Difference between revisions of "Drafting - Division A, C"

Jump to: navigation, search

Difference between revisions of "Drafting - Division A, C"

(Miscellaneous Drafts)
(Division C (Accepted Materials))
 
(71 intermediate revisions by the same user not shown)
Line 1: Line 1:
 
__NOTOC__
 
__NOTOC__
 +
__NONUMBEREDHEADINGS__
 +
 
<big>This page is used for drafting new or revised wordings, before publishing</big>
 
<big>This page is used for drafting new or revised wordings, before publishing</big>
==General Templates and Drafts==
 
:<big>[[RPM Templates Page]]</big>
 
:<big>[[Material Page Template]]</big>
 
:<big>[[Accessory Page Template]]</big>
 
:<big>[[Associate Member Page Template]]</big>
 
  
==Full Standards (no templates)==
+
<div class="col-md-3">
:<big>[[Draft Waterproofing Roofs (SBS) | Draft Waterproofing Roofs (SBS) - full Standard, no templates]]</big> do not use/for reference only
+
<hr>
:<big>[[Draft Waterproofing Roofs (EPDM) | Draft Waterproofing Roofs (EPDM) - full Standard, no templates]]</big> do not use/for reference only
+
===General Templates and Drafts===
:<big>[[Draft Waterproofing Roofs (TPO) | Draft Waterproofing Roofs (TPO) - full Standard, no templates]]</big> do not use/for reference only
+
:<big>[[Draft Main Page of RPM]]</big>
:<big>[[Draft Waterproofing Roofs (PVC) | Draft Waterproofing Roofs (PVC) - full Standard, no templates]]</big> do not use/for reference only
 
:<big>[[Draft Water-shedding Standards (ASM) | Draft Water-shedding Roofs (ASM) - full Standard]]</big>
 
:<big>[[Draft Water-shedding Standards (ASh) | Draft Water-shedding Roofs (ASh) - full Standard]]</big>
 
  
==Roof Waterproofing Standards (Part 1)==
+
:<big>[[Draft Divison A]]</big>
:<big>[[Purpose of Standards]]</big>
+
:<big>[[Draft Divison B]]</big>
:<big>[[RoofStar Guarantee]]</big>
+
:<big>[[Draft Divison C]]</big>
:<big>[[Scope of Standards]]</big>
+
:<big>[[Draft Divison D]]</big>
:<big>[[Use of Standards]]</big>
+
:<big>[[Draft Divison E]]</big>
 +
</div>
 +
<div class="col-md-3">
 +
<hr>
  
:<big>[[Draft Template:Section 1.6 (All Standards)]]</big>
+
===Division A (Scope, Use of Standards, and Guarantee )===
 +
:<big>[[Table Drafts 2 | Technical Committee composition]]</big>
  
==Roof Waterproofing Standards (by Part)==
+
:<big>[[Scope of RPM and Standards]]</big>
:<big>[[Draft Template:Part 1 (Waterproofing Roofs - SBS)]]</big>
+
:<big>[[Structure and Organization of RPM and Standards]]</big>
:<big>[[Draft Template:Part 1 (Waterproofing Roofs - EPDM)]]</big>
+
:<big>[[Guarantee]]</big>
:<big>[[Draft Template:Part 1 (Waterproofing Roofs - PVC)]]</big>
+
:<big>[[Specifying a RoofStar Guarantee]]</big>
:<big>[[Draft Template:Part 1 (Waterproofing Roofs - TPO)]]</big>
+
:<big>[[Limitations and Exclusions of Guarantee | Limitations and Exclusions (draft of Article 3.2.1.2., Guarantee, Div. A)]]</big>
:<big>[[Draft Template:Part 2 (Waterproofing Roofs - SBS)]]</big>
+
</div>
:<big>[[Draft Template:Part 2 (Waterproofing Roofs - Single Ply)]]</big>
+
<div class="col-md-3">
:<big>[[Draft Template:Part 3 (Waterproofing Roofs - SBS)]]</big>
+
<hr>
:<big>[[Draft Template:Part 3 (Waterproofing Roofs - Single Ply)]]</big>
 
