Difference between revisions of "EPDM Roof System Details"
Difference between revisions of "EPDM Roof System Details"
(→Doors, Windows, and Wall Openings ( Article 10.3.4.5.)) |
|||
| (39 intermediate revisions by the same user not shown) | |||
| Line 1: | Line 1: | ||
| − | + | {{Template:RPM Info}} | |
| − | + | __NONUMBEREDHEADINGS__ | |
| + | {{DISPLAYTITLE:<span style="position: absolute; clip: rect(1px 1px 1px 1px); clip: rect(1px, 1px, 1px, 1px);">{{FULLPAGENAME}}</span>}} | ||
| + | __NOTOC__ | ||
| − | < | + | :<big><big>Division D - Construction Details</big></big> |
| − | : | + | :<hr> |
| − | : | + | :<big><big><big><big><big>Construction Details for EPDM Membrane Roof Systems</big></big></big></big></big> |
| − | |||
| − | + | <div class="col-md-2"> | |
| − | :[[ | + | :[[File:EPDM_Roof_Systems.jpg| link=http://rpm.rcabc.org/images/f/fe/EPDM_Roof_Systems.jpg | 175 px]] |
| + | </div> | ||
| − | : | + | <div class="col-md-10"> |
| − | :[ | + | :The drawings linked on this page are intended to represent a variety of EPDM Membrane roof system applications while remaining generic with regards to manufacturers’ specific application specifications. They do not represent all possible ''manufacturer'' application roof system designs. Consult each ''manufacturer's'' specifications and the '''''RoofStar Guarantee Standards''''' to develop a system acceptable to both the manufacturer and the '''''RoofStar Guarantee Program'''''. |
| + | |||
| + | :For further information about EPDM Membrane System designs and requirements, see the '''[https://rpm.rcabc.org/index.php?title=EPDM_Roof_Systems_Standard Standard for EPDM Membrane Roof Systems]'''. | ||
| + | </div> | ||
| − | + | <div class="col-md-12"> | |
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
</div> | </div> | ||
| − | <div class="col-md- | + | <div class="col-md-4"> |
| − | + | <hr> | |
| − | + | ===Part 1 - General=== | |
| − | + | ====='''Permitted Roof Systems''' ([[EPDM_Roof_Systems_Standard#1.1.3.1._Permitted_Roof_Systems | Article 1.1.3.1.]])===== | |
| − | + | <ol> | |
| + | <li>[[EPDM Conventionally Insulated System (Typical)| Conventionally Insulated System (Typical)]] | ||
| + | <li>[[EPDM Conventionally Insulated System (Alternate) | Conventionally Insulated System (Alternate)]] | ||
| + | <li>[[EPDM Protected Roof Assembly (Typical) | Protected Roof Assembly (Typical)]] | ||
| + | </li></ol> | ||
| + | |||
| + | ===Part 6 - Air and Vapour Controls=== | ||
| + | ====='''Continuity and Support''' ([[EPDM_Roof_Systems_Standard#6.3.2.1._Continuity_and_Support | Article 6.3.2.1.]])===== | ||
| + | <ol> | ||
| + | <li>[[EPDM Air and Vapour Controls (Field) | {{hilite | Air and Vapour Controls (Field)|| 2021-February-7 }}]] | ||
| + | </li></ol> | ||
| + | |||
| + | ===Part 10 - Perimeters and Walls=== | ||
| + | ====='''General Application''' ([[EPDM_Roof_Systems_Standard#10.3.2.3._General_Application_Requirements_for_Perimeters_and_Walls | Article 10.3.2.3.]])===== | ||
| + | <ol> | ||
| + | <li>[[EPDM Membrane Termination A | Membrane Termination A]] | ||
| + | <li>[[EPDM Membrane Termination B | Membrane Termination B]] | ||
| + | <li>[[EPDM Membrane Termination C | Membrane Termination C]] | ||
| + | <li>[[EPDM Membrane Termination D | Membrane Termination D]] | ||
| + | <li>[[EPDM Membrane Termination E | Membrane Termination E]] | ||
| + | <li>[[EPDM Membrane Termination F | Membrane Termination F]] | ||
