Difference between revisions of "SBS Flanged Insert Drain"

Jump to: navigation, search

Difference between revisions of "SBS Flanged Insert Drain"

Line 6: Line 6:
 
<big><big>Division D - Construction Details</big></big>
 
<big><big>Division D - Construction Details</big></big>
 
<hr>
 
<hr>
<big><big><big><big><big>SBS 11.3.2.4-1 Flange-style Drains (typical)</big></big></big></big></big>
+
<big><big><big><big><big>SBS | Flanged Insert Drain ([[SBS_Roof_Systems_Standard#11.3.3.6._Flanged_Insert-type_Roof_Drains | Article 11.3.3.6.]])</big></big></big></big></big>
 
{| class="wikitable" | style="color: black; background-color: orange; width: 100%;text-align:center"
 
{| class="wikitable" | style="color: black; background-color: orange; width: 100%;text-align:center"
 
| colspan="2"  | <big>'''''Notice to Reader'''''</big>
 
| colspan="2"  | <big>'''''Notice to Reader'''''</big>

Revision as of 17:44, 27 June 2022



Division D - Construction Details


SBS | Flanged Insert Drain ( Article 11.3.3.6.)

Notice to Reader
Images used in a Construction Detail are representative and not prescriptive. Nor are they necessarily drawn to scale. Rather, they are provided to visually convey the requirements of the Standard they represent. Unless otherwise required by the Standard, dimensions, the selection of materials and their application remains the responsibility of the Design Authority.

The full text of the referenced requirements in the Standard may be read by using the blue hyperlinks
SBS Details

10.3.6.2.jpg

1 WORK INCLUDED

(1) Supporting Deck Overlay
If required by design authority.
(2) Air or Vapour Control Layers
If required by design authority.
(3) Insulation
See available insulation products in the Accepted Materials section of this Manual.
(4) Insulation Overlay
Where required.
(5) Primary Membrane and Membrane Protection
(6) Mastic
As approved by manufacturer.
(7) Roof Drain Membrane Flashing
Onto primed drain flange or adhesive for non-bituminous flexible membrane systems. See also 11.2.1 General for membrane material requirements.

2 RELATED WORK BY OTHERS

(A) Acceptable Supporting Deck Structure
(B) Roof Drain Assembly
  • Leader size is determined by using the calculation found in the BC Building Code at Appendix P.7.4.10 and Section 7.4.10.11 (Section 7.4.10.10 for gutters) in conjunction with the 15-minute rainfall value from the National Building Code, Appendix C.

NOTE: See the Standard for additional requirements.


Back to "SBS" Roof System Details

Home

© RCABC 2024
No reproduction of this material, in whole or in part, is lawful without the expressed permission of the RCABC Guarantee Corp.