SBS Fall Protection Anchor in Roof

Jump to: navigation, search

SBS Fall Protection Anchor in Roof

Revision as of 17:54, 27 August 2021 by James Klassen (talk | contribs)


RoofStar Guarantee Standards are blue-linked
SBS Details

10.3.7.1.jpg

1 WORK INCLUDED

(1) Flashing
0.08 mm (0.032", 20 gauge) Aluminum or 0.56 mm (16 oz) copper to CSA B272-93 flashing supplied by anchor manufacturer with flanges sealed by roofer.
(2) Flashing Flange
minimum 100 mm (4") flange set in coating of compatible sealant.
(3) Primary Membrane and Membrane Flashing.
(4) Protected Membrane Roof Assembly
Flashing to extend a minimum 200 mm (8") above finished roof surface (pavers, ballast, or walkways). See [[SBS Roof Systems Standard#SBSPMRAMEMBRANE | 12.1.3.2 Membranes for specific Application requirements.
(5) Conventional Roof Assembly
Flashing to extend a minimum 200 mm (8") above finished roof surface. See membrane flashing requirements under 10.3 Application.
(6) Insulation
See available insulation products in the Accepted Materials section of this Manual.

2 WORK BY OTHERS

(A) Acceptable Supporting Deck Structure
Concrete slab shown, see anchor manufacturer's attachment details for other deck types.
(B) Roof Anchor
Anchor selection and attachment details are the responsibility of the Design Authority
(C) Anchor Eye
(D) Water Tight Cap

NOTE: See the Standard for additional requirements.


Back to RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies

Back to SBS Modified Bitumen Construction Details

© RCABC 2024
No reproduction of this material, in whole or in part, is lawful without the expressed permission of the RCABC Guarantee Corp.