Difference between revisions of "Hot Rubber Roof System Details"
Difference between revisions of "Hot Rubber Roof System Details"
| Line 24: | Line 24: | ||
<hr> | <hr> | ||
===Part 1 - General=== | ===Part 1 - General=== | ||
| − | ====='''Permitted Roof Systems''' ([[ | + | ====='''Permitted Roof Systems''' ([[Hot_Rubber_Roof_Systems_Standard#1.1.3.1._Permitted_Roof_Systems | Article 1.1.3.1.]])===== |
<ol> | <ol> | ||
<li>[[Hot Rubber Protected Roof Assembly (Typical) | Protected Roof Assembly (Typical)]] - Under construction | <li>[[Hot Rubber Protected Roof Assembly (Typical) | Protected Roof Assembly (Typical)]] - Under construction | ||
</li></ol> | </li></ol> | ||
| + | ===Part 10 - Perimeters and Walls=== | ||
| + | ====='''General Application''' ([[Hot_Rubber_Roof_Systems_Standard#10.3.2.3._General_Application_Requirements_for_Perimeters_and_Walls | Article 10.3.2.3.]])===== | ||
| + | <ol> | ||
| + | <li>[[Hot Rubber Membrane Termination A | Membrane Termination A]] - Under construction | ||
| + | <li>[[Hot Rubber Membrane Termination B | Membrane Termination B]] - Under construction | ||
| + | <li>[[Hot Rubber Membrane Termination C | Membrane Termination C]] - Under construction | ||
| + | <li>[[Hot Rubber Membrane Termination D | Membrane Termination D]] - Under construction | ||
| + | <li>[[Hot Rubber Membrane Termination E | Membrane Termination E]] - Under construction | ||
| + | <li>[[Hot Rubber Membrane Termination F | Membrane Termination F]] - Under construction | ||
| + | </li></ol> | ||
| + | |||
| + | ====='''Parapets''' ([[Hot_Rubber_Roof_Systems_Standard#10.3.4.1._Parapets | Article 10.3.4.1.]])===== | ||
| + | <ol> | ||
| + | <li>[[Hot Rubber Parapet (Typical)| Parapet (Typical)]] - Under construction | ||
| + | <li>[[Hot Rubber Parapet-Wall Connection | Parapet-Wall Connection]] - Under construction | ||
| + | </li></ol> | ||
| + | ====='''Fire Separations''' ([[Hot_Rubber_Roof_Systems_Standard#10.3.4.4._Fire_Separation_Walls | Article 10.3.4.4.]])===== | ||
| + | <ol> | ||
| + | <li>[[Hot Rubber Fire Separation Joint |Fire Separation Joint]] - Under construction | ||
| + | <li>[[Hot Rubber Fire Separation Wall | Fire Separation Wall]] - Under construction | ||
| + | </li></ol> | ||
</div> | </div> | ||
<div class="col-md-4"> | <div class="col-md-4"> | ||
<hr> | <hr> | ||
| − | ===Part 10 | + | ===Part 10 (Continued)=== |
| + | |||
| + | ====='''Doors, Windows, and Wall Openings''' ([[Hot_Rubber_Roof_Systems_Standard#10.3.4.5._Doors.2C_Windows.2C_and_Wall_Openings | Article 10.3.4.5.]])===== | ||
| + | <ol> | ||
| + | <li>[[Hot Rubber Low Door Opening | {{hilite | Low Door Opening || 2026-October-31 }}]] | ||
| + | <li>[[Hot Rubber Window Opening | Window Opening]] - Under construction | ||
| + | </li></ol> | ||
| + | ====='''Expansion Joints''' ([[Hot_Rubber_Roof_Systems_Standard#10.3.6.1._Expansion_Joints | Article 10.3.6.1.]])===== | ||
| + | <ol> | ||
| + | <li>[[Hot Rubber Expansion Joint (Wall) | Expansion Joint (Wall)]] - Under construction | ||
| + | <li>[[Hot Rubber Expansion Joint (Field)| Expansion Joint (Field)]] - Under construction | ||
| + | </li></ol> | ||
| + | |||
| + | ====='''Control Joints (Roof Dividers)''' ([[Hot_Rubber_Roof_Systems_Standard#10.3.6.2._Control_Joints_.28Roof_Dividers.29 | Article 10.3.6.2.]])===== | ||
| + | <ol> | ||
| + | <li>[[Hot Rubber Control Joint (Roof Divider)| Control Joint (Roof Divider)]] - Under construction | ||
| + | </li></ol> | ||
===Part 11 - Drainage=== | ===Part 11 - Drainage=== | ||
| + | |||
| + | ====='''Cast-iron Roof Drains''' ([[Hot_Rubber_Roof_Systems_Standard#11.3.3.2._General_Requirements_for_Cast-iron_Roof_Drains | Article 11.3.3.2.]])===== | ||
