SBS Basic Curb

Jump to: navigation, search

SBS Basic Curb

Revision as of 23:52, 23 December 2015 by James Klassen (talk | contribs) (Created page with "<hr> File:D1.7.4.jpg === WORK INCLUDED === ;(1) Gypsum Board: :Required when insulation is too thin to span flutes of steel decking (See <i>RGC Guarantee Standard A2.5<...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

D1.7.4.jpg


1 WORK INCLUDED

(1) Gypsum Board
Required when insulation is too thin to span flutes of steel decking (See RGC Guarantee Standard A2.5) or when required as thermal barrier by design authority.
(2) Vapor Retarder
If required by design authority.
(3) Insulation
Mechanically fastened. (See Section 2.2 for accepted materials). (See Section 2.1.1 RGC Guarantee Standard A4.4).
(4) Overlay Board
Asphalt adhered or mechanically fastened. Two layers required over heat-sensitive insulation. (See RGC Guarantee Standard C4.1)
(5) Base Sheet
Adhered to overlay board using asphalt, cold adhesive, self-adhered, mechanical attachment or torch applied according to manufacturer’s specification and to RGC Guarantee Standards. Torching directly to wood surfaces is not permitted.
(6) Base Sheet Flashing
Adhered according to manufacturer’s specifications, using cold adhesive, self-adhered, or torch applied to cover boards, or mechanically attached membrane. Torching directly to wood surfaces is not permitted. (See RGC Guarantee Standards Section 2.1.1, A5.6, and Section 2.1.3, C8.5).
(7) Cap Sheet
Applied according to manufacturer’s printed instructions and to RGC Guarantee Standards.
(8) Cap Sheet Flashing
Applied according to manufacturer’s printed instructions and to RGC Guarantee Standards to top of curb.
(9) Metal Flashing
As required by RGC standards. (See RGC Guarantee Standard A6.9 and A6.10)


2 RELATED WORK BY OTHERS

(A) Acceptable Deck
(B) Vapor Retarder
(C) Wood Blocking
Minimum 200 mm (8") in height. (See asphalt adhered or mechanically fastened. Two layers required over heat-sensitive insulation. (See RGC Guarantee Standard A5.6.2) Cant is optional.

NOTE: Refer to RGC Guarantee Standards for additional requirements.



Back to SBS Application

Back to SBS Construction Details

Back to Construction Details