Difference between revisions of "TPO Roof System Details"

Jump to: navigation, search

Difference between revisions of "TPO Roof System Details"

(31 intermediate revisions by the same user not shown)
Line 1: Line 1:
:[[TPO Details:D3.7.1 (Mechanically Attached Generic Conventional Assembly)|D3.7.1 Mechanically Attached Generic Conventional Assembly]]
+
:The drawings contained within this section are intended to represent a variety of thermoplastic roof system applications while remaining generic with regards to manufacturers’ specific application specifications. They do not represent all possible manufacturer application roof system designs. Consult manufacturers’ specifications and RoofStar Guarantee Standards to develop a system acceptable to both the manufacturer and the '''''RoofStar Guarantee Program'''''.
:[[TPO Details:D3.7.2 (Fully Adhered)|D3.7.2 Fully Adhered]]
 
:[[TPO Details:D3.7.3 (Ballasted Protected Membrane)|D3.7.3 Ballasted Protected Membrane]]
 
:[[TPO Details:D3.7.4 (Curb Opening)|D3.7.4 Curb Opening]]
 
:[[TPO Details:D3.7.5 (Clamping Copper Drain)|D3.7.5 Clamping Copper Drain]]
 
:[[TPO Details:D3.7.6 (Two-Part Box Flashing)|D3.7.6 Two-Part Box Flashing]]
 
:[[TPO Details:D3.7.7 (Mechanical Curb Opening)|D3.7.7 Mechanical Curb Opening]]
 
:[[TPO Details:D3.7.8 (Roof Edge)|D3.7.8 Roof Edge]]
 
  
:[[TPO Details:D3.7.1 Assemblies (Insulated Conventional)|D3.7.1 Assemblies (Insulated Conventional)]]
+
:For further information about thermoplastic (TPO and PVC) membrane system designs and requirements, see '''[[TPO/PVC (Thermoplastic Membranes) Roof Assemblies]]'''.
:[[TPO Details:D3.7.2 Assemblies (Protected Membrane)|D3.7.2 Assemblies (Protected Membrane)]]
 
:[[TPO Details:D3.7.3 Parapets & Copings (High - Wall Supported)|D3.7.3 Parapets & Copings (High - Wall Supported)]]
 
:[[TPO Details:D3.7.4 Parapets & Copings (Parapet - Wall Transition)|D3.7.4 Parapets & Copings (Parapet - Wall Transition)]]
 
:[[TPO Details:D3.7.5 Edges & Fascia (Cant Edge)|D3.7.5 Edges & Fascia (Cant Edge)]]
 
:[[TPO Details:D3.7.6 Edges & Fascia (Gravel Stop)|D3.7.6 Edges & Fascia (Gravel Stop)]]
 
:[[TPO Details:D3.7.7 Edges & Fascia (Flat Edge Termination)|D3.7.7 Edges & Fascia (Flat Edge Termination)]]
 
:[[TPO Details:D3.7.8 Counter-flashings & Reglets (Deck - Wall Supported)|D3.7.8 Counter-flashings & Reglets (Deck - Wall Supported)]]
 
:[[TPO Details:D3.7.9 Counter-flashings & Reglets (Deck - Unsupported by Wall)|D3.7.9 Counter-flashings & Reglets (Deck - Unsupported by Wall)]]
 
:[[TPO Details:D3.7.10 Counter-flashings & Reglets (Stucco Wall: Re-roofing)|D3.7.10 Counter-flashings & Reglets (Stucco Wall: Re-roofing)]]
 
:[[TPO Details:D3.7.11 Counter-flashings & Reglets (Stucco Wall: New)|D3.7.11 Counter-flashings & Reglets (Stucco Wall: New)]]
 
:[[TPO Details:D3.7.12 Counter-flashings & Reglets (Double Surface Reglet)|Details:D3.7.12 Counter-flashings & Reglets (Double Surface Reglet)]]
 
:[[TPO Details:D3.7.13 Counter-flashings & Reglets (Low Door Sill)|D3.7.13 Counter-flashings & Reglets (Low Door Sill)]]
 
:[[TPO Details:D3.7.14 Counter-flashings & Reglets (Window Curb)|D3.7.14 Counter-flashings & Reglets (Window Curb)]]
 
