(RELATED WORK BY OTHERS)
Line 39: Line 39:
 
;(D) '''Wood Blocking'''
 
;(D) '''Wood Blocking'''
 
;(E) '''Flexible Insulation'''  
 
;(E) '''Flexible Insulation'''  
;(C) [[RoofStar Guarantee Standards for SBS Roof Systems#SBSSLOPEDWOODBLOCKING|'''Sloped Wood Blocking''']]: Required over 100 mm (4") parapet width.
+
;(F) [[RoofStar Guarantee Standards for SBS Roof Systems#SBSSLOPEDWOODBLOCKING|'''Sloped Wood Blocking''']]: Required over 100 mm (4") parapet width.
 
</div><!-- COL-6-MD -->
 
</div><!-- COL-6-MD -->
 
</div><!-- PANEL BODY -->
 
</div><!-- PANEL BODY -->

Revision as of 22:59, 17 January 2017

RoofStar Guarantee Standards are blue-linked
SBS Details

10.3.1.2.jpg


Click below for a printable version of this page.
Print Sheet

1 WORK INCLUDED

(1) Gypsum Deck Overlay
(2) Vapour Retarder
If required by design authority.
(3) Insulation
(4) Insulation Overlay Board
As required.
(5) Primary Membrane and Membrane Protection
(6) Membrane Flashing
Mechanically fasten to outside face of parapet blocking (F). Do not mop outside edge. At least one ply must extend over outside edge.
(7) Metal Base Flashing
Optional on flexible membrane systems. Required on assemblies using gravel ballast filter mats. See Section 13.6 - Cap Flashings, Base Flashings and Reglets.
(8) Metal Cap Flashing
Flashings 7 and 8 may be one piece. See Section 14. Fasten with continuous concealed clip-type fasteners or cladding screws evenly spaced between seams. See Section 13.3 - Attachment.

2 RELATED WORK BY OTHERS

(A) Acceptable Deck
(B) Air / Vapour Seal
(C) Acceptable Wall Surface
(D) Wood Blocking
(E) Flexible Insulation
(F) Sloped Wood Blocking
Required over 100 mm (4") parapet width.

NOTE: Refer to RoofStar Guarantee Standards for additional requirements.




Back to RoofStar Guarantee Standards for SBS Roof Systems

Back to SBS Construction Details

Back to Construction Details