:<big>[[Draft Template:Part 4 (Waterproofing Roofs)]]</big>
 
:<big>[[Draft Template:Part 5 (Waterproofing Roofs)]]</big>
 
:<big>[[Draft Template:Part 6 (Waterproofing Roofs)]]</big>
 
:<big>[[Draft Template:Part 7 (Waterproofing Roofs)]]</big>
 
:<big>[[Draft Template:Part 8 (Waterproofing Roofs - SBS)]]</big>
 
:<big>[[Draft Template:Part 8 (Waterproofing Roofs - Single Ply)]]</big>
 
:<big>[[Draft Template:Part 9 (Waterproofing Roofs - SBS)]]</big>
 
:<big>[[Draft Template:Part 9 (Waterproofing Roofs - EPDM)]]</big>
 
:<big>[[Draft Template:Part 9 (Waterproofing Roofs - PVC)]]</big>
 
:<big>[[Draft Template:Part 9 (Waterproofing Roofs - TPO)]]</big>
 
:<big>[[Draft Template:Part 10 (Waterproofing Roofs - SBS)]]</big>
 
:<big>[[Draft Template:Part 10 (Waterproofing Roofs - Single-ply)]]</big>
 
:<big>[[Draft Template:Part 11 (Waterproofing Roofs - SBS)]]</big>
 
:<big>[[Draft Template:Part 11 (Waterproofing Roofs - Single Ply)]]</big>
 
:<big>[[Draft Template:Part 12 (Waterproofing Roofs - SBS)]]</big>
 
:<big>[[Draft Template:Part 12 (Waterproofing Roofs - Single Ply)]]</big>
 
:<big>[[Draft Template:Part 13 (Waterproofing Roofs)]]</big>
 
:<big>[[Draft Template:Part 14 (Waterproofing Roofs)]]</big>
 
  
==Construction Detail draft pages==
+
===Division C (Accepted Materials)===
:<big>[[Draft CD 1 | Draft Construction Detail 1 ASM]]</big>
+
:<big>[[RPM Templates Page]]</big>
:<big>[[Draft CD 2 | Draft Construction Detail 2 ASM]]</big>
+
:<big>[[Material Page Template]]</big>
:<big>[[Draft CD 3 | Draft Construction Detail 3 ASM]]</big>
+
:<big>[[ASM Panel Page Template (for Active Members)]]</big>
:<big>[[Draft CD 4 | Draft Construction Detail 4 ASM]]</big>
+
:<big>[[Accessory Page Template]]</big>
:<big>[[Draft CD 5 | Draft Construction Detail 5 ASM]]</big>
+
:<big>[[Associate Member Page Template]]</big>
:<big>[[Draft CD 6 | Draft Construction Detail 6 ASM]]</big>
+
:<big>[[Active Member Page Template (ASM)]]</big>
:<big>[[Draft CD 7 | Draft Construction Detail 7 ASM]]</big>
 
:<big>[[Draft CD 8 | Draft Construction Detail 8 ASM]]</big>
 
:<big>[[Draft CD 9 | Draft Construction Detail 9 ASM]]</big>
 
:<big>[[Draft CD 10 | Draft Construction Detail 10 ASM]]</big>
 
:<big>[[Draft CD 11 | Draft Construction Detail 11 ASM]]</big>
 
:<big>[[Draft CD 12 | Draft Construction Detail 12 ASM]]</big>
 
:<big>[[Draft CD 13 | Draft Construction Detail 13 ASM]]</big>
 
:<big>[[Draft CD 14 | Draft Construction Detail 14 ASM]]</big>
 
:<big>[[Draft CD 15 | Draft Construction Detail 15 ASM]]</big>
 
:<big>[[Draft CD 16 | Draft Construction Detail 16 ASM]]</big>
 
:<big>[[Draft CD 17 | Draft Construction Detail 17 ASM]]</big>
 
:<big>[[Draft CD 18 | Draft Construction Detail 18 ASM]]</big>
 
:<big>[[Draft CD 19 | Draft Construction Detail 19 | Ash 11.3.1]]</big>
 
:<big>[[Draft CD 20 | Draft Construction Detail 20 | 10.3.7.1 Low Door and Window Opening]]</big>
 
