Date}}</div>James Klassenhttp://rpm.rcabc.org/index.php?title=SBS_Membrane_Termination_ESBS Membrane Termination E2024-02-26T15:59:22Z<p>James Klassen: Created page with "{{Template:RPM Info}} {{DISPLAYTITLE:<span style="position: absolute; clip: rect(1px 1px 1px 1px); clip: rect(1px, 1px, 1px, 1px);">{{FULLPAGENAME}}</span>}} __NOTOC__ <big..."</p>
<hr />
<div>{{Template:RPM Info}}<br />
<br />
<br />
{{DISPLAYTITLE:<span style="position: absolute; clip: rect(1px 1px 1px 1px); clip: rect(1px, 1px, 1px, 1px);">{{FULLPAGENAME}}</span>}}<br />
__NOTOC__<br />
<br />
<big><big>Division D - Construction Details</big></big><br />
<hr><br />
<big><big><big><big><big>SBS | Membrane Termination E (Wall) ([[SBS_Roof_Systems_Standard#10.3.2.3._General_Application_Requirements_for_Perimeters_and_Walls | Article 10.3.2.3.]])</big></big></big></big></big><br />
{{Template:Construction Details Header}}<br />
<div class="panel panel-success"><br />
<div class="panel-heading"><big>'''SBS Details'''</big></div><br />
<div class="panel-body"><br />
<div class="col-md-6"><br />
<div style="text-align:center; vertical-align:center"><br />
<br><br />
[[File:10.3.2.3.-SBS-E.png|class=img-responsive | link=https://rpm.rcabc.org/images/a/ae/10.3.2.3.-SBS-E.png]]<br />
:Drawing NTS<br />
</div><br />
</div><!-- COL-6-MD --><br />
<br />
<div class="col-md-6"><br />
=== WORK INCLUDED ===<br />
<br />
<br />
;(1) [[SBS Roof Systems Standard#PART_6|<big>Air/Vapour Control Layers</big>]]: <br />
:As specified by the ''Design Authority'' and installed to provide continuity for optimal control.<br />
;(2) [[SBS Roof Systems Standard#PART_7|<big>Insulation</big>]]:<br />
:Installed in keeping with Section 7.3. Multiple layering illustrated; layers must be offset and staggered at least 304.8 mm (12”) in each direction.<br />
;(3) [[SBS Roof Systems Standard#PART_8|<big>Insulation Overlay Panel</big>]]:<br />
:Required for fully adhered membrane systems or when overburden is specified. Panels must be offset and staggered from underlying insulation panels.<br />
;(4) [[SBS Roof Systems Standard#PART_9|<big>Base Sheet Field Membrane</big>]]:<br />
:See Table 9.2. for permissible application methods and corresponding membrane properties. Membrane must be installed according to the requirements in Section 9.3.<br />
;(5) [[SBS Roof Systems Standard#PART_10|<big>Base Sheet Flashing Membrane</big>]]:<br />
:Install in keeping with the requirements in Section 10.3. Base sheet membrane flashing must extend onto the roof field at least 101.6 mm (4"). Membrane shall be carried up the vertical substrate at least 203.2 mm (8”) above the ''finished roof system surface'', plus at least 76.2 mm (3”) for wall control layer overlap. In regions where heavy snow accumulation is possible, or to accommodate future roof membrane replacement, membrane should be carried at least 304.8 mm (12”) up the vertical substrate.<br />
;(6) [[SBS Roof Systems Standard#PART_10|<big>Cap Sheet Field Membrane</big>]]:<br />
:See Table 9.2. for permissible application methods and corresponding membrane properties. Membrane must be installed according to the requirements in Section 9.3.<br />
;(7) [[SBS Roof Systems Standard#PART_10|<big>Cap Sheet Flashing Membrane</big>]]:<br />
:Install in keeping with the requirements in Section 10.3. Cap sheet membrane flashing must extend onto the field at least 152.4 mm (6"), or at least 50.8 mm (2”) past the edge of the base membrane flashing.<br />
;(8) [[SBS Roof Systems Standard#PART_10|<big>Membrane Edge Securement and Sealant</big>]]:<br />
:All membranes applied to a vertical surface must be mechanically fastened. Mechanically fastened termination (“term”) bar with tooled sealant shown.<br />
;(9) [[SBS Roof Systems Standard#PART_10|<big>Surface Reglet Counter-flashing and Sealant</big>]]:<br />
:Surface reglet counter-flashing with bead of sealant applied in reglet cut. This flashing provides secondary protection for the “term” bar and safe-guards the sealant from weather-induced deterioration and mechanical damage.<br />
<br />
=== RELATED WORK BY OTHERS ===<br />
;(A) [[SBS Roof Systems Standard#PART_2|<big>Acceptable Deck</big>]]<br />
:Illustrated deck is representative. See Sub-section 2.1.5. for acceptable ''deck'' types and conditions.<br />
;(B) [[SBS Roof Systems Standard#PART_2|<big>Wall Structure</big>]]<br />
:Illustrated wall is representative. Wall control layers (i.e. water resistive barrier) must overlap ''roofing system'' to achieve ''continuity''. See Sub-section 2.1.7. for wall conditions.<br />
<br />
</div><!-- COL-6-MD --><br />
</div><!-- PANEL BODY --><br />
</div><!-- PANEL --><br />
<br />
'''NOTE''': See the [[SBS Roof Systems Standard | '''SBS Roof Systems Standard''']] for additional requirements.<br />
<br />
<hr><br />
<br />
[[SBS Roof System Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''SBS Roof System Details'']]<br />
<br />
[[Main Page | <i class="fa fa-home fa"></i> Home]]<br />
<br />
{{Template:RPM Page Footer with Copyright and Current Date}}</div>James Klassenhttp://rpm.rcabc.org/index.php?title=SBS_Membrane_Termination_DSBS Membrane Termination D2024-02-26T15:58:25Z<p>James Klassen: Created page with "{{Template:RPM Info}} {{DISPLAYTITLE:<span style="position: absolute; clip: rect(1px 1px 1px 1px); clip: rect(1px, 1px, 1px, 1px);">{{FULLPAGENAME}}</span>}} __NOTOC__ <big>..."</p>
<hr />
<div>{{Template:RPM Info}}<br />
<br />
{{DISPLAYTITLE:<span style="position: absolute; clip: rect(1px 1px 1px 1px); clip: rect(1px, 1px, 1px, 1px);">{{FULLPAGENAME}}</span>}}<br />
__NOTOC__<br />
<br />
<big><big>Division D - Construction Details</big></big><br />
<hr><br />
<big><big><big><big><big>SBS | Membrane Termination D (Wall) ([[SBS_Roof_Systems_Standard#10.3.2.3._General_Application_Requirements_for_Perimeters_and_Walls | Article 10.3.2.3.]])</big></big></big></big></big><br />
{{Template:Construction Details Header}}<br />
<div class="panel panel-success"><br />
<div class="panel-heading"><big>'''SBS Details'''</big></div><br />
<div class="panel-body"><br />
<div class="col-md-6"><br />
<div style="text-align:center; vertical-align:center"><br />
<br><br />
[[File:10.3.2.3.-SBS-D.png |class=img-responsive | link=https://rpm.rcabc.org/images/9/92/10.3.2.3.-SBS-D.png]]<br />
:Drawing NTS<br />
</div><br />
</div><!-- COL-6-MD --><br />
<br />
<div class="col-md-6"><br />
=== WORK INCLUDED ===<br />
<br />
;(1) [[SBS Roof Systems Standard#PART_6|<big>Air/Vapour Control Layers</big>]]: <br />
:As specified by the ''Design Authority'' and installed to provide continuity for optimal control.<br />
;(2) [[SBS Roof Systems Standard#PART_7|<big>Insulation</big>]]:<br />
:Installed in keeping with Section 7.3. Multiple layering illustrated; layers must be offset and staggered at least 304.8 mm (12”) in each direction.<br />
;(3) [[SBS Roof Systems Standard#PART_8|<big>Insulation Overlay Panel</big>]]:<br />
:Required for fully adhered membrane systems or when overburden is specified. Panels must be offset and staggered from underlying insulation panels.<br />
;(4) [[SBS Roof Systems Standard#PART_9|<big>Base Sheet Field Membrane</big>]]:<br />
:See Table 9.2. for permissible application methods and corresponding membrane properties. Membrane must be installed according to the requirements in Section 9.3.<br />
;(5) [[SBS Roof Systems Standard#PART_10|<big>Base Sheet Flashing Membrane</big>]]:<br />
:Install in keeping with the requirements in Section 10.3. Base sheet membrane flashing must extend onto the roof field at least 101.6 mm (4"). Membrane shall be carried up the vertical substrate at least 203.2 mm (8”) above the ''finished roof system surface'', plus at least 76.2 mm (3”) for wall control layer overlap. In regions where heavy snow accumulation is possible, or to accommodate future roof membrane replacement, membrane should be carried at least 304.8 mm (12”) up the vertical substrate.<br />
;(6) [[SBS Roof Systems Standard#PART_10|<big>Cap Sheet Field Membrane</big>]]:<br />
:See Table 9.2. for permissible application methods and corresponding membrane properties. Membrane must be installed according to the requirements in Section 9.3.<br />
;(7) [[SBS Roof Systems Standard#PART_10|<big>Cap Sheet Flashing Membrane</big>]]:<br />
:Install in keeping with the requirements in Section 10.3. Cap sheet membrane flashing must extend onto the field at least 152.4 mm (6"), or at least 50.8 mm (2”) past the edge of the base membrane flashing.<br />
;(8) [[SBS Roof Systems Standard#PART_10|<big>Membrane Edge Securement and Sealant</big>]]:<br />
:All membranes applied to a vertical surface must be mechanically fastened. Mechanically fastened termination (“term”) bar with tooled sealant shown.<br />
;(9) [[SBS Roof Systems Standard#PART_10|<big>Cut Reglet Counter-flashing and Sealant</big>]]:<br />
:Cut reglet counter-flashing with bead of sealant applied in reglet cut. This flashing provides secondary protection for the “term” bar and safe-guards the sealant from weather-induced deterioration and mechanical damage.<br />
<br />
=== RELATED WORK BY OTHERS ===<br />
;(A) [[SBS Roof Systems Standard#PART_2|<big>Acceptable Deck</big>]]<br />
:Illustrated deck is representative. See Sub-section 2.1.5. for acceptable ''deck'' types and conditions.<br />
;(B) [[SBS Roof Systems Standard#PART_2|<big>Wall Structure</big>]]<br />
:Illustrated wall is representative. Wall control layers (i.e. water resistive barrier) must overlap ''roofing system'' to achieve ''continuity''. See Sub-section 2.1.7. for wall conditions.<br />
<br />
</div><!-- COL-6-MD --><br />
</div><!-- PANEL BODY --><br />
</div><!-- PANEL --><br />
<br />
'''NOTE''': See the [[SBS Roof Systems Standard | '''SBS Roof Systems Standard''']] for additional requirements.<br />
<br />
<hr><br />
<br />
[[SBS Roof System Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''SBS Roof System Details'']]<br />
<br />
[[Main Page | <i class="fa fa-home fa"></i> Home]]<br />
<br />
{{Template:RPM Page Footer with Copyright and Current Date}}</div>James Klassenhttp://rpm.rcabc.org/index.php?title=SBS_Membrane_Termination_CSBS Membrane Termination C2024-02-26T15:57:16Z<p>James Klassen: Created page with "{{Template:RPM Info}} {{DISPLAYTITLE:<span style="position: absolute; clip: rect(1px 1px 1px 1px); clip: rect(1px, 1px, 1px, 1px);">{{FULLPAGENAME}}</span>}} __NOTOC__ <big>..."</p>
<hr />
<div>{{Template:RPM Info}}<br />
<br />
{{DISPLAYTITLE:<span style="position: absolute; clip: rect(1px 1px 1px 1px); clip: rect(1px, 1px, 1px, 1px);">{{FULLPAGENAME}}</span>}}<br />
__NOTOC__<br />
<br />
<big><big>Division D - Construction Details</big></big><br />
<hr><br />
<big><big><big><big><big>SBS | Membrane Termination C (Wall) ([[SBS_Roof_Systems_Standard#10.3.2.3._General_Application_Requirements_for_Perimeters_and_Walls | Article 10.3.2.3.]])</big></big></big></big></big><br />
{{Template:Construction Details Header}}<br />
<div class="panel panel-success"><br />
<div class="panel-heading"><big>'''SBS Details'''</big></div><br />
<div class="panel-body"><br />
<div class="col-md-6"><br />
<div style="text-align:center; vertical-align:center"><br />