| + | <ol> | ||
| + | <li>[[Hot Rubber Cast Iron Drains| Cast Iron Drains]] - Under construction | ||
| + | </li></ol> | ||
| + | |||
| + | ====='''Flanged Insert-type Roof Drains''' ([[Hot_Rubber_Roof_Systems_Standard#11.3.3.6._Flanged_Insert-type_Roof_Drains | Article 11.3.3.6.]])===== | ||
| + | <ol> | ||
| + | <li>[[Hot Rubber Flanged Insert Drain| Flanged Insert Drain]] - Under construction | ||
| + | <li>[[Hot Rubber Flanged Insert Drain (Clamping Ring)| Flanged Insert Drain (Clamping Ring)]] - Under construction | ||
| + | </li></ol> | ||
| + | |||
| + | ====='''Scuppers and Overflows''' ([[Hot_Rubber_Roof_Systems_Standard#11.3.3.7._Scuppers_and_Overflows | Article 11.3.3.7.]])===== | ||
| + | <ol> | ||
| + | <li>[[Hot Rubber Open-wall Scupper Drain | Open-wall Scupper Drain ]] - Under construction | ||
| + | <li>[[Hot Rubber Through-wall Scupper Drain | Through-wall Scupper Drain ]] - Under construction | ||
| + | </li></ol> | ||
</div> | </div> | ||
| Line 44: | Line 98: | ||
===Part 12 - Penetrations and Curbs=== | ===Part 12 - Penetrations and Curbs=== | ||
| + | |||
| + | ====='''Flashing Penetrations''' ([[Hot_Rubber_Roof_Systems_Standard#12.3.2.1._General_Requirements_for_Flashing_Penetrations | Article 12.3.2.1.]])===== | ||
| + | <ol> | ||
| + | <li>[[Hot Rubber Plumbing Vent (Conventional Roof System)| {{hilite | Plumbing Vent (Conventional Roof System) || 2026-October-31 }}]] | ||
| + | <li>[[Hot Rubber Fall Protection Anchor in Roof | Fall Protection Anchor in Roof]] - Under construction | ||
| + | <li>[[Hot Rubber Fall Protection Anchor in Wall | Fall Protection Anchor in Wall]] - Under construction | ||
| + | <li>[[Hot Rubber Fall Protection Anchor in Wall (Protected) | Fall Protection Anchor in Wall (Protected Roof System)]] - Under construction | ||
| + | </li></ol> | ||
| + | |||
| + | ====='''Curbs, Sleepers, and Equipment Pads''' ([[Hot_Rubber_Roof_Systems_Standard#12.3.2.4._Curbs.2C_Sleepers.2C_and_Equipment_Pads | Article 12.3.2.4.]])===== | ||
| + | <ol> | ||
| + | <li>[[Hot Rubber Basic Curb| {{hilite | Basic Curb || 2021-February-7 }}]] - Under construction | ||
| + | <li>[[Hot Rubber for Multiple Penetrations| Curb for Multiple Penetrations]] - Under construction | ||
| + | <li>[[Hot Rubber Mechanical Equipment Curb| Mechanical Equipment Curb]] - Under construction | ||
| + | <li>[[Hot Rubber Equipment Sleeper | Equipment Sleeper]] - Under construction | ||
| + | </li></ol> | ||
| + | |||
| + | ====='''Railings, Ladders, and Other Attached Structures''' ([[Hot_Rubber_Roof_Systems_Standard#12.3.2.7._Railings.2C_Ladders.2C_and_Other_Attached_Structures | Article 12.3.2.7.]])===== | ||
| + | <ol> | ||
| + | <li>[[Hot Rubber Railing | Railing]] - Under construction | ||
| + | </li></ol> | ||
| + | |||
| + | ====='''Sealant Pockets''' ([[Hot_Rubber_Roof_Systems_Standard#12.3.2.8._Sealant_Pockets | Article 12.3.2.8.]])===== | ||
| + | <ol> | ||
| + | <li>[[Hot Rubber Sealant Pocket| Sealant Pocket]] - Under construction | ||
| + | </li></ol> | ||
===Part 13 - Linear Metal Flashing=== | ===Part 13 - Linear Metal Flashing=== | ||
Revision as of 16:42, 7 November 2025
- Division D - Construction Details
- Construction Details for 'Hot Rubber' Membrane Roof Systems
- The drawings linked on this page are intended to represent a variety of PVC Membrane roof system applications while remaining generic with regards to manufacturer's specific application specifications. They do not represent all possible manufacturer application roof system designs. Consult each manufacturer's specifications and the RoofStar Guarantee Standards to develop a system acceptable to both the manufacturer and the RoofStar Guarantee Program.
