Difference between revisions of "PVC Low Door Opening"

Jump to: navigation, search

Difference between revisions of "PVC Low Door Opening"

(Created page with "{{Template:RPM Info}} {{DISPLAYTITLE:<span style="position: absolute; clip: rect(1px 1px 1px 1px); clip: rect(1px, 1px, 1px, 1px);">{{FULLPAGENAME}}</span>}} __NOTOC__ <big>...")
 
 
(One intermediate revision by the same user not shown)
Line 6: Line 6:
 
<big><big>Division D - Construction Details</big></big>
 
<big><big>Division D - Construction Details</big></big>
 
<hr>
 
<hr>
<big><big><big><big><big>PVC | Low Door Opening</big></big></big></big></big>
+
<big><big><big><big><big>PVC | Low Door Opening ([[PVC_Roof_Systems_Standard#10.3.4.5._Doors.2C_Windows.2C_and_Wall_Openings | Article 10.3.4.5.]])</big></big></big></big></big>
 
{{Template:Construction Details Header}}
 
{{Template:Construction Details Header}}
 
<div class="panel panel-info">
 
<div class="panel panel-info">
Line 12: Line 12:
 
<div class="panel-body">
 
<div class="panel-body">
 
<div class="col-md-6">
 
<div class="col-md-6">
 +
<br>
 
<div style="text-align:center; vertical-align:center">
 
<div style="text-align:center; vertical-align:center">
<br>
+
[[File:Part 10 - Construction Detail - Low Door Opening - PVC.png|link=https://rpm.rcabc.org/images/1/17/Part_10_-_Construction_Detail_-_Low_Door_Opening_-_PVC.png |class=img-responsive]]
[[File:Illustration Unavailable (Filler Image).png |class=img-responsive | link=https://rpm.rcabc.org/images/6/6a/Illustration_Unavailable_%28Filler_Image%29.png]]
 
:Drawing NTS
 
 
</div>
 
</div>
</div><!-- COL-6-MD -->
+
</div><!-- COL-MD-6 -->
  
 
<div class="col-md-6">
 
<div class="col-md-6">
 
=== WORK INCLUDED ===
 
=== WORK INCLUDED ===
 +
;(1) [[PVC Roof Systems Standard#PART_1|'''Roof system''']]: Conventionally insulated system shown (refer to the membrane Standard for requirements).
 +
;(2) [[PVC Roof Systems Standard#PART_9|'''Field membrane''']]: PVC shown (see Part 9 for requirements)
 +
;(3) [[PVC Roof Systems Standard#PART_10|'''Self-adhered membrane (pre-flashing)''']]: Adhered.  Apply over rough sill or sill woodwork.  Prime as required.
 +
;(4) [[PVC Roof Systems Standard#PART_10|'''Metal water-stop flashing''']]: Dimensions as specified in design.  Mechanically attach to inside face of door sill.  Cut flashing to fit opening width.
 +
;(5) [[PVC Roof Systems Standard#PART_10|'''Membrane flashing (not shown)''']]: Optional, if field membrane stops at edge securement. Install to overlap and seal in metal water-stop flashing.
 +
;(6) [[PVC Roof Systems Standard#PART_10|'''Membrane corner reinforcement''']]: Install as required by the Standard and the ''manufacturer''.
 +
;(7) [[PVC Roof Systems Standard#PART_13|'''Metal base flashing (under door)''']]: Optional; protection for membrane when pavers are installed (shown), or when exposed membrane is vulnerable to damage.  Mechanical fasteners must be at least 87.5 mm (3-1/2”) above the drainage plane.
 +
;(8) [[PVC Roof Systems Standard#PART_10|'''Membrane flashing (not shown)''']]: Optional, if field membrane stops at edge securement. Applicable for exterior-insulated walls. Seals roof membrane flashing to air/vapour barrier on wall and provides sufficient exposure for positive union with WRB (by others). Mechanically secure membrane (metal base flashing used for securement in this detail).
 +
;(9) [[PVC Roof Systems Standard#PART_10|'''Metal base flashing (walls)''']]: Optional; protects membrane flashing from damage, and functions as removable panel to permit access to membrane flashing for future replacement.
 +
;(10) [[PVC Roof Systems Standard#PART_14|'''Pavers and pedestals''']]: May be installed by others, if specified.  See '''Part 14''' for material and application requirements.  Must be at least 12 mm (1/2”) away from other pavers, and from membrane flashing or metal base flashing, to permit adequate drainage.
  