<br><br />
[[File:10.3.2.3.-SBS-C.png|class=img-responsive | link=https://rpm.rcabc.org/images/4/43/10.3.2.3.-SBS-C.png]]<br />
:Drawing NTS<br />
</div><br />
</div><!-- COL-6-MD --><br />
<br />
<div class="col-md-6"><br />
=== WORK INCLUDED ===<br />
<br />
;(1) [[SBS Roof Systems Standard#PART_6|<big>Air/Vapour Control Layers</big>]]: <br />
:As specified by the ''Design Authority'' and installed to provide continuity for optimal control.<br />
;(2) [[SBS Roof Systems Standard#PART_7|<big>Insulation</big>]]:<br />
:Installed in keeping with Section 7.3. Multiple layering illustrated; layers must be offset and staggered at least 304.8 mm (12”) in each direction.<br />
;(3) [[SBS Roof Systems Standard#PART_8|<big>Insulation Overlay Panel</big>]]:<br />
:Required for fully adhered membrane systems or when overburden is specified. Panels must be offset and staggered from underlying insulation panels.<br />
;(4) [[SBS Roof Systems Standard#PART_9|<big>Base Sheet Field Membrane</big>]]:<br />
:See Table 9.2. for permissible application methods and corresponding membrane properties. Membrane must be installed according to the requirements in Section 9.3.<br />
;(5) [[SBS Roof Systems Standard#PART_10|<big>Base Sheet Flashing Membrane</big>]]:<br />
:Install in keeping with the requirements in Section 10.3. Base sheet membrane flashing must extend onto the roof field at least 101.6 mm (4"). Membrane shall be carried up the vertical substrate at least 203.2 mm (8”) above the ''finished roof system surface'', plus at least 76.2 mm (3”) for wall control layer overlap. In regions where heavy snow accumulation is possible, or to accommodate future roof membrane replacement, membrane should be carried at least 304.8 mm (12”) up the vertical substrate.<br />
;(6) [[SBS Roof Systems Standard#PART_10|<big>Cap Sheet Field Membrane</big>]]:<br />
:See Table 9.2. for permissible application methods and corresponding membrane properties. Membrane must be installed according to the requirements in Section 9.3.<br />
;(7) [[SBS Roof Systems Standard#PART_10|<big>Cap Sheet Flashing Membrane</big>]]:<br />
:Install in keeping with the requirements in Section 10.3. Cap sheet membrane flashing must extend onto the field at least 152.4 mm (6"), or at least 50.8 mm (2”) past the edge of the base membrane flashing.<br />
;(8) [[SBS Roof Systems Standard#PART_10|<big>Membrane Edge Securement and Sealant</big>]]:<br />
:All membranes applied to a vertical surface must be mechanically fastened. 2-component fleece-reinforced PMMA/PUMA is illustrated, together with sealant applied to upper membrane edge (See [[SBS Roof Systems Standard#10.3.3.4. Liquid Membrane Flashing | Article 10.3.3.4.]] for application requirements); liquid membrane flashing must be compatible with the primary membrane and listed in [https://rpm.rcabc.org/index.php?title=Division_C Division C] of the RPM.<br />
<br />
=== RELATED WORK BY OTHERS ===<br />
;(A) [[SBS Roof Systems Standard#PART_2|<big>Acceptable Deck</big>]]<br />
:Illustrated deck is representative. See Sub-section 2.1.5. for acceptable ''deck'' types and conditions.<br />
;(B) [[SBS Roof Systems Standard#PART_2|<big>Wall Structure</big>]]<br />
:Illustrated wall is representative. Wall control layers (i.e. water resistive barrier) must overlap ''roofing system'' to achieve ''continuity''. See Sub-section 2.1.7. for wall conditions.<br />
<br />
</div><!-- COL-6-MD --><br />
</div><!-- PANEL BODY --><br />
</div><!-- PANEL --><br />
<br />
'''NOTE''': See the [[SBS Roof Systems Standard | '''SBS Roof Systems Standard''']] for additional requirements.<br />
<br />
<hr><br />
<br />
[[SBS Roof System Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''SBS Roof System Details'']]<br />
<br />
[[Main Page | <i class="fa fa-home fa"></i> Home]]<br />
<br />
{{Template:RPM Page Footer with Copyright and Current Date}}</div>James Klassenhttp://rpm.rcabc.org/index.php?title=SBS_Membrane_Termination_BSBS Membrane Termination B2024-02-26T15:56:33Z<p>James Klassen: Created page with "{{Template:RPM Info}} {{DISPLAYTITLE:<span style="position: absolute; clip: rect(1px 1px 1px 1px); clip: rect(1px, 1px, 1px, 1px);">{{FULLPAGENAME}}</span>}} __NOTOC__ <big>..."</p>
<hr />
<div>{{Template:RPM Info}}<br />
<br />
{{DISPLAYTITLE:<span style="position: absolute; clip: rect(1px 1px 1px 1px); clip: rect(1px, 1px, 1px, 1px);">{{FULLPAGENAME}}</span>}}<br />
__NOTOC__<br />
<br />
<big><big>Division D - Construction Details</big></big><br />
<hr><br />
<big><big><big><big><big>SBS | Membrane Termination B (Wall) ([[SBS_Roof_Systems_Standard#10.3.2.3._General_Application_Requirements_for_Perimeters_and_Walls | Article 10.3.2.3.]])</big></big></big></big></big><br />
{{Template:Construction Details Header}}<br />
<div class="panel panel-success"><br />
<div class="panel-heading"><big>'''SBS Details'''</big></div><br />
<div class="panel-body"><br />
<div class="col-md-6"><br />
<div style="text-align:center; vertical-align:center"><br />
<br><br />
[[File:10.3.2.3.-SBS-B.png|class=img-responsive | link=https://rpm.rcabc.org/images/5/55/10.3.2.3.-SBS-B.png]]<br />
:Drawing NTS<br />
</div><br />
</div><!-- COL-6-MD --><br />
<br />
<div class="col-md-6"><br />
=== WORK INCLUDED ===<br />
<br />
;(1) [[SBS Roof Systems Standard#PART_6|<big>Air/Vapour Control Layers</big>]]: <br />
:As specified by the ''Design Authority'' and installed to provide continuity for optimal control.<br />
;(2) [[SBS Roof Systems Standard#PART_7|<big>Insulation</big>]]:<br />
:Installed in keeping with Section 7.3. Multiple layering illustrated; layers must be offset and staggered at least 304.8 mm (12”) in each direction.<br />
;(3) [[SBS Roof Systems Standard#PART_8|<big>Insulation Overlay Panel</big>]]:<br />
:Required for fully adhered membrane systems or when overburden is specified. Panels must be offset and staggered from underlying insulation panels.<br />
;(4) [[SBS Roof Systems Standard#PART_9|<big>Base Sheet Field Membrane</big>]]:<br />
:See Table 9.2. for permissible application methods and corresponding membrane properties. Membrane must be installed according to the requirements in Section 9.3.<br />
;(5) [[SBS Roof Systems Standard#PART_10|<big>Base Sheet Flashing Membrane</big>]]:<br />
:Install in keeping with the requirements in Section 10.3. Base sheet membrane flashing must extend onto the roof field at least 101.6 mm (4"). Membrane shall be carried up the vertical substrate at least 203.2 mm (8”) above the ''finished roof system surface'', plus at least 76.2 mm (3”) for wall control layer overlap. In regions where heavy snow accumulation is possible, or to accommodate future roof membrane replacement, membrane should be carried at least 304.8 mm (12”) up the vertical substrate.<br />
;(6) [[SBS Roof Systems Standard#PART_10|<big>Cap Sheet Field Membrane</big>]]:<br />
:See Table 9.2. for permissible application methods and corresponding membrane properties. Membrane must be installed according to the requirements in Section 9.3.<br />
;(7) [[SBS Roof Systems Standard#PART_10|<big>Cap Sheet Flashing Membrane</big>]]:<br />
:Install in keeping with the requirements in Section 10.3. Cap sheet membrane flashing must extend onto the field at least 152.4 mm (6"), or at least 50.8 mm (2”) past the edge of the base membrane flashing.<br />
;(8) [[SBS Roof Systems Standard#PART_10|<big>Membrane Edge Securement and Sealant</big>]]:<br />
:All membranes applied to a vertical surface must be mechanically fastened. Fastener illustrated, together with sealant applied to upper membrane edge.<br />
<br />
=== RELATED WORK BY OTHERS ===<br />
;(A) [[SBS Roof Systems Standard#PART_2|<big>Acceptable Deck</big>]]<br />
:Illustrated deck is representative. See Sub-section 2.1.5. for acceptable ''deck'' types and conditions.<br />
;(B) [[SBS Roof Systems Standard#PART_2|<big>Wall Structure</big>]]<br />
:Illustrated wall is representative. Wall control layers (i.e. water resistive barrier) must overlap ''roofing system'' to achieve ''continuity''. See Sub-section 2.1.7. for wall conditions.<br />
;(C) <big>Wall System Finish</big><br />
:Illustrated system is representative and shows water-resistive barrier overlapping roof membrane (See above, Item 8).<br />
<br />
</div><!-- COL-6-MD --><br />
</div><!-- PANEL BODY --><br />
</div><!-- PANEL --><br />
<br />
'''NOTE''': See the [[SBS Roof Systems Standard | '''SBS Roof Systems Standard''']] for additional requirements.<br />
<br />
<hr><br />
<br />
[[SBS Roof System Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''SBS Roof System Details'']]<br />
<br />
[[Main Page | <i class="fa fa-home fa"></i> Home]]<br />
<br />
{{Template:RPM Page Footer with Copyright and Current Date}}</div>James Klassenhttp://rpm.rcabc.org/index.php?title=SBS_Membrane_Termination_ASBS Membrane Termination A2024-02-26T15:55:59Z<p>James Klassen: Created page with "{{Template:RPM Info}} {{DISPLAYTITLE:<span style="position: absolute; clip: rect(1px 1px 1px 1px); clip: rect(1px, 1px, 1px, 1px);">{{FULLPAGENAME}}</span>}} __NOTOC__ <big>..."</p>
<hr />
<div>{{Template:RPM Info}}<br />
<br />
{{DISPLAYTITLE:<span style="position: absolute; clip: rect(1px 1px 1px 1px); clip: rect(1px, 1px, 1px, 1px);">{{FULLPAGENAME}}</span>}}<br />
__NOTOC__<br />
<br />
<big><big>Division D - Construction Details</big></big><br />
<hr><br />
<big><big><big><big><big>SBS | Membrane Termination A (Wall) ([[SBS_Roof_Systems_Standard#10.3.2.3._General_Application_Requirements_for_Perimeters_and_Walls | Article 10.3.2.3.]])</big></big></big></big></big><br />
{{Template:Construction Details Header}}<br />
<div class="panel panel-success"><br />
<div class="panel-heading"><big>'''SBS Details'''</big></div><br />
<div class="panel-body"><br />
<div class="col-md-6"><br />
<div style="text-align:center; vertical-align:center"><br />
<br><br />
[[File:10.3.2.3.-SBS-A.png |class=img-responsive | link=https://rpm.rcabc.org/images/d/dd/10.3.2.3.-SBS-A.png]]<br />
:Drawing NTS<br />
</div><br />
</div><!-- COL-6-MD --><br />
<br />
<div class="col-md-6"><br />
=== WORK INCLUDED ===<br />
<br />
;(1) [[SBS Roof Systems Standard#PART_6|<big>Air/Vapour Control Layers</big>]]: <br />
:As specified by the ''Design Authority'' and installed to provide continuity for optimal control.<br />
;(2) [[SBS Roof Systems Standard#PART_7|<big>Insulation</big>]]:<br />
:Installed in keeping with Section 7.3. Multiple layering illustrated; layers must be offset and staggered at least 304.8 mm (12”) in each direction.<br />
;(3) [[SBS Roof Systems Standard#PART_8|<big>Insulation Overlay Panel</big>]]:<br />
:Required for fully adhered membrane systems or when overburden is specified. Panels must be offset and staggered from underlying insulation panels.<br />
;(4) [[SBS Roof Systems Standard#PART_9|<big>Base Sheet Field Membrane</big>]]:<br />
:See Table 9.2. for permissible application methods and corresponding membrane properties. Membrane must be installed according to the requirements in Section 9.3.<br />
;(5) [[SBS Roof Systems Standard#PART_10|<big>Primer or Adhesive</big>]]:<br />
