Difference between revisions of "LMF Metal Cap Flashing (Parapet-to-Wall Transition - Site Formed)"

Jump to: navigation, search

Difference between revisions of "LMF Metal Cap Flashing (Parapet-to-Wall Transition - Site Formed)"

 
(7 intermediate revisions by the same user not shown)
Line 1: Line 1:
 +
{{Template:RPM Info}}
 +
 +
{{DISPLAYTITLE:<span style="position: absolute; clip: rect(1px 1px 1px 1px); clip: rect(1px, 1px, 1px, 1px);">{{FULLPAGENAME}}</span>}}
 +
__NOTOC__
 +
 +
<big><big>Division D - Construction Details</big></big>
 +
<hr>
 +
<big><big><big><big><big>LMF | Metal Cap Flashing (Parapet-to-Wall Transition - Site Formed)</big></big></big></big></big>
 
{| class="wikitable" | style="color: black; background-color: orange; width: 100%;text-align:center"
 
{| class="wikitable" | style="color: black; background-color: orange; width: 100%;text-align:center"
| colspan="2"  | <big>'''''RoofStar Guarantee Standards''''' are <span style="color:#6495ed">'''blue-linked'''</span></big>
+
| colspan="2"  | <big>'''''Notice to Reader'''''</big>
 +
|-
 +
| style="color: black; background-color: #ffffcc; width: 100%;text-align:center" | Images used in a Construction Detail are representative and not prescriptive.  Nor are they necessarily drawn to scale. Rather, they are provided to visually convey the requirements of the Standard they represent. Unless otherwise required by the Standard, dimensions, the selection of materials and their application remains the responsibility of the ''Design Authority''.<br><br>The full text of the referenced requirements can be read in any Standard and may be read by using the <span style="color:#6495ed">'''blue hyperlinks'''</span>
 
|}
 
|}
 
<div class="panel panel-success">
 
<div class="panel panel-success">
Line 7: Line 17:
 
<div class="col-md-6">
 
<div class="col-md-6">
 
<div style="text-align:center; vertical-align:center">
 
<div style="text-align:center; vertical-align:center">
[[File:10.2.1.2.jpg|class=img-responsive]]
+
[[File:10.2.1.2.jpg| link=http://rpm.rcabc.org/images/4/4b/10.2.1.2.jpg | class=img-responsive]]
 
</div>
 
</div>
 
</div><!-- COL-MD-6 -->
 
</div><!-- COL-MD-6 -->
Line 13: Line 23:
 
<div class="col-md-6">
 
<div class="col-md-6">
 
=== FABRICATION PROCEDURE ===
 
=== FABRICATION PROCEDURE ===
(1) <b>Metal Cap Flashing:</b> Cut to form<b> </b>a<b> </b>25mm (1")<b> </b>wide<b> </b>flange for seam fabrication at cap flashing /wall transitions. Fasten outside face with continuous concealed clip-type fasteners <b>or</b> with two concealed discontinuous clips or cladding screws evenly spaced between seams. See [[RoofStar Guarantee Standards for SBS Roof Systems#SBSMETALBASE|'''SBS Roof Systems - 12.6 Cap Flashings, Base Flashings and Reglets''']] (parallel Standards are shown for all Low Slope Roof Systems) for additional reqiurements for metal flashings.  Cap flashing over 100 mm (4") in width must provide positive slope to roof area.
+
;(1) Metal Cap Flashing: Cut to form<b> </b>a<b> </b>25mm (1")<b> </b>wide<b> </b>flange for seam fabrication at cap flashing /wall transitions. Fasten outside face with continuous concealed clip-type fasteners <b>or</b> with two concealed discontinuous clips or cladding screws evenly spaced between seams. Cap flashing over 100 mm (4") in width must provide positive slope to roof area.
 