- For further information about PVC Membrane System designs and requirements, see the Standard for PVC Membrane Roof Systems.
Part 1 - General
Permitted Roof Systems ( Article 1.1.3.1.)
- Protected Roof Assembly (Typical) - Under construction
Part 10 - Perimeters and Walls
General Application ( Article 10.3.2.3.)
- Membrane Termination A - Under construction
- Membrane Termination B - Under construction
- Membrane Termination C - Under construction
- Membrane Termination D - Under construction
- Membrane Termination E - Under construction
- Membrane Termination F - Under construction
Parapets ( Article 10.3.4.1.)
- Parapet (Typical) - Under construction
- Parapet-Wall Connection - Under construction
Fire Separations ( Article 10.3.4.4.)
- Fire Separation Joint - Under construction
- Fire Separation Wall - Under construction
Part 10 (Continued)
Doors, Windows, and Wall Openings ( Article 10.3.4.5.)
- Low Door Opening
- Window Opening - Under construction
Expansion Joints ( Article 10.3.6.1.)
- Expansion Joint (Wall) - Under construction
- Expansion Joint (Field) - Under construction
Control Joints (Roof Dividers) ( Article 10.3.6.2.)
- Control Joint (Roof Divider) - Under construction
Part 11 - Drainage
Cast-iron Roof Drains ( Article 11.3.3.2.)
- Cast Iron Drains - Under construction
Flanged Insert-type Roof Drains ( Article 11.3.3.6.)
- Flanged Insert Drain - Under construction
- Flanged Insert Drain (Clamping Ring) - Under construction
Scuppers and Overflows ( Article 11.3.3.7.)
- Open-wall Scupper Drain - Under construction
- Through-wall Scupper Drain - Under construction
Part 12 - Penetrations and Curbs
Flashing Penetrations ( Article 12.3.2.1.)
- Plumbing Vent (Conventional Roof System)
- Fall Protection Anchor in Roof - Under construction
- Fall Protection Anchor in Wall - Under construction
- Fall Protection Anchor in Wall (Protected Roof System) - Under construction
Curbs, Sleepers, and Equipment Pads ( Article 12.3.2.4.)
- Basic Curb - Under construction
- Curb for Multiple Penetrations - Under construction
- Mechanical Equipment Curb - Under construction
- Equipment Sleeper - Under construction
Railings, Ladders, and Other Attached Structures ( Article 12.3.2.7.)
- Railing - Under construction
Sealant Pockets ( Article 12.3.2.8.)
- Sealant Pocket - Under construction
Part 13 - Linear Metal Flashing
- See the separate page, Construction Details for Linear Metal Flashings.
Part 14 - The Roof as a Platform
Standard for 'Hot Rubber' Membrane Roof Systems
© RCABC 2025
RoofStarTM is a registered Trademark of the RCABC.
No reproduction of this material, in whole or in part, is lawful without the expressed permission of the RCABC Guarantee Corp.
