EPDM Conventionally Insulated System (Alternate)

Jump to: navigation, search

EPDM Conventionally Insulated System (Alternate)

Revision as of 18:17, 7 September 2021 by James Klassen (talk | contribs)



Division D - Construction Details


EPDM 1.3.1-2 Conventionally Insulated System (adhered)

Notice to Reader
Images used in a Construction Detail are representative and not prescriptive. Nor are they necessarily drawn to scale. Rather, they are provided to visually convey the requirements of the Standard they represent. Unless otherwise required by the Standard, dimensions, the selection of materials and their application remains the responsibility of the Design Authority.

The full text of the referenced requirements in the Standard may be read by using the blue hyperlinks
EPDM Details

6.3.2.1.jpg

1 WORK INCLUDED

(1) Vapour Retarder
If required by design authority.
(2) Insulation
Mechanically attached where deck type permits. Installed according to RoofStar Guarantee Standards. See available insulation products in the Accepted Materials section of this Manual.
(3) Adhesive
Proprietary, installed according to manufacturer's instructions, usually brushed, rolled or sprayed.
(4) Single-ply Membrane
Installed according to manufacturer's instructions and RoofStar Guarantee Standards.
(5) Membrane Lap
Thermoset membrane may be joined using uncured tape or proprietary adhesive.
(6) Edge Flashing
Proprietary.
(7) Membrane Flashing
Installed according to manufacturer's instructions.

2 RELATED WORK BY OTHERS

(A) Acceptable Deck
(B) Fascia
Optional.
(C) Wood Blocking

NOTE: See the Standard for additional requirements.


Back to EPDM Construction Details

Home

© RCABC 2024
No reproduction of this material, in whole or in part, is lawful without the expressed permission of the RCABC Guarantee Corp.