:[[TPO Details:D3.7.15 Roof-Wall Transitions (Expansion Joint)|D3.7.15 Roof-Wall Transitions (Expansion Joint)]]
 
:[[TPO Details:D3.7.16 Roof-Wall Transitions (Divider/Joint)|D3.7.16 Roof-Wall Transitions (Divider/Joint)]]
 
:[[TPO Details:D3.7.17 Roof-Wall Transitions (Fire Separation Joint)|D3.7.17 Roof-Wall Transitions (Fire Separation Joint)]]
 
:[[TPO Details:D3.7.18 Roof-Wall Transitions (Fire Separation Wall)|D3.7.18 Roof-Wall Transitions (Fire Separation Wall]]
 
:[[TPO Details:D3.7.19 Curbs & Sleepers (Equipment Sleeper)|D3.7.19 Curbs & Sleepers (Equipment Sleeper)]]
 
:[[TPO Details:D3.7.20 Curbs & Sleepers (Multiple Roof Penetrations)|D3.7.20 Curbs & Sleepers (Multiple Roof Penetrations)]]
 
:[[TPO Details:D3.7.21 Curbs & Sleepers (Basic Curb)|D3.7.21 Curbs & Sleepers (Basic Curb)]]
 
:[[TPO Details:D3.7.22 Curbs & Sleepers (Mechanical Opening)|D3.7.22 Curbs & Sleepers (Mechanical Opening)]]
 
:[[TPO Details:D3.7.23 Curbs & Sleepers (Pre-curb for Planters)|D3.7.23 Curbs & Sleepers (Pre-curb for Planters)]]
 
:[[TPO Details:D3.7.24 Strip-in Flashings (Metal Plumbing)|D3.7.24 Strip-in Flashings (Metal Plumbing)]]
 
:[[TPO Details:D3.7.25 Strip-in Flashings (Two-part Cable)|D3.7.25 Strip-in Flashings (Two-part Cable)]]
 
:[[TPO Details:D3.7.26 Strip-in Flashings (Gum Pan/Pitch Pocket)|D3.7.26 Strip-in Flashings (Gum Pan/Pitch Pocket)]]
 
:[[TPO Details:D3.7.27 Water & Drainage (Cast Iron Drain)|D3.7.27 Water & Drainage (Cast Iron Drain)]]
 
:[[TPO Details:D3.7.28 Water & Drainage (Spun Copper Drain)|D3.7.28 Water & Drainage (Spun Copper Drain)]]
 
:[[TPO Details:D3.7.29 Water & Drainage (Clamping Spun Copper Drain)|D3.7.29 Water & Drainage (Clamping Spun Copper Drain)]]
 
:[[TPO Details:D3.7.30 Water & Drainage (Open Wall Scupper)|D3.7.30 Water & Drainage (Open Wall Scupper)]]
 
:[[TPO Details:D3.7.31 Water & Drainage (Through-wall Scupper)|D3.7.31 Water & Drainage (Through-wall Scupper)]]
 
:[[TPO Details:D3.7.32 Miscellaneous Penetrations (Roof Anchor)|D3.7.32 Miscellaneous Penetrations (Roof Anchor)]]
 
:[[TPO Details:D3.7.33 Miscellaneous Penetrations (Wall Anchor - Conventional Roof Assy)|D3.7.33 Miscellaneous Penetrations (Wall Anchor - Conventional Roof Assy)]]
 
:[[TPO Details:D3.7.34 Miscellaneous Penetrations (Wall Anchor - Protected Roof Assy)|D3.7.34 Miscellaneous Penetrations (Wall Anchor - Protected Roof Assy)]]
 
  
 +
<div style="width:300px; text-align: left;">
 +
:[[File:TPO-PVC Link Drawing.jpg|300 px]]
 +
</div>
 +
<div class="col-md-12">
 +
<div style="width:40px; vertical-align: center; text-align: left;">
 +
[[File:Pdf.png|40 px]]
 +
</div>
 +
'''NOTE''': 'PDF' shown after a file name below indicates a downloadable print sheet is available for Construction Details.  Click on the detail link and look for the icon.
 +
</div>
 +
<div class="col-md-4">
 +
<hr>
 +
:[[TPO Details:D3.7.1-1 Assemblies (Insulated Conventional)|D3.7.1-1 Assemblies (Insulated Conventional)]]
 +
:[[TPO Details:D3.7.1-2 Assemblies (Ballasted Protected Membrane)|D3.7.1-2 Assemblies (Ballasted Protected Membrane)]]
 +
:[[TPO Details:D3.7.1-3 Assemblies (Fully Adhered)|D3.7.1-3 Assemblies (Fully Adhered)]]
  