:Proprietary to the membrane manufacturer. Primer may be required for self-adhered membranes. All membranes applied to the vertical substrate must be fully adhered.<br />
;(6) [[SBS Roof Systems Standard#PART_10|<big>Base Sheet Flashing Membrane</big>]]:<br />
:Install in keeping with the requirements in Section 10.3. Base sheet membrane flashing must extend onto the roof field at least 101.6 mm (4"). Membrane shall be carried up the vertical substrate at least 203.2 mm (8”) above the ''finished roof system surface'', plus at least 76.2 mm (3”) for wall control layer overlap. In regions where heavy snow accumulation is possible, or to accommodate future roof membrane replacement, membrane should be carried at least 304.8 mm (12”) up the vertical substrate.<br />
;(7) [[SBS Roof Systems Standard#PART_10|<big>Cap Sheet Field Membrane</big>]]:<br />
:See Table 9.2. for permissible application methods and corresponding membrane properties. Membrane must be installed according to the requirements in Section 9.3.<br />
;(8) [[SBS Roof Systems Standard#PART_10|<big>Cap Sheet Flashing Membrane</big>]]:<br />
:Install in keeping with the requirements in Section 10.3. Cap sheet membrane flashing must extend onto the field at least 152.4 mm (6"), or at least 50.8 mm (2”) past the edge of the base membrane flashing.<br />
;(9) [[SBS Roof Systems Standard#PART_10|<big>Rigid Support for Through-wall Flashing (optional)</big>]]:<br />
:Where the ''wall'' is insulated on the exterior side of the structure, ''continuity'' of air and vapour controls must be protected from future damage during roof replacement. This can be done by securing a suitable membrane receiver panel against the insulation. The panel must be permanently affixed to the structure through the insulation. During replacement of the roof membrane, membrane flashing may be removed from the receiver panel without disturbing the insulation and control layers. In this way, material waste is also reduced.<br />
<br />
:Where the membrane may not easily separate from its receiver during roof replacement, a second panel (not illustrated) can be screw-fastened to the first. During replacement, both the membrane and the secondary panel may be removed together, simplifying membrane replacement.<br />
;(10) [[SBS Roof Systems Standard#PART_10|<big>Membrane Flashing Substrate</big>]]:<br />
:''Continuity'' of the water-resistive barrier means it must pass through the insulation assembly installed on the exterior side of the wall structure. To do that, a membrane flashing passes through the insulation where the ''roof system'' terminates. Blocking or another suitable support (i.e., hat track) is necessary to support the membrane and its linear metal flashing carrier. Wood blocking illustrated.<br />
;(10) [[SBS Roof Systems Standard#PART_10|<big>Through-wall Flashing</big>]]:<br />
:A self-adhered membrane is used to transition from the ''wall'' to the ''roofing assembly'', providing a continuous drainage path for water. Secure the ''linear metal flashing'' to the support underneath (see Item 9 or 10 above). <br />
<br />
:Note that the water resistive barrier membrane from the ''wall'' (installed by others – see Related Work below) overlaps the through-wall flashing (installed by the ''Contractor'') and is supported by a metal flashing with drip edge, to direct water from the wall to the roof surface.<br />
<br />
=== RELATED WORK BY OTHERS ===<br />
;(A) [[SBS Roof Systems Standard#PART_2|<big>Acceptable Deck</big>]]<br />
:Illustrated deck is representative. See Sub-section 2.1.5. for acceptable ''deck'' types and conditions.<br />
;(B) [[SBS Roof Systems Standard#PART_2|<big>Wall Structure</big>]]<br />
:Illustrated wall is representative. Wall control layers (i.e., water resistive barrier) must overlap ''roofing system'' to achieve ''continuity''. See Sub-section 2.1.7. for wall conditions.<br />
;(C) <big>Wall System Finish</big><br />
:Illustrated system is representative and shows water-resistive barrier overlapping roof membrane (See above, Item 8).<br />
<br />
</div><!-- COL-6-MD --><br />
</div><!-- PANEL BODY --><br />
</div><!-- PANEL --><br />
<br />
'''NOTE''': See the [[SBS Roof Systems Standard | '''SBS Roof Systems Standard''']] for additional requirements.<br />
<br />
<hr><br />
<br />
[[SBS Roof System Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''SBS Roof System Details'']]<br />
<br />
[[Main Page | <i class="fa fa-home fa"></i> Home]]<br />
<br />
{{Template:RPM Page Footer with Copyright and Current Date}}</div>James Klassenhttp://rpm.rcabc.org/index.php?title=Draft_CD_24Draft CD 242024-02-23T22:36:40Z<p>James Klassen: Created page with " {{DISPLAYTITLE:<span style="position: absolute; clip: rect(1px 1px 1px 1px); clip: rect(1px, 1px, 1px, 1px);">{{FULLPAGENAME}}</span>}} __NOTOC__ <big><big>Division D - Con..."</p>
<hr />
<div><br />
<br />
{{DISPLAYTITLE:<span style="position: absolute; clip: rect(1px 1px 1px 1px); clip: rect(1px, 1px, 1px, 1px);">{{FULLPAGENAME}}</span>}}<br />
__NOTOC__<br />
<br />
<big><big>Division D - Construction Details</big></big><br />
<hr><br />
<big><big><big><big><big>TPO | Membrane Termination F (Wall) ([[TPO_Roof_Systems_Standard#10.3.2.3._General_Application_Requirements_for_Perimeters_and_Walls | Article 10.3.2.3.]])</big></big></big></big></big><br />
{{Template:Construction Details Header}}<br />
<div class="panel panel-success"><br />
<div class="panel-heading"><big>'''TPO Details'''</big></div><br />
<div class="panel-body"><br />
<div class="col-md-6"><br />
<div style="text-align:center; vertical-align:center"><br />
<br><br />
[[File:10.3.2.3.-TPO-F.png|class=img-responsive | link=https://rpm.rcabc.org/images/0/02/10.3.2.3.-TPO-F.png]]<br />
:Drawing NTS<br />
</div><br />
</div><!-- COL-6-MD --><br />
<br />
<div class="col-md-6"><br />
=== WORK INCLUDED ===<br />
<br />
;(1) [[TPO Roof Systems Standard#PART_6|<big>Air/Vapour Control Layers</big>]]: <br />
:As specified by the ''Design Authority'' and installed to provide continuity for optimal control.<br />
;(2) [[TPO Roof Systems Standard#PART_7|<big>Insulation</big>]]:<br />
:Installed in keeping with Section 7.3. Multiple layering illustrated; layers must be offset and staggered at least 304.8 mm (12”) in each direction.<br />
;(3) [[TPO Roof Systems Standard#PART_8|<big>Insulation Overlay Panel</big>]]:<br />
:Required for fully adhered membrane systems or when overburden is specified. Panels must be offset and staggered from underlying insulation panels.<br />
;(4) [[TPO Roof Systems Standard#PART_9|<big>Field Membrane</big>]]:<br />
:See Table 9.2. for permissible application methods and corresponding membrane properties. Membrane must be installed according to the requirements in Section 9.3.<br />
;(5) [[TPO Roof Systems Standard#PART_10|<big>Edge Securement</big>]]:<br />
:Proprietary to the membrane manufacturer. Edge securement is required, irrespective of how the membrane is applied (i.e., adhered, self-adhered, mechanically fastened).<br />
;(6) [[TPO Roof Systems Standard#PART_10|<big>Mechanical Fastening</big>]]:<br />
:Edge securement must be anchored to the roof structure to prevent membrane movement.<br />
;(7) [[TPO Roof Systems Standard#PART_10|<big>Primer or Adhesive</big>]]:<br />
:Proprietary to the membrane manufacturer. Primer may be required for self-adhered membranes; adhesive is required for all other applications. All membranes applied to the vertical substrate must be fully adhered.<br />
;(8) [[TPO Roof Systems Standard#PART_10|<big>Membrane Flashing</big>]]:<br />
:May be run continuously up the vertical substrate from the field or installed as separate flashing (see membrane manufacturer requirements). Membrane shall be carried up the vertical substrate at least 203.2 mm (8”) above the ''finished roof system surface'', plus at least 76.2 mm (3”) for wall control layer overlap. In regions where heavy snow accumulation is possible, or to accommodate future roof membrane replacement, membrane should be carried at least 304.8 mm (12”) up the vertical substrate.<br />
;(9) [[TPO Roof Systems Standard#PART_10|<big>Primary Surface Reglet Counter-flashing and Sealant</big>]]:<br />
:Surface reglet counter-flashing with bead of sealant applied in reglet cut. In this illustration, the linear metal flashing serves to secure the membrane. All membranes applied to a vertical surface must be mechanically fastened.<br />
;(10) [[TPO Roof Systems Standard#PART_10|<big>Secondary Surface Reglet Counter-flashing and Sealant</big>]]:<br />
:Surface reglet counter-flashing with bead of sealant applied in reglet cut. This flashing provides secondary protection for the primary surface reglet/counter-flashing and safe-guards the sealant from weather-induced deterioration and mechanical damage.<br />
<br />
=== RELATED WORK BY OTHERS ===<br />
;(A) [[TPO Roof Systems Standard#PART_2|<big>Acceptable Deck</big>]]<br />
:Illustrated deck is representative. See Sub-section 2.1.5. for acceptable ''deck'' types and conditions.<br />
;(B) [[TPO Roof Systems Standard#PART_2|<big>Wall Structure</big>]]<br />
:Illustrated wall is representative. Wall control layers (i.e. water resistive barrier) must overlap ''roofing system'' to achieve ''continuity''. See Sub-section 2.1.7. for wall conditions.<br />
<br />
</div><!-- COL-6-MD --><br />
</div><!-- PANEL BODY --><br />
</div><!-- PANEL --><br />
<br />
'''NOTE''': See the [[TPO Roof Systems Standard | '''TPO Roof Systems Standard''']] for additional requirements.<br />
<br />
<hr><br />
<br />
[[TPO Roof System Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''TPO Roof System Details'']]<br />
<br />
[[Main Page | <i class="fa fa-home fa"></i> Home]]<br />
<br />
{{Template:RPM Page Footer with Copyright and Current Date}}</div>James Klassenhttp://rpm.rcabc.org/index.php?title=Draft_CD_23Draft CD 232024-02-23T22:32:48Z<p>James Klassen: Created page with " {{DISPLAYTITLE:<span style="position: absolute; clip: rect(1px 1px 1px 1px); clip: rect(1px, 1px, 1px, 1px);">{{FULLPAGENAME}}</span>}} __NOTOC__ <big><big>Division D - Con..."</p>
<hr />
<div><br />
<br />
{{DISPLAYTITLE:<span style="position: absolute; clip: rect(1px 1px 1px 1px); clip: rect(1px, 1px, 1px, 1px);">{{FULLPAGENAME}}</span>}}<br />
__NOTOC__<br />
<br />
<big><big>Division D - Construction Details</big></big><br />
<hr><br />
<big><big><big><big><big>TPO | Membrane Termination E (Wall) ([[TPO_Roof_Systems_Standard#10.3.2.3._General_Application_Requirements_for_Perimeters_and_Walls | Article 10.3.2.3.]])</big></big></big></big></big><br />
{{Template:Construction Details Header}}<br />
<div class="panel panel-success"><br />
<div class="panel-heading"><big>'''TPO Details'''</big></div><br />
<div class="panel-body"><br />
<div class="col-md-6"><br />
<div style="text-align:center; vertical-align:center"><br />
<br><br />
[[File:10.3.2.3.-TPO-E.png|class=img-responsive | link=https://rpm.rcabc.org/images/5/50/10.3.2.3.-TPO-E.png]]<br />
:Drawing NTS<br />
</div><br />
</div><!-- COL-6-MD --><br />
<br />
<div class="col-md-6"><br />
=== WORK INCLUDED ===<br />
<br />
;(1) [[TPO Roof Systems Standard#PART_6|<big>Air/Vapour Control Layers</big>]]: <br />
