Difference between revisions of "EPDM Roof System Details"

Jump to: navigation, search

Difference between revisions of "EPDM Roof System Details"

(Part 12 - Penetrations and Curbs)
(Part 13 - Linear Metal Flashing)
 
(4 intermediate revisions by the same user not shown)
Line 48: Line 48:
 
</li></ol>
 
</li></ol>
  
====='''Parapets''' ([[SBS_Roof_Systems_Standard#10.3.4.1._Parapets | Article 10.3.4.1.]])=====
+
====='''Parapets''' ([[EPDM_Roof_Systems_Standard#10.3.4.1._Parapets | Article 10.3.4.1.]])=====
 
<ol>
 
<ol>
 
<li>[[EPDM Parapet (Typical)| Parapet (Typical)]] - Under construction
 
<li>[[EPDM Parapet (Typical)| Parapet (Typical)]] - Under construction
Line 56: Line 56:
 
</li></ol>
 
</li></ol>
  
====='''Low-profile Edges''' ([[SBS_Roof_Systems_Standard#10.3.4.2._Low_Profile_Edges | Article 10.3.4.2.]])=====
+
====='''Low-profile Edges''' ([[EPDM_Roof_Systems_Standard#10.3.4.2._Low_Profile_Edges | Article 10.3.4.2.]])=====
 
<ol>
 
<ol>
 
<li>[[EPDM Metal Edge Termination| {{hilite | {{hilite | Metal Edge Termination|| 2021-February-7 }} || 2026-October-31 }}]]
 
<li>[[EPDM Metal Edge Termination| {{hilite | {{hilite | Metal Edge Termination|| 2021-February-7 }} || 2026-October-31 }}]]
Line 75: Line 75:
 
====='''Doors, Windows, and Wall Openings''' ([[EPDM_Roof_Systems_Standard#10.3.4.5._Doors.2C_Windows.2C_and_Wall_Openings | Article 10.3.4.5.]])=====
 
====='''Doors, Windows, and Wall Openings''' ([[EPDM_Roof_Systems_Standard#10.3.4.5._Doors.2C_Windows.2C_and_Wall_Openings | Article 10.3.4.5.]])=====
 
<ol>
 
<ol>
<li>[[EPDM Low Door Opening | {{hilite | Low Door Opening || 2022-February-5 }}]] - Under construction
+
<li>[[EPDM Low Door Opening | {{hilite | Low Door Opening || 2026-October-31 }}]]
 
<li>[[EPDM Window Opening | Window Opening]] - Under construction
 
<li>[[EPDM Window Opening | Window Opening]] - Under construction
 
</li></ol>
 
</li></ol>
Line 87: Line 87:
 
====='''Control Joints (Roof Dividers)''' ([[EPDM_Roof_Systems_Standard#10.3.6.2._Control_Joints_.28Roof_Dividers.29 | Article 10.3.6.2.]])=====
 
====='''Control Joints (Roof Dividers)''' ([[EPDM_Roof_Systems_Standard#10.3.6.2._Control_Joints_.28Roof_Dividers.29 | Article 10.3.6.2.]])=====
 
<ol>
 
<ol>
<li>[[EPDM Control Joint (Roof Divider)| Control Joint (Roof Divider)]] - Under construction
+
<li>[[EPDM Control Joint (Roof Divider)| {{hilite | Control Joint (Roof Divider) || 2026-October-31 }}]]
 
</li></ol>
 
</li></ol>
  
Line 136: Line 136:
 
</li></ol>
 
</li></ol>
  
====='''Sealant Pockets''' ([[SBS_Roof_Systems_Standard#12.3.2.8._Sealant_Pockets | Article 12.3.2.8.]])=====
+
====='''Sealant Pockets''' ([[EPDM_Roof_Systems_Standard#12.3.2.8._Sealant_Pockets | Article 12.3.2.8.]])=====
 
<ol>
 
<ol>
 
<li>[[EPDM Sealant Pocket| Sealant Pocket]] - Under construction
 
<li>[[EPDM Sealant Pocket| Sealant Pocket]] - Under construction
Line 142: Line 142:
  
