Difference between revisions of "EPDM Conventionally Insulated System (Alternate)"

Jump to: navigation, search

Difference between revisions of "EPDM Conventionally Insulated System (Alternate)"

(RELATED WORK BY OTHERS)
 
(24 intermediate revisions by the same user not shown)
Line 1: Line 1:
 +
{{Template:RPM Info}}
 +
 +
{{DISPLAYTITLE:<span style="position: absolute; clip: rect(1px 1px 1px 1px); clip: rect(1px, 1px, 1px, 1px);">{{FULLPAGENAME}}</span>}}
 +
__NOTOC__
 +
 +
<big><big>Division D - Construction Details</big></big>
 
<hr>
 
<hr>
[[File:6.3.2.1.jpg]]
+
<big><big><big><big><big>EPDM | Conventionally Insulated System (Alternate) ([[EPDM_Roof_Systems_Standard#1.1.3.1._Permitted_Roof_Systems | Article 1.1.3.1.]])</big></big></big></big></big>
 
+
{{Template:Construction Details Header}}
 +
<div class="panel panel-success">
 +
<div class="panel-heading"><big>'''EPDM Details'''</big></div>
 +
<div class="panel-body">
 +
<div class="col-md-6">
 +
<div style="text-align:center; vertical-align:center">
 +
[[File:6.3.2.1.jpg|class=img-responsive]]
 +
</div>
 +
</div><!-- COL-MD-6 -->
  
 +
<div class="col-md-6">
 
=== WORK INCLUDED ===
 
=== WORK INCLUDED ===
;(1) [[RoofStar Guarantee Standards for EPDM Roof Systems#EPDMVAPOUR|'''Vapour Retarder''']]: If required by design authority.
+
;(1) [[EPDM Roof Systems Standard#PART_6|'''Vapour Retarder''']]: If required by design authority.
;(2) [[RoofStar Guarantee Standards for EPDM Roof Systems#EPDMINSULATION|'''Insulation''']]: Mechanically attached where deck type permits. Installed according to ''RoofStar Guarantee Standards''. See available insulation products in the [[Roof Deck Insulation|'''Accepted Materials''']] section of this Manual.
+
;(2) [[EPDM Roof Systems Standard#PART_7|'''Insulation''']]: Mechanically attached where deck type permits. Installed according to ''RoofStar Guarantee Standards''. See available insulation products in the [[Division C | Division C]] of this Manual.
;(3) [[RoofStar Guarantee Standards for EPDM Roof Systems#EPDMADHESIVE|'''Adhesive''']]: Proprietary, installed according to manufacturer's instructions, usually brushed, rolled or sprayed.
+
;(3) [[EPDM Roof Systems Standard#PART_9|'''Adhesive''']]: Proprietary, installed according to manufacturer's instructions, usually brushed, rolled or sprayed.
;(4) [[RoofStar Guarantee Standards for EPDM Roof Systems#EPDMMEMBRANE|'''Single-ply Membrane''']]: Installed according to manufacturer's instructions and ''RoofStar Guarantee Standards''.
+
;(4) [[EPDM Roof Systems Standard#PART_9|'''Single-ply Membrane''']]: Installed according to manufacturer's instructions and ''RoofStar Guarantee Standards''.
 
;(5) '''Membrane Lap''': Thermoset membrane may be joined using uncured tape or proprietary adhesive.
 
;(5) '''Membrane Lap''': Thermoset membrane may be joined using uncured tape or proprietary adhesive.
 
;(6) '''Edge Flashing''': Proprietary.
 
;(6) '''Edge Flashing''': Proprietary.
;(7) [[RoofStar Guarantee Standards for EPDM Roof Systems#EPDMSTRIPPING|'''Membrane Flashing''']]: Installed according to manufacturer's instructions.
+
;(7) [[EPDM Roof Systems Standard#PART_10|'''Membrane Flashing''']]: Installed according to manufacturer's instructions.
  
 
<hr>
 
<hr>
  
 
=== RELATED WORK BY OTHERS ===
 
=== RELATED WORK BY OTHERS ===
;(A) [[RoofStar Guarantee Standards for EPDM Roof Systems#EPDMDECKS|'''Acceptable Deck''']]
+
;(A) [[EPDM Roof Systems Standard#PART_2|'''Acceptable Deck''']]
;(B) '''Fascia''': Optional.
+
;(B) Fascia: Optional.
;(C) [[RoofStar Guarantee Standards for EPDM Roof Systems#EPDMWOODBLOCKING|'''Wood Blocking''']]
+
;(C) Wood Blocking
 
+
</div><!-- COL-6-MD -->
 
+
</div><!-- PANEL BODY -->
 
+
</div><!-- PANEL -->
'''NOTE''': Refer to '''''RoofStar Guarantee Standards''''' for additional requirements.
 
  
 +
'''NOTE''': See the [[EPDM Roof Systems Standard | '''Standard''']] for additional requirements.
  
 
<hr>
 
<hr>
  
 +
[[EPDM (Thermoset Membranes) Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''EPDM Construction Details'']]
  
 +
[[Main Page | <i class="fa fa-home fa"></i> Home]]
  
 
+
{{Tempate:RPM Page Footer with Copyright and Current Date}}
 
 
[[Section:D. Application: Low Slope Roofs|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''EPDM Application'']]
 
 
 
[[EPDM (Thermoset Membranes) Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''EPDM Construction Details'']]
 
 
 
[[Section:G. Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''Construction Details'']]
 

Latest revision as of 21:53, 27 June 2022



Division D - Construction Details


EPDM | Conventionally Insulated System (Alternate) ( Article 1.1.3.1.)

Notice to Reader
Images used in a Construction Detail are representative and not prescriptive, and are not necessarily drawn to scale. They are intended to support the related Standard (Ref. Division A, Article 2.2.1.2.).

The reader may link to the related Article in the detail title, or link to the Standard as it relates to a specific element in the detail. All hyperlinks are displayed blue text.

EPDM Details

6.3.2.1.jpg

1 WORK INCLUDED

(1) Vapour Retarder
If required by design authority.
(2) Insulation
Mechanically attached where deck type permits. Installed according to RoofStar Guarantee Standards. See available insulation products in the Division C of this Manual.
(3) Adhesive
Proprietary, installed according to manufacturer's instructions, usually brushed, rolled or sprayed.
(4) Single-ply Membrane
Installed according to manufacturer's instructions and RoofStar Guarantee Standards.
(5) Membrane Lap
Thermoset membrane may be joined using uncured tape or proprietary adhesive.
(6) Edge Flashing
Proprietary.
(7) Membrane Flashing
Installed according to manufacturer's instructions.

2 RELATED WORK BY OTHERS

(A) Acceptable Deck
(B) Fascia
Optional.
(C) Wood Blocking

NOTE: See the Standard for additional requirements.


Back to EPDM Construction Details

Home

© RCABC 2024
No reproduction of this material, in whole or in part, is lawful without the expressed permission of the RCABC Guarantee Corp.