Difference between revisions of "SBS 2-Part Retrofit Flashing (Cable Penetration)"

Jump to: navigation, search

Difference between revisions of "SBS 2-Part Retrofit Flashing (Cable Penetration)"

(5 intermediate revisions by the same user not shown)
Line 1: Line 1:
 
{{Template:RPM Info}}
 
{{Template:RPM Info}}
 +
 +
{{DISPLAYTITLE:<span style="position: absolute; clip: rect(1px 1px 1px 1px); clip: rect(1px, 1px, 1px, 1px);">{{FULLPAGENAME}}</span>}}
 +
__NOTOC__
 +
 +
<big><big>Division D - Construction Details</big></big>
 
<hr>
 
<hr>
{| class="wikitable" | style="color: black; background-color: orange; width: 100%;text-align:center"
+
<big><big><big><big><big>SBS | 2-Part Retrofit Flashing (Cable Penetration) ([[SBS_Roof_Systems_Standard#12.3.2.1._General_Requirements_for_Flashing_Penetrations | Article 12.3.2.1.]])</big></big></big></big></big>
| colspan="2"  | <big>'''''Notice to Reader'''''</big>
+
{{Template:Construction Details Header}}
|-
 
| style="color: black; background-color: #ffffcc; width: 100%;text-align:center" | Images used in a Construction Detail are representative and not prescriptive. Nor are they necessarily drawn to scale. Rather, they are provided to visually convey the requirements of the Standard they represent. Unless otherwise required by the Standard, dimensions, the selection of materials and their application remains the responsibility of the ''Design Authority''.<br><br>The full text of the referenced requirements in the [[SBS Roof Systems Standard | '''Standard''']] may be read by using the <span style="color:#6495ed">'''blue hyperlinks'''</span>
 
|}
 
 
<div class="panel panel-success">
 
<div class="panel panel-success">
 
<div class="panel-heading"><big>'''SBS Details'''</big></div>
 
<div class="panel-heading"><big>'''SBS Details'''</big></div>
Line 29: Line 31:
 
<div class="col-md-6">
 
<div class="col-md-6">
 
=== WORK INCLUDED ===
 
=== WORK INCLUDED ===
;(1) [[SBS Roof Systems Standard#SBSDECKWALLOVERLAY|'''Supporting Deck Overlay''']]: Optional, depending upon deck condition and roof system requirements.
+
;(1) [[SBS Roof Systems Standard#PART_5|'''Supporting Deck Overlay''']]: Optional, depending upon deck condition and roof system requirements.
;(2) [[SBS Roof Systems Standard#SBSAIRVAPOUR|'''Air or Vapour Control Layer''']]: Installed following the requirements of '''Part 6''' in this Standard.  Tie in the control layers with membranes installed by other trades, to preserve continuity of the building enclosure ('''2a''').
+
;(2) [[SBS Roof Systems Standard#PART_6|'''Air or Vapour Control Layer''']]: Installed following the requirements of '''Part 6''' in this Standard.  Tie in the control layers with membranes installed by other trades, to preserve continuity of the building enclosure ('''2a''').
;(3) [[SBS Roof Systems Standard#SBSINSULATIONAPPLICATION|'''Insulation''']]: Installed in staggered and offset layers, and secured in accordance with the design of the system, which is based on the ''British Columbia Building Code'', Part 4 and Part 5, and on '''Part 3''' of the '''''RoofStar Guarantee Standards''''' for the membrane system type.
+
;(3) [[SBS Roof Systems Standard#PART_7|'''Insulation''']]: Installed in staggered and offset layers, and secured in accordance with the design of the system, which is based on the ''British Columbia Building Code'', Part 4 and Part 5, and on '''Part 3''' of the '''''RoofStar Guarantee Standards''''' for the membrane system type.
;(4) [[SBS Roof Systems Standard#SBSINSULATIONOVERLAY|'''Insulation Overlay''']]: Subject to the requirements of '''Part 8''' in the '''''RoofStar Guarantee Standards''''' for the membrane system type.
+
;(4) [[SBS Roof Systems Standard#PART_8|'''Insulation Overlay''']]: Subject to the requirements of '''Part 8''' in the '''''RoofStar Guarantee Standards''''' for the membrane system type.
;(5) [[SBS Roof Systems Standard#SBSMEMBRANES|'''Field Membrane (field)''']]: Mechanically attached, torch-applied, adhered (shown) or self-adhered.  See Tables '''9.1''' for acceptable membrane types and securement options.  See '''9.3''' for application requirements.
+
;(5) [[SBS Roof Systems Standard#PART_9|'''Field Membrane (field)''']]: Mechanically attached, torch-applied, adhered (shown) or self-adhered.  See Tables '''9.1''' for acceptable membrane types and securement options.  See '''9.3''' for application requirements.
 