| + | </li></ol> | ||
| − | + | ====='''Parapets''' ([[SBS_Roof_Systems_Standard#10.3.4.1._Parapets | Article 10.3.4.1.]])===== | |
| − | + | <ol> | |
| − | + | <li>[[EPDM Parapet (Typical)| Parapet (Typical)]] - Under construction | |
| − | + | <li>[[EPDM Parapet (Independent of Roof Structure) | Parapet (Independent of Roof Structure)]] - Under construction | |
| − | + | <li>[[EPDM Tall Parapet | Tall Parapet]] - Under construction | |
| + | <li>[[EPDM Parapet-Wall Connection | Parapet-Wall Connection]] - Under construction | ||
| + | </li></ol> | ||
| − | + | ====='''Low-profile Edges''' ([[SBS_Roof_Systems_Standard#10.3.4.2._Low_Profile_Edges | Article 10.3.4.2.]])===== | |
| − | + | <ol> | |
| − | + | <li>[[EPDM Metal Edge Termination| {{hilite | Metal Edge Termination|| 2021-February-7 }}]] - Under construction | |
| + | </li></ol> | ||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
</div> | </div> | ||
| + | <div class="col-md-4"> | ||
| + | <hr> | ||
| + | |||
| + | ===Part 10 (continued)=== | ||
| + | ====='''Fire Separations''' ([[EPDM_Roof_Systems_Standard#10.3.4.4._Fire_Separation_Walls | Article 10.3.4.4.]])===== | ||
| + | <ol> | ||
| + | <li>[[EPDM Fire Separation Joint |Fire Separation Joint]] - Under construction | ||
| + | <li>[[EPDM Fire Separation Wall | Fire Separation Wall]] - Under construction | ||
| + | </li></ol> | ||
| + | |||
| + | ====='''Doors, Windows, and Wall Openings''' ([[EPDM_Roof_Systems_Standard#10.3.4.5._Doors.2C_Windows.2C_and_Wall_Openings | Article 10.3.4.5.]])===== | ||
| + | <ol> | ||
| + | <li>[[EPDM Low Door Opening | {{hilite | Low Door Opening || 2022-February-5 }}]] - Under construction | ||
| + | <li>[[EPDM Window Opening | Window Opening]] - Under construction | ||
| + | </li></ol> | ||
| + | |||
| + | ====='''Expansion Joints''' ([[EPDM_Roof_Systems_Standard#10.3.6.1._Expansion_Joints | Article 10.3.6.1.]])===== | ||
| + | <ol> | ||
| + | <li>[[EPDM Expansion Joint (Wall) | Expansion Joint (Wall)]] - Under construction | ||
| + | <li>[[EPDM Expansion Joint (Field)| Expansion Joint (Field)]] - Under construction | ||
| + | </li></ol> | ||
| + | ====='''Control Joints (Roof Dividers)''' ([[EPDM_Roof_Systems_Standard#10.3.6.2._Control_Joints_.28Roof_Dividers.29 | Article 10.3.6.2.]])===== | ||
| + | <ol> | ||
| + | <li>[[EPDM Control Joint (Roof Divider)| Control Joint (Roof Divider)]] - Under construction | ||
| + | </li></ol> | ||
| + | ===Part 11 - Drainage=== | ||
| + | ====='''Cast-iron Roof Drains''' ([[EPDM_Roof_Systems_Standard#11.3.3.2._General_Requirements_for_Cast-iron_Roof_Drains | Article 11.3.3.2.]])===== | ||
| + | <ol> | ||
| + | <li>[[EPDM 11.3.2.2-1 Cast Iron Drains| Cast Iron Drains]] - Under construction | ||
| + | </li></ol> | ||
| + | |||
| + | ====='''Flanged Insert-type Roof Drains''' ([[EPDM_Roof_Systems_Standard#11.3.3.6._Flanged_Insert-type_Roof_Drains | Article 11.3.3.6.]])===== | ||
| + | <ol> | ||
| + | <li>[[EPDM Flanged Insert Drain| Flanged Insert Drain]] - Under construction | ||
| + | <li>[[EPDM Flanged Insert Drain (Clamping Ring)| Flanged Insert Drain (Clamping Ring)]] - Under construction | ||
| + | </li></ol> | ||
| + | |||
| + | ====='''Scuppers and Overflows''' ([[EPDM_Roof_Systems_Standard#11.3.3.7._Scuppers_and_Overflows | Article 11.3.3.7.]])===== | ||
| + | <ol> | ||
| + | <li>[[EPDM Open-wall Scupper Drain | Open-wall Scupper Drain ]] - Under construction | ||
