;(1) [[RoofStar Guarantee Standards for Asphalt Shingle Systems#AShUNDERLAYMENT|'''Underlayment''']]: Required, and installed to overlap the Valley Protection Membrane and the Valley Metal Flashing. Install ‘shingle-style’, following the requirements for side and end laps; use acceptable fasteners, or adhere (if a self-adhering membrane) in keeping with the manufacturer’s published requirements. | ;(1) [[RoofStar Guarantee Standards for Asphalt Shingle Systems#AShUNDERLAYMENT|'''Underlayment''']]: Required, and installed to overlap the Valley Protection Membrane and the Valley Metal Flashing. Install ‘shingle-style’, following the requirements for side and end laps; use acceptable fasteners, or adhere (if a self-adhering membrane) in keeping with the manufacturer’s published requirements. | ||
− | ;(2)[[RoofStar Guarantee Standards for Asphalt Shingle Systems#AShEAVES|'''Eave Protection Membrane''']]: Applied beneath the metal valley flashing. | + | ;(2) [[RoofStar Guarantee Standards for Asphalt Shingle Systems#AShEAVES|'''Eave Protection Membrane''']]: Applied beneath the metal valley flashing. |
− | ;(3)[[RoofStar Guarantee Standards for Asphalt Shingle Systems#AShFIELDAPPLICATION|'''Shingles (field)''']]: | + | ;(3) [[RoofStar Guarantee Standards for Asphalt Shingle Systems#AShFIELDAPPLICATION|'''Shingles (field)''']]: |
;(4) Metal Counterflashing. | ;(4) Metal Counterflashing. | ||
;(5) Metal Edge Flashing (refer to the related Membrane Standards, '''10.3.5.2 Metal Edge Terminations'''). | ;(5) Metal Edge Flashing (refer to the related Membrane Standards, '''10.3.5.2 Metal Edge Terminations'''). |
Revision as of 19:15, 21 October 2019
RoofStar Guarantee Standards are blue-linked |
Asphalt Shingle Details
1 WORK INCLUDED
- (1) Underlayment
- Required, and installed to overlap the Valley Protection Membrane and the Valley Metal Flashing. Install ‘shingle-style’, following the requirements for side and end laps; use acceptable fasteners, or adhere (if a self-adhering membrane) in keeping with the manufacturer’s published requirements.
- (2) Eave Protection Membrane
- Applied beneath the metal valley flashing.
- (3) Shingles (field)
- (4) Metal Counterflashing.
- (5) Metal Edge Flashing (refer to the related Membrane Standards, 10.3.5.2 Metal Edge Terminations).
- (6) Field Membrane (refer to the related Membrane Standards, Part 9 FIELD MEMBRANE and Part 10 PERIMETERS and WALLS).
2 RELATED WORK BY OTHERS
- (A) Acceptable Deck
NOTE: Refer to RoofStar Guarantee Standards for additional requirements.
RoofStar Guarantee Standards for Asphalt Shingle Systems