Difference between revisions of "SBS Through-wall Scupper Drain"

Jump to: navigation, search

Difference between revisions of "SBS Through-wall Scupper Drain"

(No difference)

Revision as of 18:19, 16 September 2016

RoofStar Guarantee Standards are blue-linked
SBS Details

10.3.6.5.jpg

1 WORK INCLUDED

(1) Vapour Retarder
If required by design authority.
(2) Insulation
See available insulation products in the Accepted Materials section of this Manual.
(3) Insulation Overlay Board
Where required.
(4) Primary Membrane and Membrane Protection
(5) Base Sheet Flashing
(6) Metal Scupper with Hopper
The outside face of scupper to be minimum 37.7mm (1½") lower than the box height with a 12.7mm (½") drip edge. Installed in a bed of compatible mastic. Interface between outside wall and scupper should be caulked with appropriate sealant. Installed when wall finish is complete prior to completion of roofing or sheet metal (e.g.: re-roofing).
(7) Mastic
Compatible with membrane
(8) Scupper Membrane Flashing
(9) Base Metal Flashing
Mechanically fastened (optional on flexible membrane systems).
(10) Metal Counter-flashing
Into reglet approximately 30 mm (1 ¼").

2 RELATED WORK BY OTHERS

(A) Acceptable Deck
(B) Air / Vapour Seal
(C) Wood Blocking
Optional with insulation cant strips.
(D) Plywood
If required by design authority. See the RoofStar Guarantee Standards.
(E) Wall Finish
Interface between outside wall and scupper to be caulked with appropriate sealant. Installed by trade responsible for outside wall finish if roofing and metal flashing has been completed prior to exterior wall finish.

NOTE: Refer to RoofStar Guarantee Standards for additional requirements.




Back to SBS Application

Back to SBS Construction Details

Back to Construction Details