Difference between revisions of "EPDM Conventionally Insulated System (Typical)"
Difference between revisions of "EPDM Conventionally Insulated System (Typical)"
m (James Klassen moved page EPDM Details:D2.7.1-1 Assemblies (Insulated Conventional) to EPDM 1.1.1 Conventionally Insulated System (generic)) |
(→WORK INCLUDED) |
||
| Line 13: | Line 13: | ||
<div class="col-md-6"> | <div class="col-md-6"> | ||
=== WORK INCLUDED === | === WORK INCLUDED === | ||
| − | ;1) [[RoofStar Guarantee Standards for EPDM | + | ;1) [[RoofStar Guarantee Standards for EPDM Membrane Systems#EPDMSUBSTRATES|'''Gypsum Deck Overlay''']]: May be required depending on insulation thickness or when required as a thermal barrier by design authority. |
| − | ;(2) [[RoofStar Guarantee Standards for EPDM | + | ;(2) [[RoofStar Guarantee Standards for EPDM Membrane Systems#EPDMINSULATION|'''Insulation''']]: Mechanically attached. Installed according to ''RoofStar Guarantee Standards''. See available insulation products in the [[Insulation (Roof Waterproofing Systems)|'''Accepted Materials''']] section of this Manual. |
| − | ;(3) [[RoofStar Guarantee Standards for EPDM | + | ;(3) [[RoofStar Guarantee Standards for EPDM Membrane Systems#EPDMMEMBRANES|'''Single-ply Membrane''']]: Installed according to manufacturer's instructions and ''RoofStar Guarantee Standards''. |
| − | ;(4) [[RoofStar Guarantee Standards for EPDM | + | ;(4) [[RoofStar Guarantee Standards for EPDM Membrane Systems#EPDMADHERED|'''Adhesive''']]: Proprietary, installed according to manufacturer's instructions, usually brushed, rolled or sprayed. |
| − | ;(5) [[RoofStar Guarantee Standards for EPDM | + | ;(5) [[RoofStar Guarantee Standards for EPDM Membrane Systems#EPDMPERIMETERS|'''Membrane Flashing''']]: Adhered according to manufacturer's printed specifications using proprietary adhesive. Must be carried to outside of parapet or minimum 200 mm (8") above finished roof surface. |
;(6) '''Fasteners''': Install according to manufacturer's instructions (style may vary depending on material type and manufacturer's specification). | ;(6) '''Fasteners''': Install according to manufacturer's instructions (style may vary depending on material type and manufacturer's specification). | ||
;(7) '''Membrane Lap''': EPDM (thermoset) membrane may be joined using uncured tape or proprietary adhesive. | ;(7) '''Membrane Lap''': EPDM (thermoset) membrane may be joined using uncured tape or proprietary adhesive. | ||
| − | ;(8) [[RoofStar Guarantee Standards for EPDM | + | ;(8) [[RoofStar Guarantee Standards for EPDM Membrane Systems#METALCAP|'''Metal Cap Flashing''']]: As required by the ''RoofStar Guarantee Standards''. |
<hr> | <hr> | ||
=== RELATED WORK BY OTHERS === | === RELATED WORK BY OTHERS === | ||
| − | ;(A) [[RoofStar Guarantee Standards for EPDM | + | ;(A) [[RoofStar Guarantee Standards for EPDM Membrane Systems#EPDMDECKS|'''Acceptable Deck''']] |
| − | ;(B) | + | ;(B) Acceptable Parapet Surface: Surface must be smooth, dry and clean. Rough surface must be covered with treated plywood, to be determined by design authority or inspector or as required by manufacturer. |
| − | ;(C) | + | ;(C) Sloped Wood Blocking |
</div><!-- COL-6-MD --> | </div><!-- COL-6-MD --> | ||
</div><!-- PANEL BODY --> | </div><!-- PANEL BODY --> | ||
| Line 37: | Line 37: | ||
| − | [[RoofStar Guarantee Standards for EPDM | + | [[RoofStar Guarantee Standards for EPDM Membrane Systems|<i class="fa fa-chevron-circle-left fa" ></i> RoofStar Guarantee Standards for EPDM Membrane Systems]] |
[[EPDM (Thermoset Membranes) Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''EPDM Construction Details'']] | [[EPDM (Thermoset Membranes) Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''EPDM Construction Details'']] | ||
[[Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''Construction Details'']] | [[Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''Construction Details'']] | ||
Revision as of 22:24, 30 October 2020
| RoofStar Guarantee Standards are blue-linked |
EPDM Details
1 WORK INCLUDED
- 1) Gypsum Deck Overlay
- May be required depending on insulation thickness or when required as a thermal barrier by design authority.
- (2) Insulation
- Mechanically attached. Installed according to RoofStar Guarantee Standards. See available insulation products in the Accepted Materials section of this Manual.
- (3) Single-ply Membrane
- Installed according to manufacturer's instructions and RoofStar Guarantee Standards.
- (4) Adhesive
- Proprietary, installed according to manufacturer's instructions, usually brushed, rolled or sprayed.
- (5) Membrane Flashing
- Adhered according to manufacturer's printed specifications using proprietary adhesive. Must be carried to outside of parapet or minimum 200 mm (8") above finished roof surface.
- (6) Fasteners
- Install according to manufacturer's instructions (style may vary depending on material type and manufacturer's specification).
- (7) Membrane Lap
- EPDM (thermoset) membrane may be joined using uncured tape or proprietary adhesive.
- (8) Metal Cap Flashing
- As required by the RoofStar Guarantee Standards.
2 RELATED WORK BY OTHERS
- (A) Acceptable Deck
- (B) Acceptable Parapet Surface
- Surface must be smooth, dry and clean. Rough surface must be covered with treated plywood, to be determined by design authority or inspector or as required by manufacturer.
- (C) Sloped Wood Blocking
NOTE: Refer to RoofStar Guarantee Standards for additional requirements.
RoofStar Guarantee Standards for EPDM Membrane Systems

