Difference between revisions of "SBS Canted Edge"

Jump to: navigation, search

Difference between revisions of "SBS Canted Edge"

(RELATED WORK BY OTHERS)
Line 29: Line 29:
  
  
[[Section:D. Application: Low Slope Roofs|<i class="fa fa-chevron-circle-left fa-2x" ></i> Back to ''SBS Application'']]
+
[[Section:D. Application: Low Slope Roofs|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''SBS Application'']]
  
[[SBS Construction Details|<i class="fa fa-chevron-circle-left fa-2x" ></i> Back to ''SBS Construction Details'']]
+
[[SBS Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''SBS Construction Details'']]
  
[[Section:G. Construction Details|<i class="fa fa-chevron-circle-left fa-2x" ></i> Back to ''Construction Details'']]
+
[[Section:G. Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''Construction Details'']]

Revision as of 17:46, 8 August 2016

File:D1.7.2.1.jpg

File:D1.7.2.2.jpg


1 WORK INCLUDED

(1) Vapour Retarder
If required by design authority.
(2) Insulation
Mechanically fastened where deck type permits. See available insulation products in the Accepted Materials section of this Manual.
(3) Insulation Overlay Board
Asphalt adhered or mechanically fastened. Two layers required over heat-sensitive insulation.
(4) Base Sheet
Adhered to overlay board using asphalt, cold adhesive, self-adhered, mechanical attachment or torch applied according to manufacturer's specification. Torching directly to wood surfaces is not permitted.
(5) Base Sheet Flashing
Adhered according to manufacturer's specifications, using cold adhesive, hot asphalt self-adhered or torch applied to cover boards, or mechanically attached membrane. Must be carried over to outside of fascia. Torching directly to wood surfaces is not permitted. See also 10.3.6 Cant Strips.
(6) Cap Sheet
Applied according to manufacturer's printed instructions and RoofStar Guarantee Standards.
(7) Cap Sheet Flashing
Applied according to manufacturer's printed instructions and RoofStar Guarantee Standards up to the top of cant.
(8) Metal Flashing
As required by RoofStar Guarantee Standards.

2 RELATED WORK BY OTHERS

(A) Acceptable Deck
Smooth, dry and clean.
(B) Fascia
Optional.
(C) Wood Blocking
Equal to height of insulation and overlay board, primed wherever in contact with asphalt.


NOTE: Refer to RoofStar Guarantee Standards for additional requirements.




Back to SBS Application

Back to SBS Construction Details

Back to Construction Details