:As specified by the ''Design Authority'' and installed to provide continuity for optimal control.<br />
;(2) [[TPO Roof Systems Standard#PART_7|<big>Insulation</big>]]:<br />
:Installed in keeping with Section 7.3. Multiple layering illustrated; layers must be offset and staggered at least 304.8 mm (12”) in each direction.<br />
;(3) [[TPO Roof Systems Standard#PART_8|<big>Insulation Overlay Panel</big>]]:<br />
:Required for fully adhered membrane systems or when overburden is specified. Panels must be offset and staggered from underlying insulation panels.<br />
;(4) [[TPO Roof Systems Standard#PART_9|<big>Field Membrane</big>]]:<br />
:See Table 9.2. for permissible application methods and corresponding membrane properties. Membrane must be installed according to the requirements in Section 9.3.<br />
;(5) [[TPO Roof Systems Standard#PART_10|<big>Edge Securement</big>]]:<br />
:Proprietary to the membrane manufacturer. Edge securement is required, irrespective of how the membrane is applied (i.e., adhered, self-adhered, mechanically fastened).<br />
;(6) [[TPO Roof Systems Standard#PART_10|<big>Mechanical Fastening</big>]]:<br />
:Edge securement must be anchored to the roof structure to prevent membrane movement.<br />
;(7) [[TPO Roof Systems Standard#PART_10|<big>Primer or Adhesive</big>]]:<br />
:Proprietary to the membrane manufacturer. Primer may be required for self-adhered membranes; adhesive is required for all other applications. All membranes applied to the vertical substrate must be fully adhered.<br />
;(8) [[TPO Roof Systems Standard#PART_10|<big>Membrane Flashing</big>]]:<br />
:May be run continuously up the vertical substrate from the field or installed as separate flashing (see membrane manufacturer requirements). Membrane shall be carried up the vertical substrate at least 203.2 mm (8”) above the ''finished roof system surface'', plus at least 76.2 mm (3”) for wall control layer overlap. In regions where heavy snow accumulation is possible, or to accommodate future roof membrane replacement, membrane should be carried at least 304.8 mm (12”) up the vertical substrate.<br />
;(9) [[TPO Roof Systems Standard#PART_10|<big>Membrane Edge Securement and Sealant</big>]]:<br />
:All membranes applied to a vertical surface must be mechanically fastened. Mechanically fastened termination (“term”) bar with tooled sealant shown.<br />
;(10) [[TPO Roof Systems Standard#PART_10|<big>Surface Reglet Counter-flashing and Sealant</big>]]:<br />
:Surface reglet counter-flashing with bead of sealant applied in reglet cut. This flashing provides secondary protection for the “term” bar and safe-guards the sealant from weather-induced deterioration and mechanical damage.<br />
<br />
=== RELATED WORK BY OTHERS ===<br />
;(A) [[TPO Roof Systems Standard#PART_2|<big>Acceptable Deck</big>]]<br />
:Illustrated deck is representative. See Sub-section 2.1.5. for acceptable ''deck'' types and conditions.<br />
;(B) [[TPO Roof Systems Standard#PART_2|<big>Wall Structure</big>]]<br />
:Illustrated wall is representative. Wall control layers (i.e. water resistive barrier) must overlap ''roofing system'' to achieve ''continuity''. See Sub-section 2.1.7. for wall conditions.<br />
<br />
</div><!-- COL-6-MD --><br />
</div><!-- PANEL BODY --><br />
</div><!-- PANEL --><br />
<br />
'''NOTE''': See the [[TPO Roof Systems Standard | '''TPO Roof Systems Standard''']] for additional requirements.<br />
<br />
<hr><br />
<br />
[[TPO Roof System Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''TPO Roof System Details'']]<br />
<br />
[[Main Page | <i class="fa fa-home fa"></i> Home]]<br />
<br />
{{Template:RPM Page Footer with Copyright and Current Date}}</div>James Klassenhttp://rpm.rcabc.org/index.php?title=Draft_CD_22Draft CD 222024-02-23T22:28:26Z<p>James Klassen: Created page with " {{DISPLAYTITLE:<span style="position: absolute; clip: rect(1px 1px 1px 1px); clip: rect(1px, 1px, 1px, 1px);">{{FULLPAGENAME}}</span>}} __NOTOC__ <big><big>Division D - Con..."</p>
<hr />
<div><br />
<br />
{{DISPLAYTITLE:<span style="position: absolute; clip: rect(1px 1px 1px 1px); clip: rect(1px, 1px, 1px, 1px);">{{FULLPAGENAME}}</span>}}<br />
__NOTOC__<br />
<br />
<big><big>Division D - Construction Details</big></big><br />
<hr><br />
<big><big><big><big><big>TPO | Membrane Termination D (Wall) ([[TPO_Roof_Systems_Standard#10.3.2.3._General_Application_Requirements_for_Perimeters_and_Walls | Article 10.3.2.3.]])</big></big></big></big></big><br />
{{Template:Construction Details Header}}<br />
<div class="panel panel-success"><br />
<div class="panel-heading"><big>'''TPO Details'''</big></div><br />
<div class="panel-body"><br />
<div class="col-md-6"><br />
<div style="text-align:center; vertical-align:center"><br />
<br><br />
[[File:10.3.2.3.-TPO-D.png|class=img-responsive | link=https://rpm.rcabc.org/images/5/57/10.3.2.3.-TPO-D.png]]<br />
:Drawing NTS<br />
</div><br />
</div><!-- COL-6-MD --><br />
<br />
<div class="col-md-6"><br />
=== WORK INCLUDED ===<br />
<br />
;(1) [[TPO Roof Systems Standard#PART_6|<big>Air/Vapour Control Layers</big>]]: <br />
:As specified by the ''Design Authority'' and installed to provide continuity for optimal control.<br />
;(2) [[TPO Roof Systems Standard#PART_7|<big>Insulation</big>]]:<br />
:Installed in keeping with Section 7.3. Multiple layering illustrated; layers must be offset and staggered at least 304.8 mm (12”) in each direction.<br />
;(3) [[TPO Roof Systems Standard#PART_8|<big>Insulation Overlay Panel</big>]]:<br />
:Required for fully adhered membrane systems or when overburden is specified. Panels must be offset and staggered from underlying insulation panels.<br />
;(4) [[TPO Roof Systems Standard#PART_9|<big>Field Membrane</big>]]:<br />
:See Table 9.2. for permissible application methods and corresponding membrane properties. Membrane must be installed according to the requirements in Section 9.3.<br />
;(5) [[TPO Roof Systems Standard#PART_10|<big>Edge Securement</big>]]:<br />
:Proprietary to the membrane manufacturer. Edge securement is required, irrespective of how the membrane is applied (i.e., adhered, self-adhered, mechanically fastened).<br />
;(6) [[TPO Roof Systems Standard#PART_10|<big>Mechanical Fastening</big>]]:<br />
:Edge securement must be anchored to the roof structure to prevent membrane movement.<br />
;(7) [[TPO Roof Systems Standard#PART_10|<big>Primer or Adhesive</big>]]:<br />
:Proprietary to the membrane manufacturer. Primer may be required for self-adhered membranes; adhesive is required for all other applications. All membranes applied to the vertical substrate must be fully adhered.<br />
;(8) [[TPO Roof Systems Standard#PART_10|<big>Membrane Flashing</big>]]:<br />
:May be run continuously up the vertical substrate from the field or installed as separate flashing (see membrane manufacturer requirements). Membrane shall be carried up the vertical substrate at least 203.2 mm (8”) above the ''finished roof system surface'', plus at least 76.2 mm (3”) for wall control layer overlap. In regions where heavy snow accumulation is possible, or to accommodate future roof membrane replacement, membrane should be carried at least 304.8 mm (12”) up the vertical substrate.<br />
;(9) [[TPO Roof Systems Standard#PART_10|<big>Membrane Edge Securement and Sealant</big>]]:<br />
:All membranes applied to a vertical surface must be mechanically fastened. Mechanically fastened termination (“term”) bar with tooled sealant shown.<br />
;(10) [[TPO Roof Systems Standard#PART_10|<big>Cut Reglet Counter-flashing and Sealant</big>]]:<br />
:Cut reglet counter-flashing with bead of sealant applied in reglet cut. This flashing provides secondary protection for the “term” bar and safe-guards the sealant from weather-induced deterioration and mechanical damage.<br />
<br />
=== RELATED WORK BY OTHERS ===<br />
;(A) [[TPO Roof Systems Standard#PART_2|<big>Acceptable Deck</big>]]<br />
:Illustrated deck is representative. See Sub-section 2.1.5. for acceptable ''deck'' types and conditions.<br />
;(B) [[TPO Roof Systems Standard#PART_2|<big>Wall Structure</big>]]<br />
:Illustrated wall is representative. Wall control layers (i.e. water resistive barrier) must overlap ''roofing system'' to achieve ''continuity''. See Sub-section 2.1.7. for wall conditions.<br />
<br />
</div><!-- COL-6-MD --><br />
</div><!-- PANEL BODY --><br />
</div><!-- PANEL --><br />
<br />
'''NOTE''': See the [[PVC Roof Systems Standard | '''TPO Roof Systems Standard''']] for additional requirements.<br />
<br />
<hr><br />
<br />
[[TPO Roof System Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''TPO Roof System Details'']]<br />
<br />
[[Main Page | <i class="fa fa-home fa"></i> Home]]<br />
<br />
{{Template:RPM Page Footer with Copyright and Current Date}}</div>James Klassenhttp://rpm.rcabc.org/index.php?title=Draft_CD_21Draft CD 212024-02-23T22:20:35Z<p>James Klassen: Created page with " {{DISPLAYTITLE:<span style="position: absolute; clip: rect(1px 1px 1px 1px); clip: rect(1px, 1px, 1px, 1px);">{{FULLPAGENAME}}</span>}} __NOTOC__ <big><big>Division D - Con..."</p>
<hr />
<div><br />
<br />
{{DISPLAYTITLE:<span style="position: absolute; clip: rect(1px 1px 1px 1px); clip: rect(1px, 1px, 1px, 1px);">{{FULLPAGENAME}}</span>}}<br />
__NOTOC__<br />
<br />
<big><big>Division D - Construction Details</big></big><br />
<hr><br />
<big><big><big><big><big>TPO | Membrane Termination C (Wall) ([[TPO_Roof_Systems_Standard#10.3.2.3._General_Application_Requirements_for_Perimeters_and_Walls | Article 10.3.2.3.]])</big></big></big></big></big><br />
{{Template:Construction Details Header}}<br />
<div class="panel panel-success"><br />
<div class="panel-heading"><big>'''TPO Details'''</big></div><br />
<div class="panel-body"><br />
<div class="col-md-6"><br />
<div style="text-align:center; vertical-align:center"><br />
<br><br />
[[File:10.3.2.3.-TPO-C.png|class=img-responsive | link=https://rpm.rcabc.org/images/8/8f/10.3.2.3.-TPO-C.png]]<br />
:Drawing NTS<br />
</div><br />
</div><!-- COL-6-MD --><br />
<br />
<div class="col-md-6"><br />
=== WORK INCLUDED ===<br />
<br />
;(1) [[TPO Roof Systems Standard#PART_6|<big>Air/Vapour Control Layers</big>]]: <br />
:As specified by the ''Design Authority'' and installed to provide continuity for optimal control.<br />
;(2) [[TPO Roof Systems Standard#PART_7|<big>Insulation</big>]]:<br />
:Installed in keeping with Section 7.3. Multiple layering illustrated; layers must be offset and staggered at least 304.8 mm (12”) in each direction.<br />
;(3) [[TPO Roof Systems Standard#PART_8|<big>Insulation Overlay Panel</big>]]:<br />
:Required for fully adhered membrane systems or when overburden is specified. Panels must be offset and staggered from underlying insulation panels.<br />
;(4) [[TPO Roof Systems Standard#PART_9|<big>Field Membrane</big>]]:<br />
:See Table 9.2. for permissible application methods and corresponding membrane properties. Membrane must be installed according to the requirements in Section 9.3.<br />
;(5) [[TPO Roof Systems Standard#PART_10|<big>Edge Securement</big>]]:<br />
