Difference between revisions of "EPDM Roof System Details"

Jump to: navigation, search

Difference between revisions of "EPDM Roof System Details"

Line 7: Line 7:
 
:[[EPDM Details:D2.7.2 Assemblies (Fully Adhered)|D2.7.2 Assemblies (Fully Adhered)]]
 
:[[EPDM Details:D2.7.2 Assemblies (Fully Adhered)|D2.7.2 Assemblies (Fully Adhered)]]
 
:[[EPDM Details:D2.7.3 Assemblies (Ballasted Protected Membrane)|D2.7.3 Assemblies (Ballasted Protected Membrane)]]
 
:[[EPDM Details:D2.7.3 Assemblies (Ballasted Protected Membrane)|D2.7.3 Assemblies (Ballasted Protected Membrane)]]
:[[EPDM Details:D2.7.4 (Curb Opening)|D2.7.4 Curb Opening]]
 
 
:[[EPDM Details:D2.7.5 (Clamping Copper Drain)|D2.7.5 Clamping Copper Drain]]
 
:[[EPDM Details:D2.7.5 (Clamping Copper Drain)|D2.7.5 Clamping Copper Drain]]
 
:[[EPDM Details:D2.7.6 (Two-Part Box Flashing)|D2.7.6 Two-Part Box Flashing]]
 
:[[EPDM Details:D2.7.6 (Two-Part Box Flashing)|D2.7.6 Two-Part Box Flashing]]
 
:[[EPDM Details:D2.7.7 (Mechanical Curb Opening)|D2.7.7 Mechanical Curb Opening]]
 
:[[EPDM Details:D2.7.7 (Mechanical Curb Opening)|D2.7.7 Mechanical Curb Opening]]
 +
:[[EPDM Details:D2.7.20 Curbs & Sleepers (Basic Curb)|D2.7.20 Curbs & Sleepers (Basic Curb)]]
 +
:[[EPDM Details:D2.7.21 Curbs & Sleepers (Mechanical Opening)|D2.7.21 Curbs & Sleepers (Mechanical Opening)]]
  
 
<hr>
 
<hr>
Line 34: Line 35:
 
:[[EPDM Details:D2.7.18 Curbs & Sleepers (Equipment Sleeper)|D2.7.18 Curbs & Sleepers (Equipment Sleeper)(Under Construction)]]
 
:[[EPDM Details:D2.7.18 Curbs & Sleepers (Equipment Sleeper)|D2.7.18 Curbs & Sleepers (Equipment Sleeper)(Under Construction)]]
 
:[[EPDM Details:D2.7.19 Curbs & Sleepers (Multiple Roof Penetrations)|D2.7.19 Curbs & Sleepers (Multiple Roof Penetrations)(Under Construction)]]
 
:[[EPDM Details:D2.7.19 Curbs & Sleepers (Multiple Roof Penetrations)|D2.7.19 Curbs & Sleepers (Multiple Roof Penetrations)(Under Construction)]]
:[[EPDM Details:D2.7.20 Curbs & Sleepers (Basic Curb)|D2.7.20 Curbs & Sleepers (Basic Curb)(Under Construction)]]
+
 
:[[EPDM Details:D2.7.21 Curbs & Sleepers (Mechanical Opening)|D2.7.21 Curbs & Sleepers (Mechanical Opening)(Under Construction)]]
+
 
 
:[[EPDM Details:D2.7.22 Curbs & Sleepers (Pre-curb for Planters)|D2.7.22 Curbs & Sleepers (Pre-curb for Planters)(Under Construction)]]
 
:[[EPDM Details:D2.7.22 Curbs & Sleepers (Pre-curb for Planters)|D2.7.22 Curbs & Sleepers (Pre-curb for Planters)(Under Construction)]]
 
:[[EPDM Details:D2.7.23 Strip-in Flashings (Metal Plumbing)|D2.7.23 Strip-in Flashings (Metal Plumbing)(Under Construction)]]
 
:[[EPDM Details:D2.7.23 Strip-in Flashings (Metal Plumbing)|D2.7.23 Strip-in Flashings (Metal Plumbing)(Under Construction)]]

Revision as of 18:16, 8 August 2016

The drawings contained within this section are intended to represent a variety of thermoset membrane roof system applications while remaining generic with regards to manufacturers’ specific application specifications. They do not represent all possible manufacturer application roof system designs. Consult manufacturers’ specifications and RoofStar Guarantee Standards to develop a system acceptable to both the manufacturer and RGC.

