TPO Conventionally Insulated System (Alternate)

Jump to: navigation, search

TPO Conventionally Insulated System (Alternate)

Revision as of 21:37, 27 June 2022 by James Klassen (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)



Division D - Construction Details


TPO | Conventionally Insulated System (Alternate) ( Article 1.1.3.1.)

Notice to Reader
Images used in a Construction Detail are representative and not prescriptive, and are not necessarily drawn to scale. They are intended to support the related Standard (Ref. Division A, Article 2.2.1.2.).

The reader may link to the related Article in the detail title, or link to the Standard as it relates to a specific element in the detail. All hyperlinks are displayed blue text.

TPO Details

6.3.2.1.jpg

1 WORK INCLUDED

(1) Vapour Retarder
If required by design authority.
(2) Insulation
Mechanically fastened where deck type permits, or fully adhered (as illustrated). Installed according to RoofStar Guarantee Standards. See available insulation products in the Accepted Materials section of this Manual.
(3) Adhesive
Proprietary, installed according to manufacturer’s instructions, usually brushed, rolled or sprayed (3A: 2- part low rising insulation adhesive, specifically used to bond insulation and cover boards)
(4) Single-ply Membrane
Installed according to manufacturer’s instructions and RoofStar Guarantee Standards.
(5) Membrane Lap
Thermoplastic membrane may be welded or chemically bonded.
(6) Edge Flashing
Proprietary, coated with membrane material and heat-welded to the primary (field) membrane.
(7) Fascia Flashing Clip
Affixed to the fascia material (installed by others) with fasteners O.C. 300 mm (12”).
(8) Fascia Flashing
Manufactured to RoofStar Guarantee Standards for sheet metal flashings.
(9) Membrane Flashing
Adhered according to manufacturer’s printed specifications using proprietary adhesive. Must be carried to the outside of the parapet or vertically to a minimum of 200 mm (8”) above the finished roof surface. Welded or adhered to primary membrane depending on membrane type.

2 RELATED WORK BY OTHERS

(A) Acceptable Deck
(B) Acceptable Parapet Surface
Surface must be smooth, dry and clean. Rough surface must be covered with treated plywood, to be determined by design authority or inspector or as required by manufacturer.
(C) Edge Blocking
(D) Fascia Material

NOTE: See the Standard for additional requirements.


Back to TPO Construction Details

Home

© RCABC 2024
No reproduction of this material, in whole or in part, is lawful without the expressed permission of the RCABC Guarantee Corp.