:Proprietary to the membrane manufacturer. Edge securement is required, irrespective of how the membrane is applied (i.e., adhered, self-adhered, mechanically fastened).<br />
;(6) [[TPO Roof Systems Standard#PART_10|<big>Mechanical Fastening</big>]]:<br />
:Edge securement must be anchored to the roof structure to prevent membrane movement.<br />
;(7) [[TPO Roof Systems Standard#PART_10|<big>Primer or Adhesive</big>]]:<br />
:Proprietary to the membrane manufacturer. Primer may be required for self-adhered membranes; adhesive is required for all other applications. All membranes applied to the vertical substrate must be fully adhered.<br />
;(8) [[TPO Roof Systems Standard#PART_10|<big>Membrane Flashing</big>]]:<br />
:May be run continuously up the vertical substrate from the field or installed as separate flashing (see membrane manufacturer requirements). Membrane shall be carried up the vertical substrate at least 203.2 mm (8”) above the ''finished roof system surface'', plus at least 76.2 mm (3”) for wall control layer overlap. In regions where heavy snow accumulation is possible, or to accommodate future roof membrane replacement, membrane should be carried at least 304.8 mm (12”) up the vertical substrate.<br />
;(9) [[TPO Roof Systems Standard#PART_10|<big>Membrane Edge Securement and Sealant</big>]]:<br />
:All membranes applied to a vertical surface must be mechanically fastened. 2-component fleece-reinforced PMMA/PUMA is illustrated, together with sealant applied to upper membrane edge (See [[PVC Roof Systems Standard#10.3.3.4. Liquid Membrane Flashing | Article 10.3.3.4.]] for application requirements); liquid membrane flashing must be compatible with the primary membrane and listed in [https://rpm.rcabc.org/index.php?title=Division_C Division C] of the RPM.<br />
<br />
=== RELATED WORK BY OTHERS ===<br />
;(A) [[TPO Roof Systems Standard#PART_2|<big>Acceptable Deck</big>]]<br />
:Illustrated deck is representative. See Sub-section 2.1.5. for acceptable ''deck'' types and conditions.<br />
;(B) [[TPO Roof Systems Standard#PART_2|<big>Wall Structure</big>]]<br />
:Illustrated wall is representative. Wall control layers (i.e. water resistive barrier) must overlap ''roofing system'' to achieve ''continuity''. See Sub-section 2.1.7. for wall conditions.<br />
<br />
</div><!-- COL-6-MD --><br />
</div><!-- PANEL BODY --><br />
</div><!-- PANEL --><br />
<br />
'''NOTE''': See the [[TPO Roof Systems Standard | '''TPO Roof Systems Standard''']] for additional requirements.<br />
<br />
<hr><br />
<br />
[[TPO Roof System Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''TPO Roof System Details'']]<br />
<br />
[[Main Page | <i class="fa fa-home fa"></i> Home]]<br />
<br />
{{Template:RPM Page Footer with Copyright and Current Date}}</div>James Klassenhttp://rpm.rcabc.org/index.php?title=Draft_CD_20Draft CD 202024-02-23T22:16:48Z<p>James Klassen: Created page with " {{DISPLAYTITLE:<span style="position: absolute; clip: rect(1px 1px 1px 1px); clip: rect(1px, 1px, 1px, 1px);">{{FULLPAGENAME}}</span>}} __NOTOC__ <big><big>Division D - Con..."</p>
<hr />
<div><br />
<br />
{{DISPLAYTITLE:<span style="position: absolute; clip: rect(1px 1px 1px 1px); clip: rect(1px, 1px, 1px, 1px);">{{FULLPAGENAME}}</span>}}<br />
__NOTOC__<br />
<br />
<big><big>Division D - Construction Details</big></big><br />
<hr><br />
<big><big><big><big><big>TPO | Membrane Termination B (Wall) ([[TPO_Roof_Systems_Standard#10.3.2.3._General_Application_Requirements_for_Perimeters_and_Walls | Article 10.3.2.3.]])</big></big></big></big></big><br />
{{Template:Construction Details Header}}<br />
<div class="panel panel-success"><br />
<div class="panel-heading"><big>'''TPO Details'''</big></div><br />
<div class="panel-body"><br />
<div class="col-md-6"><br />
<div style="text-align:center; vertical-align:center"><br />
<br><br />
[[File:10.3.2.3.-TPO-B.png|class=img-responsive | link=https://rpm.rcabc.org/images/b/b6/10.3.2.3.-TPO-B.png]]<br />
:Drawing NTS<br />
</div><br />
</div><!-- COL-6-MD --><br />
<br />
<div class="col-md-6"><br />
=== WORK INCLUDED ===<br />
<br />
;(1) [[TPO Roof Systems Standard#PART_6|<big>Air/Vapour Control Layers</big>]]: <br />
:As specified by the ''Design Authority'' and installed to provide continuity for optimal control.<br />
;(2) [[TPO Roof Systems Standard#PART_7|<big>Insulation</big>]]:<br />
:Installed in keeping with Section 7.3. Multiple layering illustrated; layers must be offset and staggered at least 304.8 mm (12”) in each direction.<br />
;(3) [[TPO Roof Systems Standard#PART_8|<big>Insulation Overlay Panel</big>]]:<br />
:Required for fully adhered membrane systems or when overburden is specified. Panels must be offset and staggered from underlying insulation panels.<br />
;(4) [[TPO Roof Systems Standard#PART_9|<big>Field Membrane</big>]]:<br />
:See Table 9.2. for permissible application methods and corresponding membrane properties. Membrane must be installed according to the requirements in Section 9.3.<br />
;(5) [[TPO Roof Systems Standard#PART_10|<big>Edge Securement</big>]]:<br />
:Proprietary to the membrane manufacturer. Edge securement is required, irrespective of how the membrane is applied (i.e., adhered, self-adhered, mechanically fastened).<br />
;(6) [[TPO Roof Systems Standard#PART_10|<big>Mechanical Fastening</big>]]:<br />
:Edge securement must be anchored to the roof structure to prevent membrane movement.<br />
;(7) [[TPO Roof Systems Standard#PART_10|<big>Primer or Adhesive</big>]]:<br />
:Proprietary to the membrane manufacturer. Primer may be required for self-adhered membranes; adhesive is required for all other applications. All membranes applied to the vertical substrate must be fully adhered.<br />
;(8) [[TPO Roof Systems Standard#PART_10|<big>Membrane Flashing</big>]]:<br />
:May be run continuously up the vertical substrate from the field or installed as separate flashing (see membrane manufacturer requirements). Membrane shall be carried up the vertical substrate at least 203.2 mm (8”) above the ''finished roof system surface'', plus at least 76.2 mm (3”) for wall control layer overlap. In regions where heavy snow accumulation is possible, or to accommodate future roof membrane replacement, membrane should be carried at least 304.8 mm (12”) up the vertical substrate.<br />
;(9) [[TPO Roof Systems Standard#PART_10|<big>Membrane Edge Securement and Sealant</big>]]:<br />
:All membranes applied to a vertical surface must be mechanically fastened. Fastener illustrated, together with sealant applied to upper membrane edge.<br />
<br />
=== RELATED WORK BY OTHERS ===<br />
;(A) [[TPO Roof Systems Standard#PART_2|<big>Acceptable Deck</big>]]<br />
:Illustrated deck is representative. See Sub-section 2.1.5. for acceptable ''deck'' types and conditions.<br />
;(B) [[TPO Roof Systems Standard#PART_2|<big>Wall Structure</big>]]<br />
:Illustrated wall is representative. Wall control layers (i.e. water resistive barrier) must overlap ''roofing system'' to achieve ''continuity''. See Sub-section 2.1.7. for wall conditions.<br />
;(C) <big>Wall System Finish</big><br />
:Illustrated system is representative and shows water-resistive barrier overlapping roof membrane (See above, Item 8).<br />
<br />
</div><!-- COL-6-MD --><br />
</div><!-- PANEL BODY --><br />
</div><!-- PANEL --><br />
<br />
'''NOTE''': See the [[TPO Roof Systems Standard | '''TPO Roof Systems Standard''']] for additional requirements.<br />
<br />
<hr><br />
<br />
[[TPO Roof System Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''TPO Roof System Details'']]<br />
<br />
[[Main Page | <i class="fa fa-home fa"></i> Home]]<br />
<br />
{{Template:RPM Page Footer with Copyright and Current Date}}</div>James Klassenhttp://rpm.rcabc.org/index.php?title=Working_Page_8Working Page 82024-01-30T19:57:51Z<p>James Klassen: /* Liquid Membrane Flashing Systems */</p>
<hr />
<div><br />
__NOTOC__<br />
__NONUMBEREDHEADINGS__<br />
{{DISPLAYTITLE:<span style="position: absolute; clip: rect(1px 1px 1px 1px); clip: rect(1px, 1px, 1px, 1px);">{{FULLPAGENAME}}</span>}}<br />
<br />
<big><big>Division C - Accepted Materials</big></big><br />
<hr><br />
<big><big><big><big><big>IKO Industries Ltd.</big></big></big></big></big><br><br />
<big>Associate Member (Manufacturer)</big><br />
{| class="wikitable"<br />
|-<br />
| style="background-color:#FFFACD" | '''<big>Materials Listed by Category</big>'''<br />
<br><br />
The information published in the RCABC '''''Roofing Practices Manual''''' and offered below does NOT represent a complete set of the manufacturer’s data or specifications, nor is this material recommended or endorsed by the ''Guarantor''. The preparation of a detailed specification is the responsibility of the ''Design Authority''.<br />
|-<br />
|<br />
;:<br />
;Website: '''http://www.iko.com/comm/'''<br />
;Contact Address: See the current Membership list and contact information at [http://www.rcabc.org/members/find-a-member/ '''www.rcabc.org''']<br />
;Country of Origin: Canada<br />
;Country of Manufacture: Canada, U.S.A.<br />
;Year First Installed:<br />
:BC: <br />
:Canada: <br />
:Foreign: <br />
|}<br />
<br />
<div class="col-md-3"><br />
<big><big>'''Waterproofing Roofs'''</big></big><br />
<hr><br />
<br />
====Insulation====<br />
'''Polyisocyanurate Foam'''<br />
:[[Materials:IKOTherm III|IKOTherm III]]<br />
<br />
====Insulation Overlay Panels====<br />
'''Asphaltic Overlays'''<br />
:[[Materials:Protectoboard |Protectoboard]]<br />
<br />
'''High-density Insulation Overlays'''<br />
:[[Materials:IKOTherm Covershield|IKOTherm Covershield]]<br />
<br />
'''Composite and Membrane-laminated Overlays'''<br />
:[[Materials:Protectobase 180 |Protectobase 180]]<br />
:[[Materials:Protectobase 180 Sanded | {{hilite | Protectobase 180 Sanded || 2024-October-20 }}]]<br />
:[[Materials:Protectobase 95 |Protectobase 95]]<br />
:[[Materials:ShieldBase 180|ShieldBase 180]]<br />
<br />
====Bitumen (BUR)====<br />
:[[Materials:Modi-Melt SEBS (IKO)| Modi-Melt SEBS]]<br />
<br />
====Felts (BUR)====<br />
'''Organic Felts'''<br />
:[[Materials:No. 15 Perforated Asphalt Felt (IKO) |No. 15 Perforated Asphalt Felt]]<br />
<br />
'''Glass-fibre Felts'''<br />
:[[Materials:Type IV Glass Ply Sheet|Type IV Glass Ply Sheet]]<br />
:[[Materials:Type VI Glass Ply Sheet|Type VI Glass Ply Sheet]]<br />
<br />
====SBS Polymer-Modified Bituminous Membranes====<br />
(See the membrane tables in [https://rpm.rcabc.org/index.php?title=Materials_by_Product_Category Division C])<br />
<br />
'''Base Sheets'''<br />
:[[Materials:Armourbond Flash |Armourbond Flash]]<br />
:[[Materials:Armourbond Flash HD|Armourbond Flash HD]]<br />
:[[Materials:Armourbond 180|Armourbond 180]]<br />
:[[Materials:Armourbond Flash Sand HD|Armourbond Flash Sand HD]]<br />
:[[Materials:ArmourStick HD Base (IKO) | {{hilite | ArmourStick HD Base || 2022-February-5 }}]]<br />
:[[Materials:Armourvent Base |Armourvent Base]]<br />
:[[Materials:Fast-N-Stick-180 Base|Fast-N-Stick-180 Base]] (TA)<br />
:[[Materials:Fast-N-Stick HD Base|Fast-N-Stick HD Base]] (TA)<br />
:[[Materials:Modiflex HD-FS-Base|Modiflex HD-FS-Base]] (TA)<br />
:[[Materials:Modiflex HD-SS-Base|Modiflex HD-SS-Base]] (TA)<br />