  
==Miscellaneous Drafts==
+
:<big>[[Division C - Search by System (under revision)]]</big>
:<big>[[Miscellaneous wordings 1 | Effective R-Value Calculator for sloped insulation]]</big>
 
:<big>[[Miscellaneous wordings 2]]</big>
 
:<big>[[Standard for SBS-Modified Bitumen Membrane Systems - Part 1]]</big>
 
:<big>[[Standard for SBS-Modified Bitumen Membrane Systems - Part 2]]</big>
 
:<big>[[Standard for SBS-Modified Bitumen Membrane Systems - Part 3]]</big>
 
:<big>[[Standard for SBS-Modified Bitumen Membrane Systems - Part 4]]</big>
 
:<big>[[Standard for SBS-Modified Bitumen Membrane Systems - Part 5]]</big>
 
:<big>[[Standard for SBS-Modified Bitumen Membrane Systems - Part 6]]</big>
 
:<big>[[Standard for SBS-Modified Bitumen Membrane Systems - Part 7]]</big>
 
:<big>[[Standard for SBS-Modified Bitumen Membrane Systems - Part 8]]</big>
 
:<big>[[Standard for SBS-Modified Bitumen Membrane Systems - Part 9]]</big>
 
:<big>[[Standard for SBS-Modified Bitumen Membrane Systems - Part 10]]</big>
 
:<big>[[Standard for SBS-Modified Bitumen Membrane Systems - Part 11]]</big>
 
:<big>[[Standard for SBS-Modified Bitumen Membrane Systems - Part 12]]</big>
 
:<big>[[Standard for SBS-Modified Bitumen Membrane Systems - Part 13]]</big>
 
:<big>[[Standard for SBS-Modified Bitumen Membrane Systems - Part 14]]</big>
 
:<big>[[Notes to Standard for SBS-Modified Bitumen Membrane Systems]]</big>
 
:<big>[[Mock-up of Standard for SBS-Modified Bitumen Membrane Systems (revised) | SBS Standard, Parts on one Page]]</big>
 
:<big>[[Mock-up of Standard for SBS-Modified Bitumen Membrane Systems | SBS Standard, Parts on Separate Pages]]</big>
 
:<big>[[RPM - Revised Structure and Organization]]</big>
 
  
:<big>[[Table Drafts 1]]</big>
 
:<big>[[Table Drafts 2]]</big>
 
:<big>[[Table Drafts 3]]</big>
 
:<big>[[Table Drafts 4]]</big>
 
:<big>[[Table Drafts 5]]</big>
 
 
==Accepted Materials Draft Pages==
 
 
:<big>[[Accepted Materials 1]]</big>
 
:<big>[[Accepted Materials 1]]</big>
 +
:<big>[[Accepted Materials 2]]</big>
 
:<big>[[Accepted Materials 2 | Accepted Materials Criteria]]</big>
 
:<big>[[Accepted Materials 2 | Accepted Materials Criteria]]</big>
:<big>[[Accepted Materials 3]]</big>
+
:<big>[[Materials Drafting 1 | Materials Drafting 1]]</big>
:<big>[[Accepted Materials 4]]</big>
+
</div>
:<big>[[Accepted Materials 5]]</big>
 
:<big>[[Accepted Materials 6]]</big>
 
:<big>[[Accepted Materials 7]]</big>
 
:<big>[[Accepted Materials 8]]</big>
 
 
 
==Tested Assembly Draft Pages==
 
:<big>[[CSA Tested Assemblies Draft 1]]</big>
 
:<big>[[CSA Tested Assemblies Draft 2]]</big>
 
:<big>[[CSA Tested Assemblies Draft 3]]</big>
 

Latest revision as of 15:12, 26 October 2023