Difference between revisions of "Asphalt Shingles - Application (Low Slopes)"

Jump to: navigation, search

Difference between revisions of "Asphalt Shingles - Application (Low Slopes)"

Line 1: Line 1:
 
{{Template:RPM Info}}
 
{{Template:RPM Info}}
 
+
<hr>
 
{| class="wikitable" | style="color: black; background-color: orange; width: 100%;text-align:center"
 
{| class="wikitable" | style="color: black; background-color: orange; width: 100%;text-align:center"
| colspan="2"  | <big>'''''RoofStar Guarantee Standards''''' are <span style="color:#6495ed">'''blue-linked'''</span></big>
+
| colspan="2"  | <big>'''''Notice to Reader'''''</big>
 +
|-
 +
| style="color: black; background-color: #ffffcc; width: 100%;text-align:center" | Images used in a Construction Detail are representative and not prescriptive.  Nor are they necessarily drawn to scale. Rather, they are provided to visually convey the requirements of the Standard they represent. Unless otherwise required by the Standard, dimensions, the selection of materials and their application remains the responsibility of the ''Design Authority''.<br><br>The full text of the referenced requirements in the [[Asphalt Shingle Systems Standard | '''Standard''']] may be read by using the <span style="color:#6495ed">'''blue hyperlinks'''</span>
 
|}
 
|}
 
<div class="panel panel-success">
 
<div class="panel panel-success">
Line 17: Line 19:
 
<div class="col-md-6">
 
<div class="col-md-6">
 
=== WORK INCLUDED ===
 
=== WORK INCLUDED ===
;(1) [[Standard for Asphalt Shingle Systems#AShEAVE-UNDERLAYMENT |'''Underlayment & Eave Protection''']]: One ply of self-adhered modified bituminous underlayment material. Lap 75 mm (3") minimum on sides and 150 mm (6") minimum on ends.
+
;(1) [[Asphalt Shingle Systems Standard#AShEAVE-UNDERLAYMENT |'''Underlayment & Eave Protection''']]: One ply of self-adhered modified bituminous underlayment material. Lap 75 mm (3") minimum on sides and 150 mm (6") minimum on ends.
;(2) [[Standard for Asphalt Shingle Systems#AShPERIM-GEN-APPLICATION|'''Edge Metal Flashing''']]: Required for all eave and rake edges.
+
;(2) [[Asphalt Shingle Systems Standard#AShPERIM-GEN-APPLICATION|'''Edge Metal Flashing''']]: Required for all eave and rake edges.
;(3) [[Standard for Asphalt Shingle Systems#AShPART9GEN-APPLICATION|'''Starter Course''']]: Consists of same type shingles used for roof, applied tabs facing up the slope.
+
;(3) [[Asphalt Shingle Systems Standard#AShPART9GEN-APPLICATION|'''Starter Course''']]: Consists of same type shingles used for roof, applied tabs facing up the slope.
 
;(4) '''Strip or Standard Shingles''': Applied as recommended by manufacturer. Laminated shingles are <u>not</u> acceptable for this application unless expressly permitted by the manufacturer.
 
;(4) '''Strip or Standard Shingles''': Applied as recommended by manufacturer. Laminated shingles are <u>not</u> acceptable for this application unless expressly permitted by the manufacturer.
 
;(5) '''Compatible Mastic''': Heavy bead of compatible asphaltic mastic at rakes (gables) and valleys.
 