| + | <li>[[EPDM Through-wall Scupper Drain | Through-wall Scupper Drain ]] - Under construction | ||
| + | </li></ol> | ||
| + | |||
| + | </div> | ||
| + | <div class="col-md-4"> | ||
<hr> | <hr> | ||
| + | ===Part 12 - Penetrations and Curbs=== | ||
| + | |||
| + | ====='''Flashing Penetrations''' ([[EPDM_Roof_Systems_Standard#12.3.2.1._General_Requirements_for_Flashing_Penetrations | Article 12.3.2.1.]])===== | ||
| + | <ol> | ||
| + | <li>[[EPDM Plumbing Vent (Conventional Roof System)| Plumbing Vent (Conventional Roof System)]] - Under construction | ||
| + | <li>[[EPDM 2-Part Retrofit Flashing (Cable Penetration) | 2-Part Retrofit Flashing (Cable Penetration)]] - Under construction | ||
| + | <li>[[EPDM Fall Protection Anchor in Roof | Fall Protection Anchor in Roof]] - Under construction | ||
| + | <li>[[EPDM Fall Protection Anchor in Wall | Fall Protection Anchor in Wall]] - Under construction | ||
| + | <li>[[EPDM Fall Protection Anchor in Wall (Protected) | Fall Protection Anchor in Wall (Protected Roof System)]] - Under construction | ||
| + | </li></ol> | ||
| + | |||
| + | ====='''Curbs, Sleepers, and Equipment Pads''' ([[EPDM_Roof_Systems_Standard#12.3.2.4._Curbs.2C_Sleepers.2C_and_Equipment_Pads | Article 12.3.2.4.]])===== | ||
| + | <ol> | ||
| + | <li>[[EPDM Basic Curb| {{hilite | Basic Curb || 2021-February-7 }}]] - Under construction | ||
| + | <li>[[EPDM Curb for Multiple Penetrations| Curb for Multiple Penetrations]] - Under construction | ||
| + | <li>[[EPDM Mechanical Equipment Curb| Mechanical Equipment Curb]] - Under construction | ||
| + | <li>[[EPDM Equipment Sleeper | Equipment Sleeper]] - Under construction | ||
| + | </li></ol> | ||
| + | ====='''Railings, Ladders, and Other Attached Structures''' ([[EPDM_Roof_Systems_Standard#12.3.2.7._Railings.2C_Ladders.2C_and_Other_Attached_Structures | Article 12.3.2.7.]])===== | ||
| + | <ol> | ||
| + | <li>[[EPDM Railing | Railing]] - Under construction | ||
| + | </li></ol> | ||
| + | ====='''Sealant Pockets''' ([[SBS_Roof_Systems_Standard#12.3.2.8._Sealant_Pockets | Article 12.3.2.8.]])===== | ||
| + | <ol> | ||
| + | <li>[[EPDM Sealant Pocket| Sealant Pocket]] - Under construction | ||
| + | </li></ol> | ||
| − | [[ | + | ===Part 13 - Linear Metal Flashing=== |
| + | :See the separate page, [[Linear_Metal_Flashing_Details | Construction Details for Linear Metal Flashings]] | ||
| − | [[ | + | ===Part 14 - The Roof as a Platform=== |
| + | |||
| + | </div> | ||
| + | |||
| + | <div class="col-md-12"> | ||
| + | <hr> | ||
| + | |||
| + | [[EPDM Roof Systems Standard|<i class="fa fa-chevron-circle-left" ></i> ''Standard for EPDM Membrane Roof Systems'']] | ||
| + | |||
| + | [[Main Page | <i class="fa fa-home fa"></i> Home]] | ||
| + | {{Template:RPM Page Footer with Copyright and Current Date}} | ||
| + | </div> | ||
Latest revision as of 15:48, 31 October 2025
- Division D - Construction Details
- Construction Details for EPDM Membrane Roof Systems
- The drawings linked on this page are intended to represent a variety of EPDM Membrane roof system applications while remaining generic with regards to manufacturers’ specific application specifications. They do not represent all possible manufacturer application roof system designs. Consult each manufacturer's specifications and the RoofStar Guarantee Standards to develop a system acceptable to both the manufacturer and the RoofStar Guarantee Program.