;This Page is under construction.
+
<hr>
  
 
=== RELATED WORK BY OTHERS ===
 
=== RELATED WORK BY OTHERS ===
;This Page is under construction
+
;(A) '''Wall and cladding''': Generic and representative only.
 
+
;(B) '''WRB (Water Resistive Barrier)''': Generic and representative only.
 +
;(C) '''Door and jamb assembly''': Generic and representative only.
 
</div><!-- COL-6-MD -->
 
</div><!-- COL-6-MD -->
 
</div><!-- PANEL BODY -->
 
</div><!-- PANEL BODY -->
 
</div><!-- PANEL -->
 
</div><!-- PANEL -->
  
'''NOTE''': See the [[PVC Roof Systems Standard | '''PVC Roof Systems Standard''']] for additional requirements.
+
'''NOTE''': See the [[PVC Roof Systems Standard | '''Standard''']] for additional requirements.
  
 
<hr>
 
<hr>
Line 37: Line 47:
 
[[PVC Roof System Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''PVC Roof System Details'']]
 
[[PVC Roof System Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''PVC Roof System Details'']]
  
[[RCABC Roofing Practices Manual | <i class="fa fa-home fa"></i> Home]]
+
[[RCABC Roofing Practices Manual| <i class="fa fa-home fa"></i> Home]]
  
 
{{Template:RPM Page Footer with Copyright and Current Date}}
 
{{Template:RPM Page Footer with Copyright and Current Date}}

Latest revision as of 16:24, 7 November 2025



Division D - Construction Details


PVC | Low Door Opening ( Article 10.3.4.5.)

Notice to Reader
Images used in a Construction Detail are representative and not prescriptive, and are not necessarily drawn to scale. They are intended to support the related Standard (Ref. Division A, Article 2.2.1.2.).

The reader may link to the related Article in the detail title, or link to the Standard as it relates to a specific element in the detail. All hyperlinks are displayed blue text.

PVC Details


Part 10 - Construction Detail - Low Door Opening - PVC.png

1 WORK INCLUDED

(1) Roof system
Conventionally insulated system shown (refer to the membrane Standard for requirements).
(2) Field membrane
PVC shown (see Part 9 for requirements)
(3) Self-adhered membrane (pre-flashing)
Adhered. Apply over rough sill or sill woodwork. Prime as required.
(4) Metal water-stop flashing
Dimensions as specified in design. Mechanically attach to inside face of door sill. Cut flashing to fit opening width.
(5) Membrane flashing (not shown)
Optional, if field membrane stops at edge securement. Install to overlap and seal in metal water-stop flashing.
(6) Membrane corner reinforcement
Install as required by the Standard and the manufacturer.
(7) Metal base flashing (under door)
Optional; protection for membrane when pavers are installed (shown), or when exposed membrane is vulnerable to damage. Mechanical fasteners must be at least 87.5 mm (3-1/2”) above the drainage plane.
(8) Membrane flashing (not shown)
Optional, if field membrane stops at edge securement. Applicable for exterior-insulated walls. Seals roof membrane flashing to air/vapour barrier on wall and provides sufficient exposure for positive union with WRB (by others). Mechanically secure membrane (metal base flashing used for securement in this detail).
(9) Metal base flashing (walls)
Optional; protects membrane flashing from damage, and functions as removable panel to permit access to membrane flashing for future replacement.
(10) Pavers and pedestals
May be installed by others, if specified. See Part 14 for material and application requirements. Must be at least 12 mm (1/2”) away from other pavers, and from membrane flashing or metal base flashing, to permit adequate drainage.

2 RELATED WORK BY OTHERS

(A) Wall and cladding
Generic and representative only.
(B) WRB (Water Resistive Barrier)
Generic and representative only.
(C) Door and jamb assembly
Generic and representative only.

NOTE: See the Standard for additional requirements.


Back to PVC Roof System Details

Home

© RCABC 2025
RoofStarTM is a registered Trademark of the RCABC.
No reproduction of this material, in whole or in part, is lawful without the expressed permission of the RCABC Guarantee Corp.