Difference between revisions of "SBS Flanged Insert Drain"

Jump to: navigation, search

Difference between revisions of "SBS Flanged Insert Drain"

Line 28: Line 28:
 
;(A) [[SBS Roof Systems Standard#SBSDECKS|'''Acceptable Supporting Deck Structure''']]
 
;(A) [[SBS Roof Systems Standard#SBSDECKS|'''Acceptable Supporting Deck Structure''']]
 
;(B) [[SBS Roof Systems Standard#SBSSPUNDRAINMATERIALS|'''Roof Drain Assembly''']]
 
;(B) [[SBS Roof Systems Standard#SBSSPUNDRAINMATERIALS|'''Roof Drain Assembly''']]
 +
 +
* Leader size is determined by using the calculation found in the BC Building Code at Appendix P.7.4.10 and Section 7.4.10.11 (Section 7.4.10.10 for gutters) in conjunction with the 15-minute rainfall value from the National Building Code, Appendix C.
 
</div><!-- COL-6-MD -->
 
</div><!-- COL-6-MD -->
 
</div><!-- PANEL BODY -->
 
</div><!-- PANEL BODY -->
 
</div><!-- PANEL -->
 
</div><!-- PANEL -->
  
'''NOTE''': Refer to '''''RoofStar Guarantee Standards''''' for additional requirements.
+
'''NOTE''': See the [[SBS Roof Systems Standard | '''Standard''']] for additional requirements.
* Leader size is determined by using the calculation found in the BC Building Code at Appendix P.7.4.10 and Section 7.4.10.11 (Section 7.4.10.10 for gutters) in conjunction with the 15-minute rainfall value from the National Building Code, Appendix C.
 
  
 
<hr>
 
<hr>
 
  
 
[[SBS Roof Systems Standard|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies'']]
 
[[SBS Roof Systems Standard|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies'']]
  
 
[[SBS Roof System Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''SBS Modified Bitumen Construction Details'']]
 
[[SBS Roof System Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''SBS Modified Bitumen Construction Details'']]
 +
 +
{{Tempate:RPM Page Footer with Copyright and Current Date}}

Revision as of 17:26, 27 August 2021

RoofStar Guarantee Standards are blue-linked
SBS Details

10.3.6.2.jpg

1 WORK INCLUDED

(1) Supporting Deck Overlay
If required by design authority.
(2) Air or Vapour Control Layers
If required by design authority.
(3) Insulation
See available insulation products in the Accepted Materials section of this Manual.
(4) Insulation Overlay
Where required.
(5) Primary Membrane and Membrane Protection
(6) Mastic
As approved by manufacturer.
(7) Roof Drain Membrane Flashing
Onto primed drain flange or adhesive for non-bituminous flexible membrane systems. See also 11.2.1 General for membrane material requirements.

2 RELATED WORK BY OTHERS

(A) Acceptable Supporting Deck Structure
(B) Roof Drain Assembly
  • Leader size is determined by using the calculation found in the BC Building Code at Appendix P.7.4.10 and Section 7.4.10.11 (Section 7.4.10.10 for gutters) in conjunction with the 15-minute rainfall value from the National Building Code, Appendix C.

NOTE: See the Standard for additional requirements.


Back to RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies

Back to SBS Modified Bitumen Construction Details

© RCABC 2024
No reproduction of this material, in whole or in part, is lawful without the expressed permission of the RCABC Guarantee Corp.