- For further information about EPDM Membrane System designs and requirements, see the Standard for EPDM Membrane Roof Systems.
Part 1 - General
Permitted Roof Systems ( Article 1.1.3.1.)
- Conventionally Insulated System (Typical)
- Conventionally Insulated System (Alternate)
- Protected Roof Assembly (Typical)
Part 6 - Air and Vapour Controls
Continuity and Support ( Article 6.3.2.1.)
Part 10 - Perimeters and Walls
General Application ( Article 10.3.2.3.)
- Membrane Termination A
- Membrane Termination B
- Membrane Termination C
- Membrane Termination D
- Membrane Termination E
- Membrane Termination F
Parapets ( Article 10.3.4.1.)
- Parapet (Typical) - Under construction
- Parapet (Independent of Roof Structure) - Under construction
- Tall Parapet - Under construction
- Parapet-Wall Connection - Under construction
Low-profile Edges ( Article 10.3.4.2.)
- Metal Edge Termination - Under construction
Part 10 (continued)
Fire Separations ( Article 10.3.4.4.)
- Fire Separation Joint - Under construction
- Fire Separation Wall - Under construction
Doors, Windows, and Wall Openings ( Article 10.3.4.5.)
- Low Door Opening - Under construction
- Window Opening - Under construction
Expansion Joints ( Article 10.3.6.1.)
- Expansion Joint (Wall) - Under construction
- Expansion Joint (Field) - Under construction
Control Joints (Roof Dividers) ( Article 10.3.6.2.)
- Control Joint (Roof Divider) - Under construction
Part 11 - Drainage
Cast-iron Roof Drains ( Article 11.3.3.2.)
- Cast Iron Drains - Under construction
Flanged Insert-type Roof Drains ( Article 11.3.3.6.)
- Flanged Insert Drain - Under construction
- Flanged Insert Drain (Clamping Ring) - Under construction
Scuppers and Overflows ( Article 11.3.3.7.)
- Open-wall Scupper Drain - Under construction
- Through-wall Scupper Drain - Under construction
Part 12 - Penetrations and Curbs
Flashing Penetrations ( Article 12.3.2.1.)
- Plumbing Vent (Conventional Roof System) - Under construction
- 2-Part Retrofit Flashing (Cable Penetration) - Under construction
- Fall Protection Anchor in Roof - Under construction
- Fall Protection Anchor in Wall - Under construction
- Fall Protection Anchor in Wall (Protected Roof System) - Under construction
Curbs, Sleepers, and Equipment Pads ( Article 12.3.2.4.)
- Basic Curb - Under construction
- Curb for Multiple Penetrations - Under construction
- Mechanical Equipment Curb - Under construction
- Equipment Sleeper - Under construction
Railings, Ladders, and Other Attached Structures ( Article 12.3.2.7.)
- Railing - Under construction
Sealant Pockets ( Article 12.3.2.8.)
- Sealant Pocket - Under construction
Part 13 - Linear Metal Flashing
- See the separate page, Construction Details for Linear Metal Flashings
Part 14 - The Roof as a Platform
Standard for EPDM Membrane Roof Systems
© RCABC 2025
RoofStarTM is a registered Trademark of the RCABC.
No reproduction of this material, in whole or in part, is lawful without the expressed permission of the RCABC Guarantee Corp.
