Difference between revisions of "TPO Roof System Details"

Jump to: navigation, search

Difference between revisions of "TPO Roof System Details"

Line 1: Line 1:
 +
The drawings contained within this section are intended to represent a variety of modified bituminous roof system designs while remaining generic with regards to manufacturers’ specific application specifications. They do not represent all possible manufacturer application roof system designs. Consult manufacturers’ specifications and RoofStar Guarantee Standards to develop a system acceptable to both the manufacturer and RGC.
 +
 +
For further information about SBS membrane system designs, see '''[[TPO/PVC (Thermoplastic Membranes) Roof Systems]]'''.
 +
 +
 
:[[TPO Details:D3.7.1 (Mechanically Attached Generic Conventional Assembly)|D3.7.1 Mechanically Attached Generic Conventional Assembly]]
 
:[[TPO Details:D3.7.1 (Mechanically Attached Generic Conventional Assembly)|D3.7.1 Mechanically Attached Generic Conventional Assembly]]
 
:[[TPO Details:D3.7.2 (Fully Adhered)|D3.7.2 Fully Adhered]]
 
:[[TPO Details:D3.7.2 (Fully Adhered)|D3.7.2 Fully Adhered]]

Revision as of 20:27, 19 July 2016

The drawings contained within this section are intended to represent a variety of modified bituminous roof system designs while remaining generic with regards to manufacturers’ specific application specifications. They do not represent all possible manufacturer application roof system designs. Consult manufacturers’ specifications and RoofStar Guarantee Standards to develop a system acceptable to both the manufacturer and RGC.

For further information about SBS membrane system designs, see TPO/PVC (Thermoplastic Membranes) Roof Systems.


D3.7.1 Mechanically Attached Generic Conventional Assembly
D3.7.2 Fully Adhered
D3.7.3 Ballasted Protected Membrane
D3.7.4 Curb Opening
D3.7.5 Clamping Copper Drain
D3.7.6 Two-Part Box Flashing
D3.7.7 Mechanical Curb Opening
D3.7.8 Roof Edge

NOTE: The following pages are currently under construction
D3.7.1 Assemblies (Insulated Conventional)(Under Construction)
D3.7.2 Assemblies (Protected Membrane)(Under Construction)
D3.7.3 Parapets & Copings (High - Wall Supported)(Under Construction)
D3.7.4 Parapets & Copings (Parapet - Wall Transition)(Under Construction)
D3.7.5 Edges & Fascia (Cant Edge)(Under Construction)
D3.7.6 Edges & Fascia (Gravel Stop)(Under Construction)
D3.7.7 Edges & Fascia (Flat Edge Termination)(Under Construction)
D3.7.8 Counter-flashings & Reglets (Deck - Wall Supported)(Under Construction)
D3.7.9 Counter-flashings & Reglets (Deck - Unsupported by Wall)(Under Construction)
D3.7.10 Counter-flashings & Reglets (Stucco Wall: Re-roofing)(Under Construction)
D3.7.11 Counter-flashings & Reglets (Stucco Wall: New)(Under Construction)
D3.7.12 Counter-flashings & Reglets (Double Surface Reglet)(Under Construction)
D3.7.13 Counter-flashings & Reglets (Low Door Sill)(Under Construction)
D3.7.14 Counter-flashings & Reglets (Window Curb)(Under Construction)
D3.7.15 Roof-Wall Transitions (Expansion Joint)(Under Construction)
D3.7.16 Roof-Wall Transitions (Divider/Control Joint)(Under Construction)
D3.7.17 Roof-Wall Transitions (Fire Separation Joint)(Under Construction)
D3.7.18 Roof-Wall Transitions (Fire Separation Wall)(Under Construction)
D3.7.19 Curbs & Sleepers (Equipment Sleeper)(Under Construction)
D3.7.20 Curbs & Sleepers (Multiple Roof Penetrations)(Under Construction)
D3.7.21 Curbs & Sleepers (Basic Curb)(Under Construction)
D3.7.22 Curbs & Sleepers (Mechanical Opening)(Under Construction)
D3.7.23 Curbs & Sleepers (Pre-curb for Planters)(Under Construction)
D3.7.24 Strip-in Flashings (Metal Plumbing)(Under Construction)
D3.7.25 Strip-in Flashings (Two-part Cable)(Under Construction)
D3.7.26 Strip-in Flashings (Pourable Sealer Pocket)(Under Construction)
D3.7.27 Water & Drainage (Cast Iron Drain)(Under Construction)
D3.7.28 Water & Drainage (Spun Copper Drain)(Under Construction)
D3.7.29 Water & Drainage (Clamping Spun Copper Drain)(Under Construction)
D3.7.30 Water & Drainage (Open Wall Scupper)(Under Construction)
D3.7.31 Water & Drainage (Through-wall Scupper)(Under Construction)
D3.7.32 Miscellaneous Penetrations (Roof Anchor)(Under Construction)
D3.7.33 Miscellaneous Penetrations (Wall Anchor - Conventional Roof Assy)(Under Construction)
D3.7.34 Miscellaneous Penetrations (Wall Anchor - Protected Roof Assy)(Under Construction)



Back to TPO/PVC Roof Systems

Back to Construction Details Section