+
;(2) Gusset Flange: Site fabricated a minimum of 100mm (4") wider than the top, inside and outside face of metal cap flashing. Metal gusset flange to match profile of cap flashing with an additional allowance of 12.7 mm (1/2") of material for seaming. Gusset Flange must lap under sheathing membrane and wall cladding or finish by a minimum of 75mm (3").
(2) <b>Gusset Flange:</b> Site fabricated a minimum of 100mm (4") wider than the top, inside and outside face of metal cap flashing. Metal gusset flange to match profile of cap flashing with an additional allowance of 12.7 mm (1/2") of material for seaming. Gusset Flange must lap under sheathing membrane and wall cladding or finish by a minimum of 75mm (3").
+
;(3) Double Fold Seam: Site formed standing seam folded flat on back surface of wall transition gusset to form double fold seam. <b>Optional</b>: Install polyurethane caulking seam tape prior to forming double folded seam.
 
 
(3) <b>Double Fold Seam: </b>Site formed standing seam folded flat on back surface of wall transition gusset to form double fold seam. <b>Optional</b>: Install polyurethane caulking seam tape prior to forming double folded seam.
 
 
   
 
   
;NOTE:
 
 
*Refer to [[RoofStar Guarantee Standards for SBS Roof Systems#SBSMETALFLASH|'''SBS Roof Systems - 12. Perimeter Flashing: Metal''']] (parallel Standards are shown for all Low Slope Roof Systems) for additional requirements:  Sheet Metal Standards, Metal Flashing Seams, Metal Parapet / Base Flashing and Reglets, and for RoofStar Guarantee Standards for the mechanical attachment of Cap Flashing.
 
 
</div><!-- COL-6-MD -->
 
</div><!-- COL-6-MD -->
 
</div><!-- PANEL BODY -->
 
</div><!-- PANEL BODY -->
 
</div><!-- PANEL -->
 
</div><!-- PANEL -->
  
'''NOTE''': Refer to '''''RoofStar Guarantee Standards''''' for additional requirements.
+
'''NOTE''': See the related Standard for additional requirements.
  
 
<hr>
 
<hr>
  
 +
[[Main Page | <i class="fa fa-home fa"></i> Home]]
  
 
+
{{Tempate:RPM Page Footer with Copyright and Current Date}}
 
 
[[Metal Flashing Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''Metal Flashing Details'']]
 
 
 
[[Section:G. Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''Construction Details'']]
 

Latest revision as of 19:08, 22 November 2022



Division D - Construction Details


LMF | Metal Cap Flashing (Parapet-to-Wall Transition - Site Formed)

Notice to Reader
Images used in a Construction Detail are representative and not prescriptive. Nor are they necessarily drawn to scale. Rather, they are provided to visually convey the requirements of the Standard they represent. Unless otherwise required by the Standard, dimensions, the selection of materials and their application remains the responsibility of the Design Authority.

The full text of the referenced requirements can be read in any Standard and may be read by using the blue hyperlinks
Metal Flashing Details

10.2.1.2.jpg

1 FABRICATION PROCEDURE

(1) Metal Cap Flashing
Cut to form a 25mm (1") wide flange for seam fabrication at cap flashing /wall transitions. Fasten outside face with continuous concealed clip-type fasteners or with two concealed discontinuous clips or cladding screws evenly spaced between seams. Cap flashing over 100 mm (4") in width must provide positive slope to roof area.
(2) Gusset Flange
Site fabricated a minimum of 100mm (4") wider than the top, inside and outside face of metal cap flashing. Metal gusset flange to match profile of cap flashing with an additional allowance of 12.7 mm (1/2") of material for seaming. Gusset Flange must lap under sheathing membrane and wall cladding or finish by a minimum of 75mm (3").
(3) Double Fold Seam
Site formed standing seam folded flat on back surface of wall transition gusset to form double fold seam. Optional: Install polyurethane caulking seam tape prior to forming double folded seam.

NOTE: See the related Standard for additional requirements.


Home

© RCABC 2024
No reproduction of this material, in whole or in part, is lawful without the expressed permission of the RCABC Guarantee Corp.