:[[Materials:Modiflex MF-95 F/S|Modiflex MF-95 F/S]] (TA)<br />
:[[Materials:Modiflex MF-95 S/S|Modiflex MF-95 S/S]] (TA)<br />
:[[Materials:Modiflex MP-180 F/S 3 mm |Modiflex MP-180 F/S 3 mm ]]<br />
:[[Materials:Modiflex MP-180 F/S |Modiflex MP-180 F/S]]<br />
<br />
</div><br />
<div class="col-md-3"><br />
<big><big>'''Waterproofing Roofs'''</big></big><br />
<hr><br />
====SBS Polymer-Modified Bituminous Membranes (Cont.)====<br />
<br />
'''Base Sheets (Cont.)'''<br />
:[[Materials:Modiflex MP-180 SS 3 mm|Modiflex MP-180 S/S 3 mm]]<br />
:[[Materials:Modiflex MP-180 SS|Modiflex MP-180 SS]] (TA)<br />
:[[Materials:Torchflex HD-FF-Base |Torchflex HD-FF-Base]]<br />
:[[Materials:Torchflex TF-95 FF 2.2 mm|Torchflex TF-95 FF 2.2 mm]]<br />
:[[Materials:Torchflex TF-95 FF |Torchflex TF-95 FF]]<br />
:[[Materials:Torchflex TP-180 FF |Torchflex TP-180 FF]] (TA)<br />
:[[Materials:Torchflex TP-180 SF (3.0 mm) | {{hilite | Torchflex TP-180 SF (3.0 mm) || 2024-February-1 }}]]<br />
:[[Materials:Torchflex TP-250 FF|Torchflex TP-250 FF]]<br />
:[[Materials:Torchflex Ultra TP-HD-Base (IKO) | {{hilite | Torchflex Ultra TP-HD-Base || 2022-February-5 }}]]<br />
:[[Materials:Armourbridge/Pont|Armourbridge/Pont]]<br />
<br />
'''Cap Sheets'''<br />
:[[Materials:Armourcool Granular TP-HD Cap|Armourcool Granular TP-HD Cap]] (TA)<br />
:[[Materials:ArmourStick HD Cap (IKO) | {{hilite | ArmourStick HD Cap || 2022-February-5 }}]]<br />
:[[Materials:Modiflex MP-180 Cap|Modiflex MP-180 Cap]] (TA)<br />
:[[Materials:Modiflex MP-250 Cap|Modiflex MP-250 Cap]] (TA)<br />
:[[Materials:Modiflex MP-HD-Cap|Modiflex MP-HD-Cap]] (TA)<br />
:[[Materials:Torchflex TP-250 Cap 5|Torchflex TP-250 Cap 5mm]] (TA)<br />
:[[Materials:Torchflex TP-250 Cap|Torchflex TP-250 Cap]] (TA)<br />
:[[Materials:Torchflex TP-HD-Cap|Torchflex TP-HD-Cap]] (TA)<br />
:[[Materials:Torchflex Ultra TP-HD-Cap (IKO) | {{hilite | Torchflex Ultra TP-HD-Cap || 2022-February-5 }}]]<br />
:[[Materials:Prevent Armourcool HD Cap|Prevent Armourcool HD Cap]]<br />
:[[Materials:Prevent MP 180 Cap 3.5 mm|Prevent MP 180 Cap 3.5 mm]]<br />
:[[Materials:Prevent TP 180 Cap 4 mm |Prevent TP 180 Cap 4 mm]]<br />
:[[Materials:Prevent MP 250 Cap 4 mm|Prevent MP 250 Cap 4 mm]]<br />
:[[Materials:Prevent MP-HD-Cap|Prevent MP-HD-Cap]]<br />
:[[Materials:Prevent TP 250 Cap 4 mm|Prevent TP 250 Cap 4 mm]] (TA)<br />
:[[Materials:Prevent TP-HD-Cap|Prevent TP-HD-Cap]] (TA)<br />
:[[Materials:Prevent Premium TP 250 Cap 4 mm|Prevent Premium TP 250 Cap 4 mm]] (TA)<br />
:[[Materials:Armourtread|Armourtread]]<br />
:[[Materials:Carrara Armourcool HD|Carrara Armourcool HD]]<br />
<br />
====APP Polymer-Modified Bituminous Membranes====<br />
(See the membrane tables in [https://rpm.rcabc.org/index.php?title=Materials_by_Product_Category Division C])<br />
'''Base Sheets'''<br />
:[[Materials:Armourplast Classic|Armourplast Classic]] <small><small>(awaiting TDS)</small></small><br />
<br />
'''Cap Sheets'''<br />
:[[Materials:Armourplast Granular|Armourplast Granular]]<br />
<br />
====TPO Membranes====<br />
(See the membrane tables in [https://rpm.rcabc.org/index.php?title=Materials_by_Product_Category Division C])<br />
:[[Materials:Innovi TPO | {{hilite | Innovi TPO || 2024-June-15 }}]]<br />
<br />
====Liquid Membrane Flashing Systems====<br />
'''Two-Component Reinforced Liquid Membrane Flashing'''<br />
:[[Materials:Metatech Flashing | {{hilite | Metatech Flashing || 2025-January-31 }}]]<br />
:[[Materials:Metatech Field | {{hilite | Metatech Field || 2025-January-31 }}]]<br />
<br />
'''Single-component Liquid Membrane Flashing'''<br />
:[[Materials:MS Detail| MS Detail]]<br />
<br />
<br />
</div><br />
<div class="col-md-3"><br />
<big><big>'''Waterproofing at Grade'''</big></big><br />
<hr><br />
<br />
====SBS-Modified Bituminous Membranes====<br />
(See the membrane tables in [https://rpm.rcabc.org/index.php?title=Materials_by_Product_Category Division C])<br />
'''Base Sheets'''<br />
:[[Materials:Armourbridge/Pont|Armourbridge/Pont]]<br />
:[[Materials:Armourbond Flash|Armourbond Flash]]<br />
:[[Materials:Modiflex MP-180 F/S|Modiflex MP-180 F/S]]<br />
:[[Materials:Torchflex TF-95 FF |Torchflex TF-95 FF]]<br />
:[[Materials:Torchflex TP-180 FF |Torchflex TP-180 FF]]<br />
<br />
'''Cap Sheets'''<br />
:[[Materials:Torchflex TP-250 Cap|Torchflex TP-250 Cap]]<br />
<br />
</div><br />
<div class="col-md-3"><br />
<big><big>'''Water-shedding Roofs'''</big></big><br />
<hr><br />
<br />
====Underlayment/Eave Protection (Asphalt Shingles/Cedar/Tiles)====<br />
'''Mechanically Fastened Materials'''<br />
:[[Materials:Roofgard Cool Grey Underlayment|Roofgard Cool Grey Underlayment]]<br />
:[[Materials:SBS Deck Base 44|SBS Deck Base 44]]<br />
:[[Materials:Stormtite|Stormtite]]<br />
<br />
'''Self-adhered Materials'''<br />
:[[Materials:Stormshield Ice and Water Protector (IKO) | {{hilite | Stormshield Ice and Water Protector || 2022-February-5 }}]]<br />
:[[Materials:44 Stormshield Ice and Water Protector (IKO) | {{hilite | 44 Stormshield || 2022-February-5 }}]]<br />
:[[Materials:Armourgard Ice and Water Protector (IKO) | {{hilite | Armourgard Ice and Water Protector || 2022-February-5 }}]]<br />
<br />
====Underlayment/Eave Protection (ASM)====<br />
'''Self-adhered Materials'''<br />
:[[Materials:Stormshield Ice and Water Protector (IKO) | {{hilite | Stormshield Ice and Water Protector || 2022-February-5 }}]]<br />
:[[Materials:44 Stormshield Ice and Water Protector (IKO) | {{hilite | 44 Stormshield || 2022-February-5 }}]]<br />
:[[Materials:Armourgard Ice and Water Protector (IKO) | {{hilite | Armourgard Ice and Water Protector || 2022-February-5 }}]]<br />
<br />
====Asphalt Shingles====<br />
:[[Materials:Armourshake|Armourshake]]<br />
:[[Materials:Cambridge|{{hilite | Cambridge || 2022-March-4 }}]]<br />
:[[Materials:Nordic|Nordic]] <small>(formerly Cambridge IR)</small><br />
:[[Materials:Dynasty | Dynasty]]<br />
:[[Materials:RoofShake HW|RoofShake HW]]<br />
:[[Materials:Royal Estate|Royal Estate]]<br />
<br />
:[[Materials:Biltmore (CRC) | {{hilite | Biltmore|| 2022-March-4 }} (CRC-labeled)]]<br />
<br />
</div><br />
<br />
</div><br />
<div class="col-md-12"><br />
<br />
<hr><br />
<br />
[[Main Page | <i class="fa fa-home fa"></i> Home]]<br />
{{Tempate:RPM Page Footer with Copyright and Current Date}}<br />
</div></div>James Klassenhttp://rpm.rcabc.org/index.php?title=Working_Page_7Working Page 72024-01-30T19:57:15Z<p>James Klassen: </p>
<hr />
<div>__NOTOC__<br />
__NONUMBEREDHEADINGS__<br />
{{DISPLAYTITLE:<span style="position: absolute; clip: rect(1px 1px 1px 1px); clip: rect(1px, 1px, 1px, 1px);">{{FULLPAGENAME}}</span>}}<br />
<br />
<big><big>Division C - Accepted Materials</big></big><br />
<hr><br />
<big><big><big><big><big>VaproShield LLC</big></big></big></big></big><br><br />
<big>Associate Member (Manufacturer)</big><br />
{| class="wikitable"<br />
|-<br />
| style="background-color:#FFFACD" | '''<big>Materials Listed by Category</big>'''<br />
<br><br />
The information published in the RCABC '''''Roofing Practices Manual''''' and offered below does NOT represent a complete set of the manufacturer’s data or specifications, nor is this material recommended or endorsed by the ''Guarantor''. The preparation of a detailed specification is the responsibility of the ''Design Authority''.<br />
|-<br />
|<br />
;:<br />
;Website: '''https://vaproshield.com/'''<br />
;Contact Address: See the current Membership list and contact information at [http://www.rcabc.org/members/find-a-member/ '''www.rcabc.org''']<br />
;Country of Origin: <br />
;Country of Manufacture: <br />
;Year First Installed:<br />
:BC: <br />
:Canada: <br />
:Foreign: <br />
|}<br />
<br />
</div><br />
<div class="col-md-3"><br />
<big><big>'''Water-shedding Roofs'''</big></big><br />
<hr><br />
<br />
====Underlayment/Eave Protection (Asphalt Shingles/Cedar/Tiles)====<br />
:'''Self-adhered Materials'''<br />
:[[Materials:SlopeShield Plus Self-Adhered | SlopeShield Plus Self-Adhered]]<br />
<br />
:File Name | Product Name<br />
<br />
====Underlayment/Eave Protection (ASM)====<br />
:'''Self-adhered Materials'''<br />
:[[Materials:SlopeShield Plus Self-Adhered | SlopeShield Plus Self-Adhered]]<br />
<br />
====Separation Layer ("Slip sheet") (ASM)====<br />
:[[Materials:SlopeShield Plus Self-Adhered | SlopeShield Plus Self-Adhered]]<br />
<br />
</div><br />
<div class="col-md-12"><br />
<br />
<hr><br />
<br />
[[Main Page | <i class="fa fa-home fa"></i> Home]]<br />
{{Tempate:RPM Page Footer with Copyright and Current Date}}<br />
</div></div>James Klassenhttp://rpm.rcabc.org/index.php?title=Working_Page_6Working Page 62024-01-30T19:53:47Z<p>James Klassen: </p>
<hr />
<div>__NOTOC__<br />
__NONUMBEREDHEADINGS__<br />
{{DISPLAYTITLE:<span style="position: absolute; clip: rect(1px 1px 1px 1px); clip: rect(1px, 1px, 1px, 1px);">{{FULLPAGENAME}}</span>}}<br />
<br />
<big><big>Division C - Accepted Materials</big></big><br />
<hr><br />
<big><big><big><big><big>Duro-Last Holcim Solutions and Products</big></big></big></big></big><br><br />
<big>Associate Member (Manufacturer)</big><br />
{| class="wikitable"<br />
|-<br />
| style="background-color:#FFFACD" | '''<big>Materials Listed by Category</big>'''<br />
<br><br />
The information published in the RCABC '''''Roofing Practices Manual''''' and offered below does NOT represent a complete set of the manufacturer’s data or specifications, nor is this material recommended or endorsed by the ''Guarantor''. The preparation of a detailed specification is the responsibility of the ''Design Authority''.<br />
|-<br />
|<br />
;:<br />
;Website: '''https://duro-last.com/'''<br />
;Contact Address: See the current Membership list and contact information at [http://www.rcabc.org/members/find-a-member/ '''www.rcabc.org''']<br />
;Country of Origin: U.S.A.<br />
;Country of Manufacture: U.S.A.<br />
;Year First Installed: 1978<br />
:BC: 1991<br />
:Canada:<br />
:Foreign: <br />
|}<br />
<br />
<div class="col-md-3"><br />
<big><big>'''Waterproofing Roofs'''</big></big><br />
<hr><br />
====Insulation====<br />
:'''EPS Insulation'''<br />
:[[Materials:Duro-Guard EPS Type II | {{hilite | Duro-Guard EPS Type II || 2025-January-31 }}]]<br />
:[[Materials:Duro-Guard EPS Fiberglass Facer | {{hilite | Duro-Guard EPS Fiberglass Facer || 2025-January-31 }}]]<br />
<br />
:'''Polyisocyanurate Insulation'''<br />
:[[Materials:Duro-Guard ISO III CG | {{hilite | Duro-Guard ISO III CG || 2025-January-31 }}]]<br />
<br />
====Insulation Overlay Panels====<br />
:'''High-density Insulation Overlays'''<br />
:[[Materials:Duro-Guard ISO HD | {{hilite | Duro-Guard ISO HD || 2025-January-31 }}]]<br />
:[[Materials:Duro-Guard ISO HD Composite Coated | {{hilite | Duro-Guard ISO HD Composite Coated || 2025-January-31 }}]]<br />
:[[Materials:Duro-Guard ISO HD-MA | {{hilite | Duro-Guard ISO HD-MA || 2025-January-31 }}]]<br />
<br />
====PVC Membranes====<br />
(See the membrane tables in [https://rpm.rcabc.org/index.php?title=Materials_by_Product_Category Division C])<br />
:[[Materials:Duro-Last (DL) 50/60 PVC | {{hilite | Duro-Last (DL) 50/60 PVC || 2024-October-20 }} ]]<br />