 
===Part 13 - Linear Metal Flashing===
 
===Part 13 - Linear Metal Flashing===
:See the separate page, [[Linear_Metal_Flashing_Details | Construction Details for Linear Metal Flashings]]
+
:[[LMF Metal Cap Flashing (joints) | Metal Cap Flashing (joints)]]
 +
:[[LMF Metal Cap Flashing (inside corner) | Metal Cap Flashing (inside corner)]]
 +
:[[LMF Metal Cap Flashing (Parapet-to-Wall Transition - Site Formed) | Metal Cap Flashing (Parapet-to-Wall Transition - Site Formed)]]
 +
 
 +
:[[EPDM Metal Butt Joint | {{hilite | Metal Butt Joint || 2026-October-31 }}]]
 +
 
 +
:'''NOTE''': The following pages are currently under construction
 +
 
 +
:[[LMF 13.3.1-4 Metal Cap Flashing (Parapet-to-Wall Transition - Shop-Formed) | Metal Cap Flashing (Parapet-to-Wall Transition - Shop-Formed)]]
  
 
===Part 14 - The Roof as a Platform===
 
===Part 14 - The Roof as a Platform===

Latest revision as of 22:13, 12 November 2025



Division D - Construction Details

Construction Details for EPDM Membrane Roof Systems
EPDM Roof Systems.jpg
The drawings linked on this page are intended to represent a variety of EPDM Membrane roof system applications while remaining generic with regards to manufacturers’ specific application specifications. They do not represent all possible manufacturer application roof system designs. Consult each manufacturer's specifications and the RoofStar Guarantee Standards to develop a system acceptable to both the manufacturer and the RoofStar Guarantee Program.
For further information about EPDM Membrane System designs and requirements, see the Standard for EPDM Membrane Roof Systems.

Part 10 (continued)

Fire Separations ( Article 10.3.4.4.)
  1. Fire Separation Joint - Under construction
  2. Fire Separation Wall - Under construction
Doors, Windows, and Wall Openings ( Article 10.3.4.5.)
  1. Low Door Opening
  2. Window Opening - Under construction
Expansion Joints ( Article 10.3.6.1.)
  1. Expansion Joint (Wall) - Under construction
  2. Expansion Joint (Field) - Under construction
Control Joints (Roof Dividers) ( Article 10.3.6.2.)
  1. Control Joint (Roof Divider)

Part 11 - Drainage

Cast-iron Roof Drains ( Article 11.3.3.2.)
  1. Cast Iron Drains - Under construction
Flanged Insert-type Roof Drains ( Article 11.3.3.6.)
  1. Flanged Insert Drain - Under construction
  2. Flanged Insert Drain (Clamping Ring) - Under construction
Scuppers and Overflows ( Article 11.3.3.7.)
  1. Open-wall Scupper Drain - Under construction
  2. Through-wall Scupper Drain - Under construction

Part 12 - Penetrations and Curbs

Flashing Penetrations ( Article 12.3.2.1.)
  1. Plumbing Vent (Conventional Roof System)
  2. 2-Part Retrofit Flashing (Cable Penetration) - Under construction
  3. Fall Protection Anchor in Roof - Under construction
  4. Fall Protection Anchor in Wall - Under construction
  5. Fall Protection Anchor in Wall (Protected Roof System) - Under construction
Curbs, Sleepers, and Equipment Pads ( Article 12.3.2.4.)
  1. Basic Curb - Under construction
  2. Curb for Multiple Penetrations - Under construction
  3. Mechanical Equipment Curb - Under construction
  4. Equipment Sleeper - Under construction
Railings, Ladders, and Other Attached Structures ( Article 12.3.2.7.)
  1. Railing - Under construction
Sealant Pockets ( Article 12.3.2.8.)
  1. Sealant Pocket - Under construction

Part 13 - Linear Metal Flashing

Metal Cap Flashing (joints)
Metal Cap Flashing (inside corner)
Metal Cap Flashing (Parapet-to-Wall Transition - Site Formed)
Metal Butt Joint
NOTE: The following pages are currently under construction
Metal Cap Flashing (Parapet-to-Wall Transition - Shop-Formed)

Part 14 - The Roof as a Platform


Standard for EPDM Membrane Roof Systems

Home

© RCABC 2025
RoofStarTM is a registered Trademark of the RCABC.
No reproduction of this material, in whole or in part, is lawful without the expressed permission of the RCABC Guarantee Corp.