;(6) Two-part Penetration Cable Flashing: May be proprietary or shop-fabricated from galvanized sheet metal, consisting of two parts that are riveted together in the field, secured to the roof assembly and then ‘stripped’ into the field membrane to waterproof the flashing.  This type of flashing may be adapted in its design to accommodate a pipe that turns horizontally to the roof field plane.  The exit point for the penetration must be shielded with a hood and sloped downward to shed water.  Secure separate lid with screw-type fasteners.   
 
;(6) Two-part Penetration Cable Flashing: May be proprietary or shop-fabricated from galvanized sheet metal, consisting of two parts that are riveted together in the field, secured to the roof assembly and then ‘stripped’ into the field membrane to waterproof the flashing.  This type of flashing may be adapted in its design to accommodate a pipe that turns horizontally to the roof field plane.  The exit point for the penetration must be shielded with a hood and sloped downward to shed water.  Secure separate lid with screw-type fasteners.   
  
 
:See '''11.2.3 Curbs and Penetration Flashings''' for fabrication standards.
 
:See '''11.2.3 Curbs and Penetration Flashings''' for fabrication standards.
 
;(7) Mastic: Applied to area receiving metal penetration flashing. See '''11.3.3.1''' ('''12''')('''1''').
 
;(7) Mastic: Applied to area receiving metal penetration flashing. See '''11.3.3.1''' ('''12''')('''1''').
;(8) [[SBS Roof Systems Standard#SBSTARGET|'''Base Membrane Flashing (target patch)''']]: Cut from a single piece of self-adhering or torch-applied base membrane material, it is fashioned with a hole to fit around the penetration flashing and is sealed to the flashing and the roof field.  The target patch must cover the flashing flange and extend beyond the edge of the flange, onto the field base membrane, by at least 100 mm (4”).  See '''11.3.3.1''' ('''12''') for all applicable standards.
+
;(8) [[SBS Roof Systems Standard#PART_10|'''Base Membrane Flashing (target patch)''']]: Cut from a single piece of self-adhering or torch-applied base membrane material, it is fashioned with a hole to fit around the penetration flashing and is sealed to the flashing and the roof field.  The target patch must cover the flashing flange and extend beyond the edge of the flange, onto the field base membrane, by at least 100 mm (4”).  See '''11.3.3.1''' ('''12''') for all applicable standards.
;(9) [[SBS Roof Systems Standard#SBSMEMBRANES|'''Cap Membrane (field)''']]: Granule-surfaced membrane.  See Tables '''9.1''' and '''9.2''' for acceptable cap membrane types and their securement options.  See '''9.3''' for application requirements.
+
;(9) [[SBS Roof Systems Standard#PART_9|'''Cap Membrane (field)''']]: Granule-surfaced membrane.  See Tables '''9.1''' and '''9.2''' for acceptable cap membrane types and their securement options.  See '''9.3''' for application requirements.
;(10)[[SBS Roof Systems Standard#SBSPERIMETERS|'''Cap Membrane (flashing)''']]: Granule-surfaced membrane, installed following the standards published in '''Part 11'''.
+
;(10)[[SBS Roof Systems Standard#PART_10|'''Cap Membrane (flashing)''']]: Granule-surfaced membrane, installed following the standards published in '''Part 11'''.
  
 
<hr>
 
<hr>
  
 
=== RELATED WORK BY OTHERS ===
 
=== RELATED WORK BY OTHERS ===
;(A) [[SBS Roof Systems Standard#SBSDECKS|'''Acceptable Supporting Deck Structure''']]
+
;(A) [[SBS Roof Systems Standard#PART_2|'''Acceptable Supporting Deck Structure''']]
 
;(B) Fibreglass insulation: Cavity fill, to inhibit condensation inside the flashing.
 
