Difference between revisions of "TPO Details:D3.7.8-3 Water & Drainage (Clamping Spun Copper Drain)"
Difference between revisions of "TPO Details:D3.7.8-3 Water & Drainage (Clamping Spun Copper Drain)"
(Created page with "File:6.3.5.1.jpg === WORK INCLUDED === (1) <b>Gypsum Board:</b> Required when insulation is too thin to span flutes of steel decking (See <i>RGC</i> <i>Guarantee Stand...") |
|||
(7 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
− | [[File:6.3.5.1.jpg]] | + | {| class="wikitable" | style="color: black; background-color: orange; width: 100%;text-align:center" |
− | + | | colspan="2" | <big>'''''RoofStar Guarantee Standards''''' are <span style="color:#6495ed">'''blue-linked'''</span></big> | |
− | + | |} | |
+ | <div class="panel panel-success"> | ||
+ | <div class="panel-heading"><big>'''TPO/PVC Details'''</big></div> | ||
+ | <div class="panel-body"> | ||
+ | <div class="col-md-6"> | ||
+ | <div style="text-align:center; vertical-align:center"> | ||
+ | [[File:6.3.5.1.jpg|class=img-responsive]] | ||
+ | </div> | ||
+ | </div><!-- COL-MD-6 --> | ||
+ | <div class="col-md-6"> | ||
=== WORK INCLUDED === | === WORK INCLUDED === | ||
+ | ;1) [[RoofStar Guarantee Standards for TPO/PVC Roof Assemblies#TPOSUBSTRATES|'''Gypsum Deck Overlay''']]: May be required depending on insulation thickness or when required as a thermal barrier by design authority. | ||
+ | ;(2) [[RoofStar Guarantee Standards for TPO/PVC Roof Assemblies#TPOVAPOUR|'''Vapour Retarder''']]: If required by design authority. | ||
+ | ;(3) [[RoofStar Guarantee Standards for TPO/PVC Roof Assemblies#TPOINSULATION|'''Insulation''']]: Mechanically attached or loose laid for ballasted roof assemblies. Installed according to ''RoofStar Guarantee Standards''. See available insulation products in the [[Roof Deck Insulation|'''Accepted Materials''']] section of this Manual. | ||
+ | ;(4) [[RoofStar Guarantee Standards for TPO/PVC Roof Assemblies#TPOMEMBRANE|'''Single-ply Membrane''']]: Installed according to manufacturer’s instructions and RoofStar Guarantee Standards. | ||
+ | ;(5) '''Mastic''': Compatible mastic or sealant. | ||
+ | ;(6) [[RoofStar Guarantee Standards for TPO/PVC Roof Assemblies#TPOSTRIPPING|'''Membrane Flashing''']]: Adhered to curb according to manufacturer's printed specifications using proprietary adhesive. Must be carried to outside of parapet or minimum 200 mm (8") above finished roof surface. Thermoplastic membrane may be welded or chemically bonded. | ||
− | + | <hr> | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
=== RELATED WORK BY OTHERS === | === RELATED WORK BY OTHERS === | ||
+ | ;(A) [[RoofStar Guarantee Standards for TPO/PVC Roof Assemblies#TPODECKS|'''Acceptable Deck''']] | ||
+ | ;(B) [[RoofStar Guarantee Standards for TPO/PVC Roof Assemblies#TPORD|'''Roof Drain''']]: Mechanically fastened and coated with adhesive as required by manufacturer. Installed over compatible sealant. | ||
+ | </div><!-- COL-6-MD --> | ||
+ | </div><!-- PANEL BODY --> | ||
+ | </div><!-- PANEL --> | ||
− | + | '''NOTE''': Refer to '''''RoofStar Guarantee Standards''''' for additional requirements. | |
− | |||
− | |||
− | |||
− | NOTE: | ||
− | |||
* Leader size is determined by design authority using the calculation found in the BC Building Code at Appendix P.7.4.10 and Section 7.4.10.11 (Section 7.4.10.10 for gutters) in conjunction with the 15 minute rainfall value from the National Building Code, Appendix C. | * Leader size is determined by design authority using the calculation found in the BC Building Code at Appendix P.7.4.10 and Section 7.4.10.11 (Section 7.4.10.10 for gutters) in conjunction with the 15 minute rainfall value from the National Building Code, Appendix C. | ||
− | |||
<hr> | <hr> | ||
− | + | [[RoofStar Guarantee Standards for TPO/PVC Roof Assemblies|<i class="fa fa-chevron-circle-left fa" ></i> RoofStar Guarantee Standards for TPO/PVC Roof Assemblies]] | |
− | |||
− | [[ | ||
[[TPO, PVC (Thermoplastic Membranes) Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''TPO/PVC Construction Details'']] | [[TPO, PVC (Thermoplastic Membranes) Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''TPO/PVC Construction Details'']] | ||
− | [[ | + | [[Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''Construction Details'']] |
Latest revision as of 17:02, 23 October 2017
RoofStar Guarantee Standards are blue-linked |
TPO/PVC Details
1 WORK INCLUDED
- 1) Gypsum Deck Overlay
- May be required depending on insulation thickness or when required as a thermal barrier by design authority.
- (2) Vapour Retarder
- If required by design authority.
- (3) Insulation
- Mechanically attached or loose laid for ballasted roof assemblies. Installed according to RoofStar Guarantee Standards. See available insulation products in the Accepted Materials section of this Manual.
- (4) Single-ply Membrane
- Installed according to manufacturer’s instructions and RoofStar Guarantee Standards.
- (5) Mastic
- Compatible mastic or sealant.
- (6) Membrane Flashing
- Adhered to curb according to manufacturer's printed specifications using proprietary adhesive. Must be carried to outside of parapet or minimum 200 mm (8") above finished roof surface. Thermoplastic membrane may be welded or chemically bonded.
2 RELATED WORK BY OTHERS
- (A) Acceptable Deck
- (B) Roof Drain
- Mechanically fastened and coated with adhesive as required by manufacturer. Installed over compatible sealant.
NOTE: Refer to RoofStar Guarantee Standards for additional requirements.
- Leader size is determined by design authority using the calculation found in the BC Building Code at Appendix P.7.4.10 and Section 7.4.10.11 (Section 7.4.10.10 for gutters) in conjunction with the 15 minute rainfall value from the National Building Code, Appendix C.
RoofStar Guarantee Standards for TPO/PVC Roof Assemblies