Difference between revisions of "EPDM Conventionally Insulated System (Alternate)"

Jump to: navigation, search

Difference between revisions of "EPDM Conventionally Insulated System (Alternate)"

 
(2 intermediate revisions by the same user not shown)
Line 6: Line 6:
 
<big><big>Division D - Construction Details</big></big>
 
<big><big>Division D - Construction Details</big></big>
 
<hr>
 
<hr>
<big><big><big><big><big>EPDM 1.3.1-2 Conventionally Insulated System (adhered)</big></big></big></big></big>
+
<big><big><big><big><big>EPDM | Conventionally Insulated System (Alternate) ([[EPDM_Roof_Systems_Standard#1.1.3.1._Permitted_Roof_Systems | Article 1.1.3.1.]])</big></big></big></big></big>
{| class="wikitable" | style="color: black; background-color: orange; width: 100%;text-align:center"
+
{{Template:Construction Details Header}}
| colspan="2"  | <big>'''''Notice to Reader'''''</big>
 
|-
 
| style="color: black; background-color: #ffffcc; width: 100%;text-align:center" | Images used in a Construction Detail are representative and not prescriptive.  Nor are they necessarily drawn to scale. Rather, they are provided to visually convey the requirements of the Standard they represent. Unless otherwise required by the Standard, dimensions, the selection of materials and their application remains the responsibility of the ''Design Authority''.<br><br>The full text of the referenced requirements in the [[EPDM Roof Systems Standard | '''Standard''']] may be read by using the <span style="color:#6495ed">'''blue hyperlinks'''</span>
 
|}
 
 
<div class="panel panel-success">
 
<div class="panel panel-success">
 
<div class="panel-heading"><big>'''EPDM Details'''</big></div>
 
<div class="panel-heading"><big>'''EPDM Details'''</big></div>
Line 23: Line 19:
 
<div class="col-md-6">
 
<div class="col-md-6">
 
=== WORK INCLUDED ===
 
=== WORK INCLUDED ===
;(1) [[EPDM Roof Systems Standard#EPDMAIRVAPOUR|'''Vapour Retarder''']]: If required by design authority.
+
;(1) [[EPDM Roof Systems Standard#PART_6|'''Vapour Retarder''']]: If required by design authority.
;(2) [[EPDM Roof Systems Standard#EPDMINSULATION|'''Insulation''']]: Mechanically attached where deck type permits. Installed according to ''RoofStar Guarantee Standards''. See available insulation products in the [[Insulation (Roof Waterproofing Systems)|'''Accepted Materials''']] section of this Manual.
+
;(2) [[EPDM Roof Systems Standard#PART_7|'''Insulation''']]: Mechanically attached where deck type permits. Installed according to ''RoofStar Guarantee Standards''. See available insulation products in the [[Division C | Division C]] of this Manual.
;(3) [[EPDM Roof Systems Standard#EPDMADHERED|'''Adhesive''']]: Proprietary, installed according to manufacturer's instructions, usually brushed, rolled or sprayed.
+
;(3) [[EPDM Roof Systems Standard#PART_9|'''Adhesive''']]: Proprietary, installed according to manufacturer's instructions, usually brushed, rolled or sprayed.
;(4) [[EPDM Roof Systems Standard#EPDMMEMBRANES|'''Single-ply Membrane''']]: Installed according to manufacturer's instructions and ''RoofStar Guarantee Standards''.
+
;(4) [[EPDM Roof Systems Standard#PART_9|'''Single-ply Membrane''']]: Installed according to manufacturer's instructions and ''RoofStar Guarantee Standards''.
 
;(5) '''Membrane Lap''': Thermoset membrane may be joined using uncured tape or proprietary adhesive.
 
;(5) '''Membrane Lap''': Thermoset membrane may be joined using uncured tape or proprietary adhesive.
 
;(6) '''Edge Flashing''': Proprietary.
 
;(6) '''Edge Flashing''': Proprietary.
;(7) [[EPDM Roof Systems Standard#EPDMPERIMETERS|'''Membrane Flashing''']]: Installed according to manufacturer's instructions.
+
;(7) [[EPDM Roof Systems Standard#PART_10|'''Membrane Flashing''']]: Installed according to manufacturer's instructions.
  
 
<hr>
 
<hr>
  
 
=== RELATED WORK BY OTHERS ===
 
=== RELATED WORK BY OTHERS ===
;(A) [[EPDM Roof Systems Standard#EPDMDECKS|'''Acceptable Deck''']]
+
;(A) [[EPDM Roof Systems Standard#PART_2|'''Acceptable Deck''']]
 
;(B) Fascia: Optional.
 
;(B) Fascia: Optional.
 
;(C) Wood Blocking
 
;(C) Wood Blocking

Latest revision as of 21:53, 27 June 2022



Division D - Construction Details


EPDM | Conventionally Insulated System (Alternate) ( Article 1.1.3.1.)

Notice to Reader
Images used in a Construction Detail are representative and not prescriptive, and are not necessarily drawn to scale. They are intended to support the related Standard (Ref. Division A, Article 2.2.1.2.).

The reader may link to the related Article in the detail title, or link to the Standard as it relates to a specific element in the detail. All hyperlinks are displayed blue text.

EPDM Details

6.3.2.1.jpg

1 WORK INCLUDED

(1) Vapour Retarder
If required by design authority.
(2) Insulation
Mechanically attached where deck type permits. Installed according to RoofStar Guarantee Standards. See available insulation products in the Division C of this Manual.
(3) Adhesive
Proprietary, installed according to manufacturer's instructions, usually brushed, rolled or sprayed.
(4) Single-ply Membrane
Installed according to manufacturer's instructions and RoofStar Guarantee Standards.
(5) Membrane Lap
Thermoset membrane may be joined using uncured tape or proprietary adhesive.
(6) Edge Flashing
Proprietary.
(7) Membrane Flashing
Installed according to manufacturer's instructions.

2 RELATED WORK BY OTHERS

(A) Acceptable Deck
(B) Fascia
Optional.
(C) Wood Blocking

NOTE: See the Standard for additional requirements.


Back to EPDM Construction Details

Home

© RCABC 2024
No reproduction of this material, in whole or in part, is lawful without the expressed permission of the RCABC Guarantee Corp.