Difference between revisions of "EPDM Roof System Details"
Difference between revisions of "EPDM Roof System Details"
(→Part 13 - Linear Metal Flashing) |
|||
| (6 intermediate revisions by the same user not shown) | |||
| Line 48: | Line 48: | ||
</li></ol> | </li></ol> | ||
| − | ====='''Parapets''' ([[ | + | ====='''Parapets''' ([[EPDM_Roof_Systems_Standard#10.3.4.1._Parapets | Article 10.3.4.1.]])===== |
<ol> | <ol> | ||
<li>[[EPDM Parapet (Typical)| Parapet (Typical)]] - Under construction | <li>[[EPDM Parapet (Typical)| Parapet (Typical)]] - Under construction | ||
| Line 56: | Line 56: | ||
</li></ol> | </li></ol> | ||
| − | ====='''Low-profile Edges''' ([[ | + | ====='''Low-profile Edges''' ([[EPDM_Roof_Systems_Standard#10.3.4.2._Low_Profile_Edges | Article 10.3.4.2.]])===== |
<ol> | <ol> | ||
| − | <li>[[EPDM Metal Edge Termination| {{hilite | Metal Edge Termination|| 2021-February-7 }}]] | + | <li>[[EPDM Metal Edge Termination| {{hilite | {{hilite | Metal Edge Termination|| 2021-February-7 }} || 2026-October-31 }}]] |
</li></ol> | </li></ol> | ||
| Line 75: | Line 75: | ||
====='''Doors, Windows, and Wall Openings''' ([[EPDM_Roof_Systems_Standard#10.3.4.5._Doors.2C_Windows.2C_and_Wall_Openings | Article 10.3.4.5.]])===== | ====='''Doors, Windows, and Wall Openings''' ([[EPDM_Roof_Systems_Standard#10.3.4.5._Doors.2C_Windows.2C_and_Wall_Openings | Article 10.3.4.5.]])===== | ||
<ol> | <ol> | ||
| − | <li>[[EPDM Low Door Opening | {{hilite | Low Door Opening || | + | <li>[[EPDM Low Door Opening | {{hilite | Low Door Opening || 2026-October-31 }}]] |
<li>[[EPDM Window Opening | Window Opening]] - Under construction | <li>[[EPDM Window Opening | Window Opening]] - Under construction | ||
</li></ol> | </li></ol> | ||
| Line 87: | Line 87: | ||
====='''Control Joints (Roof Dividers)''' ([[EPDM_Roof_Systems_Standard#10.3.6.2._Control_Joints_.28Roof_Dividers.29 | Article 10.3.6.2.]])===== | ====='''Control Joints (Roof Dividers)''' ([[EPDM_Roof_Systems_Standard#10.3.6.2._Control_Joints_.28Roof_Dividers.29 | Article 10.3.6.2.]])===== | ||
<ol> | <ol> | ||
| − | <li>[[EPDM Control Joint (Roof Divider)| Control Joint (Roof Divider)]] | + | <li>[[EPDM Control Joint (Roof Divider)| {{hilite | Control Joint (Roof Divider) || 2026-October-31 }}]] |
</li></ol> | </li></ol> | ||
| Line 116: | Line 116: | ||
====='''Flashing Penetrations''' ([[EPDM_Roof_Systems_Standard#12.3.2.1._General_Requirements_for_Flashing_Penetrations | Article 12.3.2.1.]])===== | ====='''Flashing Penetrations''' ([[EPDM_Roof_Systems_Standard#12.3.2.1._General_Requirements_for_Flashing_Penetrations | Article 12.3.2.1.]])===== | ||
<ol> | <ol> | ||
| − | <li>[[EPDM Plumbing Vent (Conventional Roof System)| Plumbing Vent (Conventional Roof System)]] | + | <li>[[EPDM Plumbing Vent (Conventional Roof System)| {{hilite | Plumbing Vent (Conventional Roof System) || 2026-October-31 }}]] |
<li>[[EPDM 2-Part Retrofit Flashing (Cable Penetration) | 2-Part Retrofit Flashing (Cable Penetration)]] - Under construction | <li>[[EPDM 2-Part Retrofit Flashing (Cable Penetration) | 2-Part Retrofit Flashing (Cable Penetration)]] - Under construction | ||
<li>[[EPDM Fall Protection Anchor in Roof | Fall Protection Anchor in Roof]] - Under construction | <li>[[EPDM Fall Protection Anchor in Roof | Fall Protection Anchor in Roof]] - Under construction | ||
| Line 136: | Line 136: | ||
</li></ol> | </li></ol> | ||
| − | ====='''Sealant Pockets''' ([[ | + | ====='''Sealant Pockets''' ([[EPDM_Roof_Systems_Standard#12.3.2.8._Sealant_Pockets | Article 12.3.2.8.]])===== |
<ol> | <ol> | ||
<li>[[EPDM Sealant Pocket| Sealant Pocket]] - Under construction | <li>[[EPDM Sealant Pocket| Sealant Pocket]] - Under construction | ||
| Line 142: | Line 142: | ||
===Part 13 - Linear Metal Flashing=== | ===Part 13 - Linear Metal Flashing=== | ||
| − | : | + | :[[LMF Metal Cap Flashing (joints) | Metal Cap Flashing (joints)]] |
| + | :[[LMF Metal Cap Flashing (inside corner) | Metal Cap Flashing (inside corner)]] | ||