:[[Materials:Duro-Fleece (DF) 50/60/80 PVC | {{hilite | Duro-Fleece (DF) 50/60/80 PVC || 2024-October-20 }} ]]<br />
:[[Materials:Duro-Tuff (DT) 50/60/80 PVC | {{hilite | Duro-Tuff (DT) 50/60/80 PVC || 2025-January-31 }}]]<br />
<br />
<br />
</div><br />
<div class="col-md-12"><br />
<br />
<hr><br />
<br />
[[Main Page | <i class="fa fa-home fa"></i> Home]]<br />
{{Tempate:RPM Page Footer with Copyright and Current Date}}<br />
</div></div>James Klassenhttp://rpm.rcabc.org/index.php?title=Working_Page_5Working Page 52024-01-30T19:52:35Z<p>James Klassen: /* APP Polymer-Modified Bituminous Membranes */</p>
<hr />
<div><br />
__NOTOC__<br />
__NONUMBEREDHEADINGS__<br />
{{DISPLAYTITLE:<span style="position: absolute; clip: rect(1px 1px 1px 1px); clip: rect(1px, 1px, 1px, 1px);">{{FULLPAGENAME}}</span>}}<br />
<br />
<big><big>Division C - Accepted Materials</big></big><br />
<hr><br />
<big><big><big><big><big>Polyglass USA, Inc.</big></big></big></big></big><br><br />
<big>Associate Member (Manufacturer)</big><br />
{| class="wikitable"<br />
|-<br />
| style="background-color:#FFFACD" | '''<big>Materials Listed by Category</big>'''<br />
<br><br />
The information published in the RCABC '''''Roofing Practices Manual''''' and offered below does NOT represent a complete set of the manufacturer’s data or specifications, nor is this material recommended or endorsed by the ''Guarantor''. The preparation of a detailed specification is the responsibility of the ''Design Authority''.<br />
|-<br />
|<br />
;:<br />
;Website: '''http://www.polyglass.com'''<br />
;Contact Address: See the current Membership list and contact information at [http://www.rcabc.org/members/find-a-member/ '''www.rcabc.org''']<br />
;Country of Origin: U.S.A.<br />
;Country of Manufacture: U.S.A.<br />
;Year First Installed:<br />
:BC: <br />
:Canada: <br />
:Foreign: <br />
|}<br />
<br />
<div class="col-md-3"><br />
<big><big>'''Waterproofing Roofs'''</big></big><br />
<hr><br />
<br />
====Insulation====<br />
:'''Polyisocyanurate Foam'''<br />
:[[Materials:Polytherm G | Polytherm G]] <small><small>awaiting TDS</small></small><br />
<br />
====Insulation Overlay Panels====<br />
:'''Asphaltic Overlays'''<br />
:[[Materials:Polyboard E | Polyboard E (4.5 and 6 mm)]] <small><small>awaiting TDS</small></small><br />
:[[Materials:Polyboard W | Polyboard W (4.5 mm)]] <small><small>awaiting TDS</small></small><br />
<br />
:'''Membrane-laminated Overlays'''<br />
:[[Materials:Polyboard 180 Combo | {{hilite | Polyboard 180 Combo (Base sheet, Overlay Board) || 2025-January-31 }}]]<br />
<br />
====SBS Polymer-Modified Bituminous Membranes====<br />
(See the membrane tables in [https://rpm.rcabc.org/index.php?title=Materials_by_Product_Category Division C])<br />
:'''Base Sheets'''<br />
:[[Materials:Elastoflex SA Base|Elastoflex SA Base]]<br />
:[[Materials:Elastoflex SA Base Plus | {{hilite | Elastoflex SA Base Plus || 2025-January-31 }}]]<br />
:[[Materials:Elasoflex SA Polar Base | {{hilite | Elasoflex SA Polar Base || 2025-January-31 }}]]<br />
:[[Materials:Elastoflex S6 2.2|Elastoflex S6 2.2 (S/S, P/S, P/P)]]<br />
:[[Materials:Elastoflex S6 2.5|Elastoflex S6 2.5 (S/S, P/S)]]<br />
:[[Materials:Elastoflex S6 3.0|Elastoflex S6 3.0 (P/P)]]<br />
:[[Materials:Elastoflex S6 HP | Elastoflex S6 HP]] <small><small>awaiting TDS</small></small><br />
:[[Materials:Elastoflex SA V Plus | Elastoflex SA V Plus]] <small><small>awaiting TDS</small></small><br />
:[[Materials:Elastoflex SA V Plus FR | Elastoflex SA V Plus FR]] <small><small>awaiting TDS</small></small><br />
:[[Materials:Elastoflex V|Elastoflex V]]<br />
:[[Materials:Elastoflex VP | {{hilite | Elastoflex VP || 2025-January-31 }}]]<br />
:[[Materials: Elastovent | Elastovent]] <small><small>awaiting TDS</small></small><br />
<br />
</div><br />
<div class="col-md-3"><br />
<big><big>'''Waterproofing Roofs'''</big></big><br />
<hr><br />
<br />
====SBS Polymer-Modified Bituminous Membranes (Cont.)====<br />
(See the membrane tables in [https://rpm.rcabc.org/index.php?title=Materials_by_Product_Category Division C])<br />
:'''Interplies'''<br />
:[[Materials:Elastoflex SA V|Elastoflex SA V]]<br />
:[[Materials:Elastoflex SA V FR|Elastoflex SA V FR]]<br />
<br />
:'''Cap Sheets'''<br />
:[[Materials:Elastoflex S6 G|Elastoflex S6 G]]<br />
:[[Materials:Elastoflex S6 G FR|Elastoflex S6 G FR]]<br />
:[[Materials:Elastoflex SA P|Elastoflex SA P]]<br />
:[[Materials:Elastoflex SA P FR|Elastoflex SA P FR]]<br />
:[[Materials:Elastoflex S6 G C HP (250)|Elastoflex S6 G C HP (250)]]<br />
:[[Materials:Elastoflex S6 G C HP FR (250)|Elastoflex S6 G C HP FR (250)]]<br />
:[[Materials:Elastoflex SA P Polar Cap | Elastoflex SA P Polar Cap]] <small><small>awaiting TDS</small></small><br />
:[[Materials:Elastoflex VP G HP | {{hilite | Elastoflex VP G HP || 2025-January-31 }}]]<br />
:[[Materials:Elastoshield TS G FR|Elastoshield TS G FR]]<br />
:[[Materials:Polyfresko G SBS|Polyfresko G SBS]]<br />
:[[Materials:Polyfresko G SBS FR|Polyfresko G SBS FR]]<br />
<br />
====APP Polymer-Modified Bituminous Membranes====<br />
:'''Base Sheets'''<br />
:[[Materials:Polyflex APP | {{hilite | Polyflex APP (Plastomeric) Membrane || 2025-January-31 }}]]<br />
<br />
:'''Cap Sheets'''<br />
:[[Materials:Polyflex G | {{hilite | Polyflex G APP (Plastomeric) Granulated Cap Sheet || 2025-January-31 }}]]<br />
<br />
====Liquid Membrane Flashing Systems====<br />
'''Two-Component Reinforced Liquid Membrane Flashing'''<br />
:[[Materials:Polyglass PMMA Flashing | {{hilite | Polyglass PMMA Flashing || 2025-January-31 }}]]<br />
<br />
'''Single-component Liquid Membrane Flashing'''<br />
:[[Materials:Polyflash 1C|Polyflash 1C]]<br />
<br />
</div><br />
<div class="col-md-3"><br />
<big><big>'''Water-shedding Roofs'''</big></big><br />
<hr><br />
====Underlayment/Eave Protection (Asphalt Shingles/Cedar/Tiles)====<br />
:'''Self-adhered Materials'''<br />
:[[Materials:Polystick IR-Xe|Polystick IR-Xe]]<br />
:[[Materials:Polystick MTS|Polystick MTS]]<br />
:[[Materials:Polystick TU Plus|Polystick TU Plus]]<br />
<br />
====Underlayment/Eave Protection (ASM)====<br />
:'''Self-adhered Materials'''<br />
:[[Materials:Polystick MTS|Polystick MTS]]<br />
<br />
</div><br />
<div class="col-md-12"><br />
<hr><br />
<br />
====Accessories====<br />
<br />
{| class="wikitable" | style="color: black; background-color: orange; border: orange; width: 100%;"<br />
| colspan="2" | An ''Accessory'' is a material that joins ''Primary'' or ''Secondary Materials'' together, or is connected to/with a ''Primary'' or ''Secondary material'', but does not by its nature (apart from its installation) directly affect the water or wind resistance of the ''Waterproofing'' or ''Water-shedding system''. An '''Accessory''' is not an Accepted Material and therefore the '''''RoofStar Guarantee''''' does not extend to cover any potential material or installation failure. Accessories are listed in the '''''Roofing Practices Manual''''' merely for reference to specifiers, designers and installers.<br />
|}<br />
<br />
<div class="col-md-12"><br />
<div class="col-md-3"><br />
:[[Materials:PG 350|PG 350]]<br />
<br />
</div><br />
<div class="col-md-3"><br />
:[[Accessories:PolySlope | PolySlope]]<br />
</div><br />
<br />
<div class="col-md-3"><br />
:'''Membranes'''<br />
:[[Accessories:Polyfresko G SA | Polyfresko G SA]]<br />
:[[Accessories:Polyfresko G FR | Polyfresko G FR]]<br />
:[[Accessories:Polyfresko G | Polyfresko G]]<br />
</div><br />
<br />
<div class="col-md-3"><br />
:'''Membranes'''<br />
:[[Accessories:Polyflex G FR | Polyflex G FR]]<br />
:[[Accessories:Polyflex G HP | Polyflex G HP]]<br />
</div><br />
<br />
</div><br />
<div class="col-md-12"><br />
<br />
<hr><br />
<br />
[[Main Page | <i class="fa fa-home fa"></i> Home]]<br />
{{Tempate:RPM Page Footer with Copyright and Current Date}}<br />
</div></div>James Klassenhttp://rpm.rcabc.org/index.php?title=Working_Page_4Working Page 42024-01-30T19:51:52Z<p>James Klassen: </p>
<hr />
<div>__NOTOC__<br />
__NONUMBEREDHEADINGS__<br />
{{DISPLAYTITLE:<span style="position: absolute; clip: rect(1px 1px 1px 1px); clip: rect(1px, 1px, 1px, 1px);">{{FULLPAGENAME}}</span>}}<br />
<br />
<big><big>Division C - Accepted Materials</big></big><br />
<hr><br />
<big><big><big><big><big>Ventilation Maximum Ltd.</big></big></big></big></big><br><br />
<big>Associate Member (Manufacturer)</big><br />
{| class="wikitable"<br />
|-<br />
| style="background-color:#FFFACD" | '''<big>Materials Listed by Category</big>'''<br />
<br><br />
The information published in the RCABC '''''Roofing Practices Manual''''' and offered below does NOT represent a complete set of the manufacturer’s data or specifications, nor is this material recommended or endorsed by the ''Guarantor''. The preparation of a detailed specification is the responsibility of the ''Design Authority''.<br />
|-<br />
|<br />
;:<br />
;Website: '''https://ventilation-maximum.com/en/'''<br />
;Contact Address: See the current Membership list and contact information at [http://www.rcabc.org/members/find-a-member/ '''www.rcabc.org''']<br />
;Country of Origin: Canada<br />
;Country of Manufacture: Canada<br />
;Year First Installed: <br />
:BC: 2003<br />
:Canada: 1983<br />
:Foreign: 2000<br />
|}<br />
<br />
<div class="col-md-3"><br />
<big><big>'''Waterproofing Roofs'''</big></big><br />
<hr><br />
<br />
====Roof Penetration Flashings====<br />
:'''Vents'''<br />
:[[Materials:VMAX-101 Flat Roof Ventilator | {{hilite | VMAX-101 Flat Roof Ventilator || 2025-January-31 }}]]<br />
:[[Materials:VMAX-201-MB Flat Roof Ventilator | {{hilite | VMAX-201-MB Flat Roof Ventilator || 2025-January-31 }}]]<br />
<br />
<br />
</div><br />
<div class="col-md-3"><br />
<big><big>'''Water-shedding Roofs'''</big></big><br />
<hr><br />
<br />
====Roof Penetration Flashings====<br />
:'''Vents'''<br />
:[[Materials:VMAX-301 Sloped Roof Ventilator | {{hilite | VMAX-301 Sloped Roof Ventilator || 2025-January-31 }}]]<br />
:[[Materials:VMAX-AT1-1224-L/S Sloped Roof Air Intake Louvers | {{hilite | VMAX-AT1-1224-L/S Sloped Roof Air Intake Louvers|| 2025-January-31 }}]]<br />
:[[Materials:VMAX-AT2-1224-L/S Sloped Roof Air Intake Louvers | {{hilite | VMAX-AT2-1224-L/S Sloped Roof Air Intake Louvers|| 2025-January-31 }}]]<br />
:[[Materials:VMAX-CATHEDRAL Roof System | {{hilite | VMAX-CATHEDRAL Roof System|| 2025-January-31 }}]]<br />
<br />
</div><br />
<div class="col-md-12"><br />
<br />
<hr><br />
<br />
[[Main Page | <i class="fa fa-home fa"></i> Home]]<br />
{{Tempate:RPM Page Footer with Copyright and Current Date}}<br />
</div></div>James Klassenhttp://rpm.rcabc.org/index.php?title=Working_Page_3Working Page 32024-01-30T19:50:48Z<p>James Klassen: /* Asphalt Shingles (Cont.) */</p>
<hr />
<div><br />
__NOTOC__<br />
__NONUMBEREDHEADINGS__<br />
{{DISPLAYTITLE:<span style="position: absolute; clip: rect(1px 1px 1px 1px); clip: rect(1px, 1px, 1px, 1px);">{{FULLPAGENAME}}</span>}}<br />
<br />
<big><big>Division C - Accepted Materials</big></big><br />
<hr><br />
<big><big><big><big><big>CertainTeed LLC</big></big></big></big></big><br><br />
