Search results

Jump to: navigation, search

Search results

  • ...signed as a ''Protected Membrane Roof System''. See also '''8.1.1 Design (Insulation Overlays)'''. ..."fines" from settling at the membrane level and filling the voids between insulation board joints.
    32 KB (4,724 words) - 17:43, 16 November 2021
  • <li>{{hilite | An insulation overlay is required on all ''Conventionally Insulated Roof Systems'' || 202 <li><span class="principles">''Uninsulated Systems''(insulation may be installed beneath the deck)</span>.
    35 KB (4,973 words) - 17:31, 22 November 2021
  • ...tructure with sloped ''decks'', or by introducing slope with tapered board insulation</span>. :See also '''Part 7 INSULATION'''.
    25 KB (3,582 words) - 14:50, 23 December 2021
  • | Insulation || #12 || 73 mm (2-7/8”) Hexagonal, 76 mm (3”) Round or Square | Insulation Overlays || #12 || 73 mm (2-7/8”) Hexagonal, 76 mm (3”) Round or Squar
    55 KB (7,513 words) - 20:12, 22 April 2022
  • ...rs, or to serve as a thermal barrier between the roof deck and combustible insulation. Roof ''deck'' overlay materials may also be applied to other types of sup
    6 KB (959 words) - 18:34, 15 November 2021
  • ...tion materials will resist burning for a period of time, only mineral wool insulation will not burn. ...for example, heat from a torch or from liquefied bitumen. Heat-sensitive insulation includes EPS, XPS and polyurethane.
    18 KB (2,507 words) - 19:23, 16 November 2021
  • ...ation overlay is required for all insulated ''systems'', regardless of the insulation type, and overlays must ...flat and sloped ||2021-June-30 }} board-type insulation, {{hilite | and on insulation installed on vertical surfaces|| 2021-June-30 }},
    10 KB (1,372 words) - 15:36, 16 November 2021
  • <li>accepted concrete-topped XPS insulation panels. <li>XPS insulation panels with drainage grooves or channels.
    29 KB (2,996 words) - 17:31, 15 June 2022
  • <li>{{hilite | When EIFS cladding is cut to permit roofing work, the exposed insulation must be restored with back-wrapped mesh, a base coat and finish coat, or wi
    36 KB (5,070 words) - 14:53, 17 November 2021
  • ...(see '''7.1.3.5'''). <span class="recommended">Sumps designed with sloped insulation are strongly recommended</span>. ...standards for sleepers or equipment pads. A separation layer between XPS insulation and PVC membranes is required, to prevent leaching of plasticizers from the
    45 KB (6,830 words) - 19:37, 11 March 2022
  • <li>a drainage layer beneath XPS insulation. <li>filter fabric installed over XPS insulation, in order to
    14 KB (2,184 words) - 18:37, 15 November 2021
  • ...stalled. Metal base flashings must “kick out” minimum 50 mm (2") over insulation and filter fabric. Filter fabric must be tucked up behind the base flashin
    28 KB (4,147 words) - 21:43, 27 April 2022
  • ...signed as a ''Protected Membrane Roof System''. See also '''8.1.1 Design (Insulation Overlays)'''. ..."fines" from settling at the membrane level and filling the voids between insulation board joints.
    32 KB (4,724 words) - 17:43, 16 November 2021
  • | [[#PART_7 | PART 7 - Insulation]] | [[#PART_8 | PART 8 - Insulation Overlays]]
    3 KB (419 words) - 21:58, 15 November 2021
  • | [[#PART_7 | PART 7 - Insulation]] | [[#PART_8 | PART 8 - Insulation Overlays]]
    3 KB (415 words) - 21:58, 15 November 2021
  • | [[#PART_7 | PART 7 - Insulation]] | [[#PART_8 | PART 8 - Insulation Overlays]]
    3 KB (412 words) - 21:58, 15 November 2021
  • | [[#PART_7 | PART 7 - Insulation]] | [[#PART_8 | PART 8 - Insulation Overlays]]
    3 KB (412 words) - 21:59, 15 November 2021
  • ...ng system'' is defined by whatever is placed on the membrane, which may be insulation, ballast, pavers or overburden. These materials will displace water and th ...roof membrane, while retaining existing ''roof system'' components (i.e., insulation, ballast).
    41 KB (6,077 words) - 18:11, 2 April 2024
  • ...ng system'' is defined by whatever is placed on the membrane, which may be insulation, ballast, pavers or overburden. These materials will displace water and th ...roof membrane, while retaining existing ''roof system'' components (i.e., insulation, ballast).
    41 KB (6,080 words) - 18:16, 2 April 2024
  • ...d). Installed according to ''RoofStar Guarantee Standards''. See available insulation products in the [[Division C|'''Accepted Materials''']] Division of this Ma ...yed (3A: 2- part low rising insulation adhesive, specifically used to bond insulation and cover boards)
    4 KB (592 words) - 18:24, 21 September 2022

View (previous 20 | next 20) (20 | 50 | 100 | 250 | 500)