 +
:[[TPO Details:D3.7.2-1 Parapets & Copings (High - Wall Supported)|D3.7.2-1 Parapets & Copings (High - Wall Supported)'''(Under Construction)''']]
 +
:[[TPO Details:D3.7.2-2 Parapets & Copings (Parapet - Wall Transition)|D3.7.2-2 Parapets & Copings (Parapet - Wall Transition)'''(Under Construction)''']]
  
[[Section:D. Application: Low Slope Roofs|<i class="fa fa-chevron-circle-left fa-2x" ></i> Back to ''TPO/PVC Application'']]
+
:[[TPO Details:D3.7.3-1 Edges & Fascia (Cant Edge)|D3.7.3-1 Edges & Fascia (Cant Edge)'''(Under Construction)''']]
 +
:[[TPO Details:D3.7.3-2 Edges & Fascia (Gravel Stop)|D3.7.3-2 Edges & Fascia (Gravel Stop)'''(Under Construction)''']]
 +
:[[TPO Details:D3.7.3-3 Edges & Fascia (Roof Edge)|D3.7.3-3 Edges & Fascia (Roof Edge)]]
  
[[Section:G. Construction Details|<i class="fa fa-chevron-circle-left fa-2x" ></i> Back to ''Construction Details'']]
+
:[[TPO Details:D3.7.4-1 Counter-flashings & Reglets (Deck - Wall Supported)|D3.7.4-1 Counter-flashings & Reglets (Deck - Wall Supported)'''(Under Construction''')]]
 +
:[[TPO Details:D3.7.4-2 Counter-flashings & Reglets (Deck - Unsupported by Wall)|D3.7.4-2 Counter-flashings & Reglets (Deck - Unsupported by Wall)'''(Under Construction)''']]
 +
:[[TPO Details:D3.7.4-3 Counter-flashings & Reglets (Stucco Wall: Re-roofing)|D3.7.4-3 Counter-flashings & Reglets (Stucco Wall: Re-roofing)'''(Under Construction)''']]
 +
:[[TPO Details:D3.7.4-4 Counter-flashings & Reglets (Stucco Wall: New)|D3.7.4-4 Counter-flashings & Reglets (Stucco Wall: New)'''(Under Construction''')]]
 +
:[[TPO Details:D3.7.4-5 Counter-flashings & Reglets (Double Surface Reglet)|D3.7.4-5 Counter-flashings & Reglets (Double Surface Reglet)'''(Under Construction)''']]
 +
:[[TPO Details:D3.7.4-6 Counter-flashings & Reglets (Low Door Sill)|D3.7.4-6 Counter-flashings & Reglets (Low Door Sill)'''(Under Construction)''']]
 +
:[[TPO Details:D3.7.4-7 Counter-flashings & Reglets (Window Curb)|D3.7.4-7 Counter-flashings & Reglets (Window Curb)'''(Under Construction''')]]
 +
</div>
 +
<div class="col-md-4">
 +
<hr>
 +
:[[TPO Details:D3.7.5-1 Roof-Wall Transitions (Expansion Joint)|D3.7.5-1 Roof-Wall Transitions (Expansion Joint)'''(Under Construction''')]]
 +
:[[TPO Details:D3.7.5-2 Roof-Wall Transitions (Divider/Joint)|D3.7.5-2 Roof-Wall Transitions (Divider/Joint)'''(Under Construction)''']]
 +
:[[TPO Details:D3.7.5-3 Roof-Wall Transitions (Fire Separation Joint)|D3.7.5-3 Roof-Wall Transitions (Fire Separation Joint)'''(Under Construction)''']]
 +
:[[TPO Details:D3.7.5-4 Roof-Wall Transitions (Fire Separation Wall)|D3.7.5-4 Roof-Wall Transitions (Fire Separation Wall)'''(Under Construction)''']]
 +
 
