Search results

Jump to: navigation, search

Search results

Page title matches

  • :{{hilite | In this Manual, “overburden” denotes any manner of material, equipment or installation that is situated on top of, and covering all or a portion o :* {{hilite | equipment and/or installations, other than those mounted on curbs or structural mount
    22 KB (3,002 words) - 14:56, 25 September 2017

Page text matches

  • * Concrete decks, curbs and equipment pads must be clean, dry, and smooth prior to commencement of roofing. ...rane roofs utilizing bitumen as an adhesive and / or waterproofing medium (BUR, single or multi-ply modified bitumen or oxidized asphalt sheet systems (mo
    0 members (0 subcategories, 0 files) - 16:30, 23 June 2015
  • * As-built BUR specification(s) and applicable addenda. * Roof plan(s) showing location of all penetrations and rooftop equipment.
    75 KB (11,617 words) - 21:00, 3 September 2021
  • ...y contact with a moving abrasive surface, such as foot traffic, mechanical equipment, wind-blown particles, etc. :(<b>Abbreviation: BUR</b>.)
    76 KB (11,565 words) - 18:09, 26 January 2024
  • :{{hilite | In this Manual, “overburden” denotes any manner of material, equipment or installation that is situated on top of, and covering all or a portion o :* {{hilite | equipment and/or installations, other than those mounted on curbs or structural mount
    22 KB (3,002 words) - 14:56, 25 September 2017