Difference between revisions of "Asphalt Shingles - Intersection with Waterproofing Roof (Lower)"

Jump to: navigation, search

Difference between revisions of "Asphalt Shingles - Intersection with Waterproofing Roof (Lower)"

Line 20: Line 20:
 
<div class="col-md-6">
 
<div class="col-md-6">
 
=== WORK INCLUDED ===
 
=== WORK INCLUDED ===
;(1) [[RoofStar Guarantee Standards for Asphalt Shingle Systems#AShUNDERLAYMENT|'''Underlayment''']]: Required, and installed to overlap the Valley Protection Membrane and the Valley Metal Flashing.  Install ‘shingle-style’, following the requirements for side and end laps; use acceptable fasteners, or adhere (if a self-adhering membrane) in keeping with the manufacturer’s published requirements.
+
;(1) [[Standard for Asphalt Shingle Systems#AShUNDERLAYMENT|'''Underlayment''']]: Required, and installed to overlap the Valley Protection Membrane and the Valley Metal Flashing.  Install ‘shingle-style’, following the requirements for side and end laps; use acceptable fasteners, or adhere (if a self-adhering membrane) in keeping with the manufacturer’s published requirements.
;(2) [[RoofStar Guarantee Standards for Asphalt Shingle Systems#AShFIELDAPPLICATION|'''Shingles (field)''']]:
+
;(2) [[Standard for Asphalt Shingle Systems#AShPART9GEN-APPLICATION|'''Shingles (field)''']]:
;(3) [[RoofStar Guarantee Standards for Asphalt Shingle Systems#AShFIELDAPPLICATION|'''Field Shingles''']]: Fasteners used to secure shingles must be at least 300 mm (12") above the finished surface of the Waterproofing roof system.  
+
;(3) [[Standard for Asphalt Shingle Systems#AShPART9GEN-APPLICATION|'''Field Shingles''']]: Fasteners used to secure shingles must be at least 300 mm (12") above the finished surface of the ''roof waterproofing system''.  
;(4) Field Membrane: Secure membrane to Water-shedding roof deck at least 300 mm (12") above the finished surface of the Waterproofing roof (refer to the related Membrane Standards, Part '''9 FIELD MEMBRANE''' and Part '''10 PERIMETERS and WALLS''').
+
;(4) Field Membrane: Secure membrane to ''water-shedding roof deck'' at least 300 mm (12") above the finished surface of the ''roof waterproofing'' (refer to the related Membrane Standards, Part '''9 FIELD MEMBRANE''' and Part '''10 PERIMETERS and WALLS''').
  
 
<hr>
 
<hr>
  
 
=== RELATED WORK BY OTHERS ===
 
=== RELATED WORK BY OTHERS ===
;(A) [[RoofStar Guarantee Standards for Asphalt Shingle Systems#AShDECK|'''Acceptable Deck''']]
+
;(A) [[Standard for Asphalt Shingle Systems#AShDECK|'''Acceptable Deck''']]
 
</div><!-- COL-6-MD -->
 
</div><!-- COL-6-MD -->
 
</div><!-- PANEL BODY -->
 
</div><!-- PANEL BODY -->
Line 38: Line 38:
  
  
[[RoofStar Guarantee Standards for Asphalt Shingle Systems|<i class="fa fa-chevron-circle-left fa" ></i> RoofStar Guarantee Standards for Asphalt Shingle Systems]]
+
[[Standard for Asphalt Shingle Systems|<i class="fa fa-chevron-circle-left fa" ></i> Standard for Asphalt Shingle Systems]]
  
 
[[Asphalt Shingle Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''Asphalt Shingles Construction Details'']]
 
[[Asphalt Shingle Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''Asphalt Shingles Construction Details'']]
  
 
[[Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''Construction Details'']]
 
[[Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''Construction Details'']]

Revision as of 16:54, 8 June 2021

RoofStar Guarantee Standards are blue-linked
Asphalt Shingle Details
Click on any image to expand it
link=http://rpm.rcabc.org/images/e/ef/ASh 10.7.2-1 CD.jpg
link=http://rpm.rcabc.org/images/e/ed/ASh 10.7.2-2 CD.jpg

1 WORK INCLUDED

(1) Underlayment
Required, and installed to overlap the Valley Protection Membrane and the Valley Metal Flashing. Install ‘shingle-style’, following the requirements for side and end laps; use acceptable fasteners, or adhere (if a self-adhering membrane) in keeping with the manufacturer’s published requirements.
(2) Shingles (field)
(3) Field Shingles
Fasteners used to secure shingles must be at least 300 mm (12") above the finished surface of the roof waterproofing system.
(4) Field Membrane
Secure membrane to water-shedding roof deck at least 300 mm (12") above the finished surface of the roof waterproofing (refer to the related Membrane Standards, Part 9 FIELD MEMBRANE and Part 10 PERIMETERS and WALLS).

2 RELATED WORK BY OTHERS

(A) Acceptable Deck

NOTE: Refer to RoofStar Guarantee Standards for additional requirements.



Standard for Asphalt Shingle Systems

Back to Asphalt Shingles Construction Details

Back to Construction Details