Difference between revisions of "EPDM Conventionally Insulated System (Typical)"
Difference between revisions of "EPDM Conventionally Insulated System (Typical)"
(→WORK INCLUDED) |
|||
| Line 1: | Line 1: | ||
| + | {{Template:RPM Info}} | ||
| + | |||
| + | {{DISPLAYTITLE:<span style="position: absolute; clip: rect(1px 1px 1px 1px); clip: rect(1px, 1px, 1px, 1px);">{{FULLPAGENAME}}</span>}} | ||
| + | __NOTOC__ | ||
| + | |||
| + | <big><big>Division D - Construction Details</big></big> | ||
| + | <hr> | ||
| + | <big><big><big><big><big>EPDM 1.3.1-1 Conventionally Insulated System (mechanically attached)</big></big></big></big></big> | ||
{| class="wikitable" | style="color: black; background-color: orange; width: 100%;text-align:center" | {| class="wikitable" | style="color: black; background-color: orange; width: 100%;text-align:center" | ||
| − | | colspan="2" | <big>''''' | + | | colspan="2" | <big>'''''Notice to Reader'''''</big> |
| + | |- | ||
| + | | style="color: black; background-color: #ffffcc; width: 100%;text-align:center" | Images used in a Construction Detail are representative and not prescriptive. Nor are they necessarily drawn to scale. Rather, they are provided to visually convey the requirements of the Standard they represent. Unless otherwise required by the Standard, dimensions, the selection of materials and their application remains the responsibility of the ''Design Authority''.<br><br>The full text of the referenced requirements in the [[EPDM Roof Systems Standard | '''Standard''']] may be read by using the <span style="color:#6495ed">'''blue hyperlinks'''</span> | ||
|} | |} | ||
<div class="panel panel-success"> | <div class="panel panel-success"> | ||
| Line 13: | Line 23: | ||
<div class="col-md-6"> | <div class="col-md-6"> | ||
=== WORK INCLUDED === | === WORK INCLUDED === | ||
| − | ;1) [[ | + | ;1) [[EPDM Roof Systems Standard#EPDMSUBSTRATES|'''Gypsum Deck Overlay''']]: May be required depending on insulation thickness or when required as a thermal barrier by design authority. |
| − | ;(2) [[ | + | ;(2) [[EPDM Roof Systems Standard#EPDMINSULATION|'''Insulation''']]: Mechanically attached. Installed according to ''RoofStar Guarantee Standards''. See available insulation products in the [[Insulation (Roof Waterproofing Systems)|'''Accepted Materials''']] section of this Manual. |
| − | ;(3) [[ | + | ;(3) [[EPDM Roof Systems Standard#EPDMMEMBRANES|'''Single-ply Membrane''']]: Installed according to manufacturer's instructions and ''RoofStar Guarantee Standards''. |
| − | ;(4) [[ | + | ;(4) [[EPDM Roof Systems Standard#EPDMADHERED|'''Adhesive''']]: Proprietary, installed according to manufacturer's instructions, usually brushed, rolled or sprayed. |
| − | ;(5) [[ | + | ;(5) [[EPDM Roof Systems Standard#EPDMPERIMETERS|'''Membrane Flashing''']]: Adhered according to manufacturer's printed specifications using proprietary adhesive. Must be carried to outside of parapet or minimum 200 mm (8") above finished roof surface. |
;(6) '''Fasteners''': Install according to manufacturer's instructions (style may vary depending on material type and manufacturer's specification). | ;(6) '''Fasteners''': Install according to manufacturer's instructions (style may vary depending on material type and manufacturer's specification). | ||
;(7) '''Membrane Lap''': EPDM (thermoset) membrane may be joined using uncured tape or proprietary adhesive. | ;(7) '''Membrane Lap''': EPDM (thermoset) membrane may be joined using uncured tape or proprietary adhesive. | ||
| − | ;(8) [[ | + | ;(8) [[EPDM Roof Systems Standard#CAPCOUNTERBASE|'''Metal Cap Flashing''']]: As required by the ''RoofStar Guarantee Standards''. |
<hr> | <hr> | ||
=== RELATED WORK BY OTHERS === | === RELATED WORK BY OTHERS === | ||
| − | ;(A) [[ | + | ;(A) [[EPDM Roof Systems Standard#EPDMDECKS|'''Acceptable Deck''']] |
;(B) Acceptable Parapet Surface: Surface must be smooth, dry and clean. Rough surface must be covered with treated plywood, to be determined by design authority or inspector or as required by manufacturer. | ;(B) Acceptable Parapet Surface: Surface must be smooth, dry and clean. Rough surface must be covered with treated plywood, to be determined by design authority or inspector or as required by manufacturer. | ||
;(C) Sloped Wood Blocking | ;(C) Sloped Wood Blocking | ||
| Line 32: | Line 42: | ||
</div><!-- PANEL --> | </div><!-- PANEL --> | ||
| − | '''NOTE''': | + | '''NOTE''': See the [[EPDM Roof Systems Standard | '''Standard''']] for additional requirements. |
<hr> | <hr> | ||
| + | [[EPDM (Thermoset Membranes) Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''EPDM Construction Details'']] | ||
| − | [[ | + | [[Main Page | <i class="fa fa-home fa"></i> Home]] |
| − | |||
| − | |||
| − | + | {{Tempate:RPM Page Footer with Copyright and Current Date}} | |
Revision as of 18:17, 7 September 2021
Division D - Construction Details
EPDM 1.3.1-1 Conventionally Insulated System (mechanically attached)
| Notice to Reader | |
| Images used in a Construction Detail are representative and not prescriptive. Nor are they necessarily drawn to scale. Rather, they are provided to visually convey the requirements of the Standard they represent. Unless otherwise required by the Standard, dimensions, the selection of materials and their application remains the responsibility of the Design Authority. The full text of the referenced requirements in the Standard may be read by using the blue hyperlinks | |
EPDM Details
1 WORK INCLUDED
- 1) Gypsum Deck Overlay
- May be required depending on insulation thickness or when required as a thermal barrier by design authority.
- (2) Insulation
- Mechanically attached. Installed according to RoofStar Guarantee Standards. See available insulation products in the Accepted Materials section of this Manual.
- (3) Single-ply Membrane
- Installed according to manufacturer's instructions and RoofStar Guarantee Standards.
- (4) Adhesive
- Proprietary, installed according to manufacturer's instructions, usually brushed, rolled or sprayed.
- (5) Membrane Flashing
- Adhered according to manufacturer's printed specifications using proprietary adhesive. Must be carried to outside of parapet or minimum 200 mm (8") above finished roof surface.
- (6) Fasteners
- Install according to manufacturer's instructions (style may vary depending on material type and manufacturer's specification).
- (7) Membrane Lap
- EPDM (thermoset) membrane may be joined using uncured tape or proprietary adhesive.
- (8) Metal Cap Flashing
- As required by the RoofStar Guarantee Standards.
2 RELATED WORK BY OTHERS
- (A) Acceptable Deck
- (B) Acceptable Parapet Surface
- Surface must be smooth, dry and clean. Rough surface must be covered with treated plywood, to be determined by design authority or inspector or as required by manufacturer.
- (C) Sloped Wood Blocking
NOTE: See the Standard for additional requirements.
Back to EPDM Construction Details
© RCABC 2025
RoofStarTM is a registered Trademark of the RCABC.
No reproduction of this material, in whole or in part, is lawful without the expressed permission of the RCABC Guarantee Corp.