;(B) Fibreglass insulation: Cavity fill, to inhibit condensation inside the flashing.
  
Line 57: Line 59:
 
<hr>
 
<hr>
  
[[SBS Roof System Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''SBS-modified Bitumen Membrane Roof System Details'']]
+
[[SBS Roof System Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''"SBS" Roof System Details'']]
  
 
[[Main Page | <i class="fa fa-home fa"></i> Home]]
 
[[Main Page | <i class="fa fa-home fa"></i> Home]]
  
 
{{Tempate:RPM Page Footer with Copyright and Current Date}}
 
{{Tempate:RPM Page Footer with Copyright and Current Date}}

Revision as of 18:29, 27 June 2022



Division D - Construction Details


SBS | 2-Part Retrofit Flashing (Cable Penetration) ( Article 12.3.2.1.)

Notice to Reader
Images used in a Construction Detail are representative and not prescriptive, and are not necessarily drawn to scale. They are intended to support the related Standard (Ref. Division A, Article 2.2.1.2.).

The reader may link to the related Article in the detail title, or link to the Standard as it relates to a specific element in the detail. All hyperlinks are displayed blue text.

SBS Details

SBS 11.3.3.3-2 2-Part Cable 1.jpg

SBS 11.3.3.3-2 2-Part Cable 2.jpg

Click below for a printable version of this page (under development)
Print Sheet

1 WORK INCLUDED

(1) Supporting Deck Overlay
Optional, depending upon deck condition and roof system requirements.
(2) Air or Vapour Control Layer
Installed following the requirements of Part 6 in this Standard. Tie in the control layers with membranes installed by other trades, to preserve continuity of the building enclosure (2a).
(3) Insulation
Installed in staggered and offset layers, and secured in accordance with the design of the system, which is based on the British Columbia Building Code, Part 4 and Part 5, and on Part 3 of the RoofStar Guarantee Standards for the membrane system type.
(4) Insulation Overlay
Subject to the requirements of Part 8 in the RoofStar Guarantee Standards for the membrane system type.
(5) Field Membrane (field)
Mechanically attached, torch-applied, adhered (shown) or self-adhered. See Tables 9.1 for acceptable membrane types and securement options. See 9.3 for application requirements.
(6) Two-part Penetration Cable Flashing
May be proprietary or shop-fabricated from galvanized sheet metal, consisting of two parts that are riveted together in the field, secured to the roof assembly and then ‘stripped’ into the field membrane to waterproof the flashing. This type of flashing may be adapted in its design to accommodate a pipe that turns horizontally to the roof field plane. The exit point for the penetration must be shielded with a hood and sloped downward to shed water. Secure separate lid with screw-type fasteners.
See 11.2.3 Curbs and Penetration Flashings for fabrication standards.
(7) Mastic
Applied to area receiving metal penetration flashing. See 11.3.3.1 (12)(1).
(8) Base Membrane Flashing (target patch)
Cut from a single piece of self-adhering or torch-applied base membrane material, it is fashioned with a hole to fit around the penetration flashing and is sealed to the flashing and the roof field. The target patch must cover the flashing flange and extend beyond the edge of the flange, onto the field base membrane, by at least 100 mm (4”). See 11.3.3.1 (12) for all applicable standards.
(9) Cap Membrane (field)
Granule-surfaced membrane. See Tables 9.1 and 9.2 for acceptable cap membrane types and their securement options. See 9.3 for application requirements.
(10)Cap Membrane (flashing)
Granule-surfaced membrane, installed following the standards published in Part 11.

2 RELATED WORK BY OTHERS

(A) Acceptable Supporting Deck Structure
(B) Fibreglass insulation
Cavity fill, to inhibit condensation inside the flashing.


NOTE: See the Standard for additional requirements.


Back to "SBS" Roof System Details

Home

© RCABC 2024
No reproduction of this material, in whole or in part, is lawful without the expressed permission of the RCABC Guarantee Corp.