Difference between revisions of "Asphalt Shingles - Intersection with Waterproofing Roof (Lower)"

Jump to: navigation, search

Difference between revisions of "Asphalt Shingles - Intersection with Waterproofing Roof (Lower)"

(WORK INCLUDED)
(WORK INCLUDED)
Line 22: Line 22:
 
;(1) [[RoofStar Guarantee Standards for Asphalt Shingle Systems#AShUNDERLAYMENT|'''Underlayment''']]: Required, and installed to overlap the Valley Protection Membrane and the Valley Metal Flashing.  Install ‘shingle-style’, following the requirements for side and end laps; use acceptable fasteners, or adhere (if a self-adhering membrane) in keeping with the manufacturer’s published requirements.
 
;(1) [[RoofStar Guarantee Standards for Asphalt Shingle Systems#AShUNDERLAYMENT|'''Underlayment''']]: Required, and installed to overlap the Valley Protection Membrane and the Valley Metal Flashing.  Install ‘shingle-style’, following the requirements for side and end laps; use acceptable fasteners, or adhere (if a self-adhering membrane) in keeping with the manufacturer’s published requirements.
 
;(2) [[RoofStar Guarantee Standards for Asphalt Shingle Systems#AShFIELDAPPLICATION|'''Shingles (field)''']]:
 
;(2) [[RoofStar Guarantee Standards for Asphalt Shingle Systems#AShFIELDAPPLICATION|'''Shingles (field)''']]:
;(3) [[RoofStar Guarantee Standards for Asphalt Shingle Systems#AShFIELDAPPLICATION|'''Field Shingles''']]:  
+
;(3) [[RoofStar Guarantee Standards for Asphalt Shingle Systems#AShFIELDAPPLICATION|'''Field Shingles''']]: Fasteners used to secure shingles must be at least 300 mm (12") above the finished surface of the Waterproofing roof system.
;(4) Field Membrane: (refer to the related Membrane Standards, Part '''9 FIELD MEMBRANE''' and Part '''10 PERIMETERS and WALLS''').
+
;(4) Field Membrane: Secure membrane to Water-shedding roof deck at least 300 mm (12") above the finished surface of the Waterproofing roof (refer to the related Membrane Standards, Part '''9 FIELD MEMBRANE''' and Part '''10 PERIMETERS and WALLS''').
  
 
<hr>
 
<hr>

Revision as of 19:56, 21 October 2019

RoofStar Guarantee Standards are blue-linked
Asphalt Shingle Details
Click on any image to expand it
ASh Figure 10.3.7.-B.jpg
ASh Intersection with Waterproofing Roof (Lower) 2.jpg

1 WORK INCLUDED

(1) Underlayment
Required, and installed to overlap the Valley Protection Membrane and the Valley Metal Flashing. Install ‘shingle-style’, following the requirements for side and end laps; use acceptable fasteners, or adhere (if a self-adhering membrane) in keeping with the manufacturer’s published requirements.
(2) Shingles (field)
(3) Field Shingles
Fasteners used to secure shingles must be at least 300 mm (12") above the finished surface of the Waterproofing roof system.
(4) Field Membrane
Secure membrane to Water-shedding roof deck at least 300 mm (12") above the finished surface of the Waterproofing roof (refer to the related Membrane Standards, Part 9 FIELD MEMBRANE and Part 10 PERIMETERS and WALLS).

2 RELATED WORK BY OTHERS

(A) Acceptable Deck

NOTE: Refer to RoofStar Guarantee Standards for additional requirements.



RoofStar Guarantee Standards for Asphalt Shingle Systems

Back to Asphalt Shingles Construction Details

Back to Construction Details