| + | :[[LMF Metal Cap Flashing (Parapet-to-Wall Transition - Site Formed) | Metal Cap Flashing (Parapet-to-Wall Transition - Site Formed)]] | ||
| + | |||
| + | :[[EPDM Metal Butt Joint | {{hilite | Metal Butt Joint || 2026-October-31 }}]] | ||
| + | |||
| + | :'''NOTE''': The following pages are currently under construction | ||
| + | |||
| + | :[[LMF 13.3.1-4 Metal Cap Flashing (Parapet-to-Wall Transition - Shop-Formed) | Metal Cap Flashing (Parapet-to-Wall Transition - Shop-Formed)]] | ||
===Part 14 - The Roof as a Platform=== | ===Part 14 - The Roof as a Platform=== | ||
Latest revision as of 22:13, 12 November 2025
- Division D - Construction Details
- Construction Details for EPDM Membrane Roof Systems
- The drawings linked on this page are intended to represent a variety of EPDM Membrane roof system applications while remaining generic with regards to manufacturers’ specific application specifications. They do not represent all possible manufacturer application roof system designs. Consult each manufacturer's specifications and the RoofStar Guarantee Standards to develop a system acceptable to both the manufacturer and the RoofStar Guarantee Program.
- For further information about EPDM Membrane System designs and requirements, see the Standard for EPDM Membrane Roof Systems.
Part 1 - General
Permitted Roof Systems ( Article 1.1.3.1.)
- Conventionally Insulated System (Typical)
- Conventionally Insulated System (Alternate)
- Protected Roof Assembly (Typical)
Part 6 - Air and Vapour Controls
Continuity and Support ( Article 6.3.2.1.)
Part 10 - Perimeters and Walls
General Application ( Article 10.3.2.3.)
- Membrane Termination A
- Membrane Termination B
- Membrane Termination C
- Membrane Termination D
- Membrane Termination E
- Membrane Termination F
Parapets ( Article 10.3.4.1.)
- Parapet (Typical) - Under construction
- Parapet (Independent of Roof Structure) - Under construction
- Tall Parapet - Under construction
- Parapet-Wall Connection - Under construction
Low-profile Edges ( Article 10.3.4.2.)
Part 10 (continued)
Fire Separations ( Article 10.3.4.4.)
- Fire Separation Joint - Under construction
- Fire Separation Wall - Under construction
Doors, Windows, and Wall Openings ( Article 10.3.4.5.)
- Low Door Opening
- Window Opening - Under construction
Expansion Joints ( Article 10.3.6.1.)
- Expansion Joint (Wall) - Under construction
- Expansion Joint (Field) - Under construction
Control Joints (Roof Dividers) ( Article 10.3.6.2.)
Part 11 - Drainage
Cast-iron Roof Drains ( Article 11.3.3.2.)
- Cast Iron Drains - Under construction
Flanged Insert-type Roof Drains ( Article 11.3.3.6.)
- Flanged Insert Drain - Under construction
- Flanged Insert Drain (Clamping Ring) - Under construction
Scuppers and Overflows ( Article 11.3.3.7.)
- Open-wall Scupper Drain - Under construction
- Through-wall Scupper Drain - Under construction
Part 12 - Penetrations and Curbs
Flashing Penetrations ( Article 12.3.2.1.)
- Plumbing Vent (Conventional Roof System)
- 2-Part Retrofit Flashing (Cable Penetration) - Under construction
- Fall Protection Anchor in Roof - Under construction
- Fall Protection Anchor in Wall - Under construction
- Fall Protection Anchor in Wall (Protected Roof System) - Under construction
Curbs, Sleepers, and Equipment Pads ( Article 12.3.2.4.)
- Basic Curb - Under construction
- Curb for Multiple Penetrations - Under construction
- Mechanical Equipment Curb - Under construction
- Equipment Sleeper - Under construction
Railings, Ladders, and Other Attached Structures ( Article 12.3.2.7.)
- Railing - Under construction
Sealant Pockets ( Article 12.3.2.8.)
- Sealant Pocket - Under construction
Part 13 - Linear Metal Flashing
- Metal Cap Flashing (joints)
- Metal Cap Flashing (inside corner)
- Metal Cap Flashing (Parapet-to-Wall Transition - Site Formed)
- NOTE: The following pages are currently under construction
Part 14 - The Roof as a Platform
Standard for EPDM Membrane Roof Systems
© RCABC 2025
RoofStarTM is a registered Trademark of the RCABC.
No reproduction of this material, in whole or in part, is lawful without the expressed permission of the RCABC Guarantee Corp.