<big>Associate Member (Manufacturer)</big><br />
{| class="wikitable"<br />
|-<br />
| style="background-color:#FFFACD" | '''<big>Materials Listed by Category</big>'''<br />
<br><br />
The information published in the RCABC '''''Roofing Practices Manual''''' and offered below does NOT represent a complete set of the manufacturer’s data or specifications, nor is this material recommended or endorsed by the ''Guarantor''. The preparation of a detailed specification is the responsibility of the ''Design Authority''.<br />
|-<br />
|<br />
;:<br />
;Website: '''http://www.certainteed.com'''<br />
;Contact Address: See the current Membership list and contact information at [http://www.rcabc.org/members/find-a-member/ '''www.rcabc.org''']<br />
;Country of Origin: U.S.A.<br />
;Country of Manufacture: U.S.A.<br />
;Year First Installed:<br />
:BC: <br />
:Canada: <br />
:Foreign: <br />
|}<br />
<br />
<div class="col-md-4"><br />
<big><big>'''Water-shedding Roofs'''</big></big><br />
<hr><br />
<br />
====Underlayment/Eave Protection (Asphalt Shingles/Cedar/Tiles)====<br />
:'''Mechanically Fastened Materials'''<br />
:[[Materials:DiamondDeck|DiamondDeck]]<br />
:[[Materials:Roofers Select|Roofers Select Underlayment]]<br />
:[[Materials:RoofRunner|RoofRunner Underlayment]]<br />
:[[Materials:RoofRunner AIR | {{hilite | RoofRunner AIR || 2024-June-15 }}]]<br />
<br />
:'''Self-adhered Materials'''<br />
:[[Materials:WinterGuard Sand|WinterGuard Sand]]<br />
:[[Materials:WinterGuard HT|WinterGuard HT]]<br />
:[[Materials:WinterGuard Granular |WinterGuard Granular]]<br />
<br />
====Underlayment/Eave Protection (ASM)====<br />
:'''Mechanically Fastened Materials'''<br />
:[[Materials:RoofRunner AIR | {{hilite | RoofRunner AIR || 2024-June-15 }}]]<br />
<br />
:'''Self-adhered Materials'''<br />
:[[Materials:DiamondDeck|DiamondDeck]]<br />
<br />
</div><br />
<div class="col-md-4"><br />
<big><big>'''Water-shedding Roofs'''</big></big><br />
<hr><br />
<br />
====Asphalt Shingles====<br />
:[[Materials:Carriage House|Carriage House]]<br />
:[[Materials:Grand Manor |Grand Manor]]<br />
:[[Materials:Highland Slate|Highland Slate]]<br />
:[[Materials:Independence AR|Independence AR]] <small><small>(awaiting TDS)</small></small><br />
:[[Materials:Landmark |Landmark]]<br />
:[[Materials:Landmark AR|Landmark AR]]<br />
:[[Materials:Landmark IR |Landmark IR]] <small><small>(awaiting TDS)</small></small><br />
:[[Materials:Landmark PREMIUM|Landmark PREMIUM]]<br />
:[[Materials:Landmark PREMIUM AR|Landmark PREMIUM AR]]<br />
:[[Materials:Landmark Pro / Architect 80|Landmark Pro / Architect 80]]<br />
:[[Materials:Landmark Pro / Architect 80 AR|Landmark Pro / Architect 80 AR]]<br />
<br />
</div><br />
<div class="col-md-4"><br />
<big><big>'''Water-shedding Roofs'''</big></big><br />
<hr><br />
<br />
====Asphalt Shingles (Cont.)====<br />
<br />
:[[Materials:Landmark Solaris Gold |Landmark Solaris Gold]] <small><small>(awaiting TDS)</small></small><br />
:[[Materials:Landmark Solaris Platinum|Landmark Solaris Platinum]] <small><small>(awaiting TDS)</small></small><br />
:[[Materials:Landmark TL |Landmark TL]]<br />
:[[Materials:Landmark TL AR |Landmark TL AR]]<br />
:[[Materials:Northgate SBS|Northgate SBS]]<br />
:[[Materials:Northgate ClimateFlex | {{hilite | Northgate ClimateFlex Polymer Modified || 2025-January-31 }}]]<br />
:[[Materials:Presidential Shake|Presidential Shake]]<br />
:[[Materials:Presidential Shake AR|Presidential Shake AR]]<br />
:[[Materials:Presidential Shake TL |Presidential Shake TL]]<br />
:[[Materials:Presidential Shake TL AR|Presidential Shake TL AR]]<br />
<br />
</div><br />
<br />
</div><br />
<div class="col-md-12"><br />
<br />
<hr><br />
<br />
[[Main Page | <i class="fa fa-home fa"></i> Home]]<br />
{{Tempate:RPM Page Footer with Copyright and Current Date}}<br />
</div></div>James Klassenhttp://rpm.rcabc.org/index.php?title=ASM_Panel_Page_Template_(for_Active_Members)ASM Panel Page Template (for Active Members)2023-10-26T15:21:54Z<p>James Klassen: /* SYSTEM DESCRIPTION */</p>
<hr />
<div>__NOTOC__<br />
__NONUMBEREDHEADINGS__<br />
{{DISPLAYTITLE:<span style="position: absolute; clip: rect(1px 1px 1px 1px); clip: rect(1px, 1px, 1px, 1px);">{{FULLPAGENAME}}</span>}}<br />
<br />
<big><big>Division C - Accepted Materials</big></big><br />
<hr><br />
<big><big><big><big><big>Panel Name</big></big></big></big></big><br><br />
<big><big><big>by Active Member Name</big></big></big><br><br />
{| class="wikitable"<br />
|-<br />
| style="background-color: #ffffcc; column-width:100%" | The metal panel listed and described below is accepted for use in the '''''RoofStar Guarantee Program'''''.<br />
|}<br />
{| class="wikitable"<br />
|-<br />
| <br />
;'''Manufacturer''': (Active Member Name here)<br />
;'''Contact Address''': See the current Membership list and contact information at [http://www.rcabc.org/members/find-a-member/ www.rcabc.org]<br />
;'''Product Group - Standing Seam Metal Roof System'''<br />
;'''Panel Machine''': Machine Name (Model number)<br />
;'''Panel Name''': Name<br />
;'''Seam Type''': Mechanical Lock/Snap-Lock/Flange-fastened<br />
<br />
The roofing assembly / material information published below and in the [http://{{SERVERNAME}}/index.php?title=Main_Page RCABC Roofing Practices Manual] DOES NOT represent a complete set of the manufacturer's published data, nor does it represent a detailed specification. The preparation of a detailed specification is the responsibility of the design authority. For more information about this product or system, consult the manufacturer.<br />
|}<br />
<br />
====OVERVIEW====<br />
(The following overview is boilerplate wording and can be modified to suit the specific panel description.<br />
The (panel name) metal panel is formed with an on-site/in shop continuous metal roofing panel roll forming machine (Machine name). This machine produces a standing seam panel with a seam height of XXX mm (XX") and profiles can vary from XXX mm (XX") wide up to XXX mm (XX") wide.<br />
<br />
On-site roll forming provides for the elimination of end laps with continuous panel forming capabilities in lengths up to XXX'.<br />
<br />
====SYSTEM DESCRIPTION====<br />
<ol><br />
<li>'''General''': The (panel name) metal panel is secured with concealed fastener.<br />
<li>'''Range of application''': Installed on wood or steel sloped roofs, in commercial, institutional, industrial and residential construction. For re-roofing or new construction.<br />
<li>'''Panel Attachment''': Fastening is site specific, engineer must confirm fixing specifications.<br />
<li>'''Fasteners (Screws)''': <br />
<ol><br />
<li>Fasteners used to attach panel clips to steel must be No. XX-XX by XX mm (X") long self-drilling, (screw type - i.e., self-tapping pancake head plated steel) screws. Use (i.e., two fasteners per panel clip), inserted into panel clip guide holes.<br />
<li>Fasteners used to attach panel clips to plywood must be No. XX-XX by XX mm (X") long (screw type - i.e., self-tapping pancake head plated steel) screws for wood. Use (i.e., two fasteners per panel clip), inserted into panel clip guide holes.<br />
</li></ol><br />
<li>'''Panel Clips''': One piece assembly XX mm (X") wide, XX mm (X") high, manufactured by (name of panel manufacturer) (or approved equal). Minimum thickness 0.022 in. (No. 22 MSG). Clips spaced maximum 600 mm (24") O.C., or as specified on engineered shop drawings (Ref. Standard for Architectural Sheet Metal (ASM) Roof Systems, [http://rpm.rcabc.org/index.php?title=ASM_Roof_Systems_Standard#3.1.3.3._Resistance_to_Specified_Wind_Loads Article 3.1.3.3.] and [http://rpm.rcabc.org/index.php?title=ASM_Roof_Systems_Standard#3.1.3.5._Submittals Article 3.1.3.5.]).<br />
<li>'''Deck Requirements''': in keeping with the [http://rpm.rcabc.org/index.php?title=Standard_for_Architectural_Sheet_Metal_(ASM)_Systems Standard for Architectural Sheet Metal (ASM) Systems].<br />
</li></ol><br />
<br />
====PROFILE====<br />
N/A<br />
<br />
====TECHNICAL DATA SHEET====<br />
N/A<br />
<br />
====SITE CONDITIONS====<br />
Minimum roof slope is 1:6 (2" in 12"). Severe conditions (heavy snow or ice) minimum slope is 1:1.5 (8" in 12").<br />
<br />
====PERFORMANCE REQUIREMENTS====<br />
<ol><br />
<li>'''Wind Uplift Resistance''': Panel securement shall conform to the requirements in [https://rpm.rcabc.org/index.php?title=ASM_Roof_Systems_Standard#PART_3 Part 3] of the [http://rpm.rcabc.org/index.php?title=Standard_for_Architectural_Sheet_Metal_(ASM)_Systems Standard for Architectural Sheet Metal (ASM) Systems].<br />
<li>'''Materials''':RoofStar (RGC) accepted metal panel systems shall be formed of steel conforming to the requirements published in [https://rpm.rcabc.org/index.php?title=ASM_Roof_Systems_Standard#Section_9.2._Materials Section 9.2.] of the Standard.<br />
</li></ol><br />
<br />
<hr><br />
<br />
<br />
[[Architectural Metal Roofing|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''Site-Formed Metal Roofing Systems'']]<br />
<br />
[[Materials by Product Type|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''Accepted Materials'']]<br />
<br />
<br />
[[Main Page|Home]]</div>James Klassenhttp://rpm.rcabc.org/index.php?title=Active_Member_Page_Template_(ASM)Active Member Page Template (ASM)2023-10-26T14:36:22Z<p>James Klassen: </p>
<hr />
<div>__NOTOC__<br />
__NONUMBEREDHEADINGS__<br />
{{DISPLAYTITLE:<span style="position: absolute; clip: rect(1px 1px 1px 1px); clip: rect(1px, 1px, 1px, 1px);">{{FULLPAGENAME}}</span>}}<br />
<br />
<big><big>Division C - Accepted Materials</big></big><br />
<hr><br />
<big><big><big><big><big>Active Member name</big></big></big></big></big><br><br />
<big>Active Member (Manufacturer of Roll-formed Metal Panels)</big><br />
{| class="wikitable"<br />
|-<br />
| style="background-color:#FFFACD" | '''<big>Roll-formed Architectural Sheet Metal panel systems</big>'''<br />
<br><br />
The listed below and published in the [https://rpm.rcabc.org/index.php?title=Architectural_Metal_Roofing table of foll-formed Architectural Sheet Metal panels] are accepted but are not recommended or endorsed by the ''Guarantor''. The preparation of a detailed specification is the responsibility of the ''Design Authority''.<br />
|-<br />
|<br />
;:<br />
;Website: '''[URL]'''<br />
;Contact Address: See the current Membership list and contact information at [http://www.rcabc.org/members/find-a-member/ '''www.rcabc.org''']<br />
<br />
|}<br />
<br />
<br />
Click on any of the products listed below for details and available profiles.<br />
<br />
<div class="col-md-4"><br />
:Panel page here<br />
</div><br />
<br />
<div class="col-md-4"><br />
:Panel page here<br />
</div><br />
<br />
<div class="col-md-4"><br />
:Panel page here<br />
</div><br />
<br />
</div><br />
<div class="col-md-12"><br />
<hr><br />
<br />
[[Division C: Accepted Materials |<i class="fa fa-chevron-circle-left" ></i> ''Accepted Materials'']]<br />
<br />
[[Main Page | <i class="fa fa-home fa"></i> Home]]<br />
{{Tempate:RPM Page Footer with Copyright and Current Date}}<br />
</div></div>James Klassen