 +
:[[TPO Details:D3.7.6-1 Curbs & Sleepers (Equipment Sleeper)|D3.7.6-1 Curbs & Sleepers (Equipment Sleeper)'''(Under Construction)''']]
 +
:[[TPO Details:D3.7.6-2 Curbs & Sleepers (Multiple Roof Penetrations)|D3.7.6-2 Curbs & Sleepers (Multiple Roof Penetrations)'''(Under Construction''')]]
 +
:[[TPO Details:D3.7.6-3 Curbs & Sleepers (Basic Curb)|D3.7.6-3 Curbs & Sleepers (Basic Curb)]]
 +
:[[TPO Details:D3.7.6-4 Curbs & Sleepers (Mechanical Opening)|D3.7.6-4 Curbs & Sleepers (Mechanical Opening)]]
 +
 
 +
:[[TPO Details:D3.7.7-1 Strip-in Flashings (Metal Plumbing)|D3.7.7-1 Strip-in Flashings (Metal Plumbing)'''(Under Construction)''']]
 +
:[[TPO Details:D3.7.7-2 Strip-in Flashings (Two-part Cable)|D3.7.7-2 Strip-in Flashings (Two-part Cable)]]
 +
:[[TPO Details:D3.7.7-3 Strip-in Flashings (Pourable Sealer Pocket)|D3.7.7-3 Strip-in Flashings (Pourable Sealer  Pocket)'''(Under Construction)''']]
 +
</div>
 +
<div class="col-md-4">
 +
<hr>
 +
:[[TPO Details:D3.7.8-1 Water & Drainage (Cast Iron Drain)|D3.7.8-1 Water & Drainage (Cast Iron Drain)'''(Under Construction)''']]
 +
:[[TPO Details:D3.7.8-2 Water & Drainage (Spun Copper Drain)|D3.7.8-2 Water & Drainage (Spun Copper Drain)'''(Under Construction)''']]
 +
:[[TPO Details:D3.7.8-3 Water & Drainage (Clamping Spun Copper Drain)|D3.7.8-3 Water & Drainage (Clamping Spun Copper Drain)]]
 +
:[[TPO Details:D3.7.8-4 Water & Drainage (Open Wall Scupper)|D3.7.8-4 Water & Drainage (Open Wall Scupper)'''(Under Construction)''']]
 +
:[[TPO Details:D3.7.8-5 Water & Drainage (Through-wall Scupper)|D3.7.8-5 Water & Drainage (Through-wall Scupper)'''(Under Construction)''']]
 +
 
 +
:[[TPO Details:D3.7.9-1 Miscellaneous Penetrations (Roof Anchor)|D3.7.9-1 Miscellaneous Penetrations (Roof Anchor)'''(Under Construction)''']]
 +
:[[TPO Details:D3.7.9-2 Miscellaneous Penetrations (Wall Anchor - Conventional Roof Assy)|D3.7.9-2 Miscellaneous Penetrations (Wall Anchor - Conventional Roof Assy)'''(Under Construction)''']]
 +
:[[TPO Details:D2.7.9-3 Miscellaneous Penetrations (Wall Anchor - Protected Roof Assy)|D3.7.9-3 Miscellaneous Penetrations (Wall Anchor - Protected Roof Assy)'''(Under Construction)''']]
 +
</div>
 +
<div class="col-md-12">
 +
 
 +
 
 +
 
 +
[[TPO/PVC (Thermoplastic Membranes) Roof Assemblies|<i class="fa fa-chevron-circle-left" ></i> Back to ''TPO/PVC Roof Assemblies'']]
 +
 
 +
[[Construction Details|<i class="fa fa-chevron-circle-left" ></i> Back to ''Construction Details Section'']]
 +
</div>

Revision as of 16:51, 23 October 2017

The drawings contained within this section are intended to represent a variety of thermoplastic roof system applications while remaining generic with regards to manufacturers’ specific application specifications. They do not represent all possible manufacturer application roof system designs. Consult manufacturers’ specifications and RoofStar Guarantee Standards to develop a system acceptable to both the manufacturer and the RoofStar Guarantee Program.
For further information about thermoplastic (TPO and PVC) membrane system designs and requirements, see TPO/PVC (Thermoplastic Membranes) Roof Assemblies.
TPO-PVC Link Drawing.jpg

Pdf.png

NOTE: 'PDF' shown after a file name below indicates a downloadable print sheet is available for Construction Details. Click on the detail link and look for the icon.