Difference between revisions of "Asphalt Shingles - Intersection with Waterproofing Roof (Upper)"

Jump to: navigation, search

Difference between revisions of "Asphalt Shingles - Intersection with Waterproofing Roof (Upper)"

Line 7: Line 7:
 
<div class="col-md-6">
 
<div class="col-md-6">
 
<div style="text-align:center; vertical-align:center">
 
<div style="text-align:center; vertical-align:center">
[[File:7.1.5.4.jpg|class=img-responsive]]
+
 
 +
{| class="wikitable"; table style="background-color:white"; border="#A9A9A9;"
 +
|+ Click on any image to expand it
 +
|-
 +
| [[File:ASh 10.7.1-1 CD.jpg | class=img-responsive | link=http://rpm.rcabc.org/images/e/ef/ASh_10.5.1-1_CD.jpg]]
 +
|-
 +
| [[File:ASh 10.7.1-2 CD.jpg | class=img-responsive | link=http://rpm.rcabc.org/images/e/ed/ASh_10.5.1-3_CD.jpg]]  
 +
|}
 
</div>
 
</div>
 
</div><!-- COL-MD-6 -->
 
</div><!-- COL-MD-6 -->
  
 
<div class="col-md-6">
 
<div class="col-md-6">
 +
=== WORK INCLUDED ===
 +
;(1) [[RoofStar Guarantee Standards for Asphalt Shingle Systems#AShUNDERLAYMENT|'''Underlayment''']]: Required, and installed to overlap the Valley Protection Membrane and the Valley Metal Flashing.  Install ‘shingle-style’, following the requirements for side and end laps; use acceptable fasteners, or adhere (if a self-adhering membrane) in keeping with the manufacturer’s published requirements.
 +
;(2)[[RoofStar Guarantee Standards for Asphalt Shingle Systems#AShEAVES|'''Eave Protection Membrane''']]: Applied beneath the metal valley flashing.
 +
;(3)[[RoofStar Guarantee Standards for Asphalt Shingle Systems#AShFIELDAPPLICATION|'''Shingles (field)''']]:
 +
;(4) Metal Counterflashing.
 +
;(5) Metal Edge Flashing (refer to the related Membrane Standards, '''10.3.5.2 Metal Edge Terminations''').
 +
;(6) Field Membrane (refer to the related Membrane Standards, Part '''9 FIELD MEMBRANE''' and Part '''10 PERIMETERS and WALLS''').
 +
 +
<hr>
  
 +
=== RELATED WORK BY OTHERS ===
 +
;(A) [[RoofStar Guarantee Standards for Asphalt Shingle Systems#AShDECK|'''Acceptable Deck''']]
 
</div><!-- COL-6-MD -->
 
</div><!-- COL-6-MD -->
 
</div><!-- PANEL BODY -->
 
</div><!-- PANEL BODY -->

Revision as of 19:11, 21 October 2019

RoofStar Guarantee Standards are blue-linked
Asphalt Shingle Details
Click on any image to expand it
ASh Figure 10.3.7.-A.jpg
ASh Intersection with Waterproofing Roof (Upper) 2.jpg

1 WORK INCLUDED

(1) Underlayment
Required, and installed to overlap the Valley Protection Membrane and the Valley Metal Flashing. Install ‘shingle-style’, following the requirements for side and end laps; use acceptable fasteners, or adhere (if a self-adhering membrane) in keeping with the manufacturer’s published requirements.
(2)Eave Protection Membrane
Applied beneath the metal valley flashing.
(3)Shingles (field)
(4) Metal Counterflashing.
(5) Metal Edge Flashing (refer to the related Membrane Standards, 10.3.5.2 Metal Edge Terminations).
(6) Field Membrane (refer to the related Membrane Standards, Part 9 FIELD MEMBRANE and Part 10 PERIMETERS and WALLS).

2 RELATED WORK BY OTHERS

(A) Acceptable Deck

NOTE: Refer to RoofStar Guarantee Standards for additional requirements.



RoofStar Guarantee Standards for Asphalt Shingle Systems

Back to Asphalt Shingles Construction Details

Back to Construction Details