;(5) '''Compatible Mastic''': Heavy bead of compatible asphaltic mastic at rakes (gables) and valleys.
;(6) [[Standard for Asphalt Shingle Systems#AShPART11-GEN-APPLICATION|'''Protrusions''']]: Curbs and skylights must be flashed with underlayment so as to shed water, with minimum 125mm (5") up vertical surfaces and 150 mm (6") lapping onto field surfaces (See [[Standard for Asphalt Shingle Systems#AShPART11-CURBS | '''11.3.4 Curbs''']]). Penetration flashings must be installed following the requirements in [[Standard for Asphalt Shingle Systems#AShPART11-PEN-FLASH | '''11.3.3 Penetrations and Vents''']]. For fire-rated stacks or hot pipe protrusions, strip in secondary metal deck flashing before installing rated stack / pipe flashing.
+
;(6) [[Asphalt Shingle Systems Standard#AShPART11-GEN-APPLICATION|'''Protrusions''']]: Curbs and skylights must be flashed with underlayment so as to shed water, with minimum 125mm (5") up vertical surfaces and 150 mm (6") lapping onto field surfaces (See [[Standard for Asphalt Shingle Systems#AShPART11-CURBS | '''11.3.4 Curbs''']]). Penetration flashings must be installed following the requirements in [[Standard for Asphalt Shingle Systems#AShPART11-PEN-FLASH | '''11.3.3 Penetrations and Vents''']]. For fire-rated stacks or hot pipe protrusions, strip in secondary metal deck flashing before installing rated stack / pipe flashing.
;(7) [[Standard for Asphalt Shingle Systems#AShSECUREMENT|'''Nailing''']]:  See the requirements in Section '''3.3 Application'''.
+
;(7) [[Asphalt Shingle Systems Standard#AShSECUREMENT|'''Nailing''']]:  See the requirements in Section '''3.3 Application'''.
  
 
<hr>
 
<hr>
  
 
=== RELATED WORK BY OTHERS ===
 
=== RELATED WORK BY OTHERS ===
;(A) [[Standard for Asphalt Shingle Systems#AShDECKS|'''Acceptable Deck''']]
+
;(A) [[Asphalt Shingle Systems Standard#AShDECKS|'''Acceptable Deck''']]
 
</div><!-- COL-6-MD -->
 
</div><!-- COL-6-MD -->
 
</div><!-- PANEL BODY -->
 
</div><!-- PANEL BODY -->
 
</div><!-- PANEL -->
 
</div><!-- PANEL -->
  
'''NOTE''': Refer to '''''RoofStar Guarantee Standards''''' for additional requirements.
+
'''NOTE''': See the [[Asphalt Shingle Systems Standard | '''Standard''']] for additional requirements.
  
 
<hr>
 
<hr>
  
 +
[[Asphalt Shingle System Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''"SBS" Roof System Details'']]
  
[[Standard for Asphalt Shingle Systems|<i class="fa fa-chevron-circle-left fa" ></i> Standard for Asphalt Shingle Systems]]
+
[[Main Page | <i class="fa fa-home fa"></i> Home]]
 
 
[[Asphalt Shingle Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''Asphalt Shingles Construction Details'']]
 
  
[[Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''Construction Details'']]
+
{{Tempate:RPM Page Footer with Copyright and Current Date}}

Revision as of 15:44, 31 August 2021


Notice to Reader
Images used in a Construction Detail are representative and not prescriptive. Nor are they necessarily drawn to scale. Rather, they are provided to visually convey the requirements of the Standard they represent. Unless otherwise required by the Standard, dimensions, the selection of materials and their application remains the responsibility of the Design Authority.

The full text of the referenced requirements in the Standard may be read by using the blue hyperlinks
Asphalt Shingle Details

Applicable to slopes 1:6 (2" in 12") and greater.

7.1.4.1.1.jpg

1 WORK INCLUDED

(1) Underlayment & Eave Protection
One ply of self-adhered modified bituminous underlayment material. Lap 75 mm (3") minimum on sides and 150 mm (6") minimum on ends.
(2) Edge Metal Flashing
Required for all eave and rake edges.
(3) Starter Course
Consists of same type shingles used for roof, applied tabs facing up the slope.
(4) Strip or Standard Shingles
Applied as recommended by manufacturer. Laminated shingles are not acceptable for this application unless expressly permitted by the manufacturer.
(5) Compatible Mastic
Heavy bead of compatible asphaltic mastic at rakes (gables) and valleys.
(6) Protrusions
Curbs and skylights must be flashed with underlayment so as to shed water, with minimum 125mm (5") up vertical surfaces and 150 mm (6") lapping onto field surfaces (See 11.3.4 Curbs). Penetration flashings must be installed following the requirements in 11.3.3 Penetrations and Vents. For fire-rated stacks or hot pipe protrusions, strip in secondary metal deck flashing before installing rated stack / pipe flashing.
(7) Nailing
See the requirements in Section 3.3 Application.

2 RELATED WORK BY OTHERS

(A) Acceptable Deck

NOTE: See the Standard for additional requirements.


Back to "SBS" Roof System Details

Home

© RCABC 2024
No reproduction of this material, in whole or in part, is lawful without the expressed permission of the RCABC Guarantee Corp.