For further information about thermoset membrane (EPDM) system designs and requirements, see EPDM (Thermoset Membranes) Roof Systems.


D2.7.1 Assemblies (Insulated Conventional)
D2.7.2 Assemblies (Fully Adhered)
D2.7.3 Assemblies (Ballasted Protected Membrane)
D2.7.5 Clamping Copper Drain
D2.7.6 Two-Part Box Flashing
D2.7.7 Mechanical Curb Opening
D2.7.20 Curbs & Sleepers (Basic Curb)
D2.7.21 Curbs & Sleepers (Mechanical Opening)

NOTE: The following pages are currently under construction
D2.7.8 Roof Edge (Under Construction)
D2.7.3 Parapets & Copings (High - Wall Supported)(Under Construction)
D2.7.4 Parapets & Copings (Parapet - Wall Transition)(Under Construction)
D2.7.5 Edges & Fascia (Cant Edge)(Under Construction)
D2.7.6 Edges & Fascia (Gravel Stop)(Under Construction)
D2.7.7 Counter-flashings & Reglets (Deck - Wall Supported)(Under Construction)
D2.7.8 Counter-flashings & Reglets (Deck - Unsupported by Wall)(Under Construction)
D2.7.9 Counter-flashings & Reglets (Stucco Wall: Re-roofing)(Under Construction)
D2.7.10 Counter-flashings & Reglets (Stucco Wall: New)(Under Construction)
D2.7.11 Counter-flashings & Reglets (Double Surface Reglet)(Under Construction)
D2.7.12 Counter-flashings & Reglets (Low Door Sill)(Under Construction)
D2.7.13 Counter-flashings & Reglets (Window Curb)(Under Construction)
D2.7.14 Roof-Wall Transitions (Expansion Joint)(Under Construction)
D2.7.15 Roof-Wall Transitions (Divider/Joint)(Under Construction)
D2.7.16 Roof-Wall Transitions (Fire Separation Joint)(Under Construction)
D2.7.17 Roof-Wall Transitions (Fire Separation Wall)(Under Construction)
D2.7.18 Curbs & Sleepers (Equipment Sleeper)(Under Construction)
D2.7.19 Curbs & Sleepers (Multiple Roof Penetrations)(Under Construction)


D2.7.22 Curbs & Sleepers (Pre-curb for Planters)(Under Construction)
D2.7.23 Strip-in Flashings (Metal Plumbing)(Under Construction)
D2.7.24 Strip-in Flashings (Two-part Cable)(Under Construction)
D2.7.25 Strip-in Flashings (Pourable Sealer Pocket)(Under Construction)
D2.7.26 Water & Drainage (Cast Iron Drain)(Under Construction)
D2.7.27 Water & Drainage (Spun Copper Drain)(Under Construction)
D2.7.28 Water & Drainage (Clamping Spun Copper Drain)(Under Construction)
D2.7.29 Water & Drainage (Open Wall Scupper)(Under Construction)
D2.7.30 Water & Drainage (Through-wall Scupper)(Under Construction)
D2.7.31 Miscellaneous Penetrations (Roof Anchor)(Under Construction)
D2.7.32 Miscellaneous Penetrations (Wall Anchor - Conventional Roof Assy)(Under Construction)
D2.7.33 Miscellaneous Penetrations (Wall Anchor - Protected Roof Assy)(Under Construction)



Back to EPDM Roof Systems

Back to Construction Details Section