Difference between revisions of "TS Details:E4.7.1 (Tile - Hips & Ridges)"

Jump to: navigation, search

Difference between revisions of "TS Details:E4.7.1 (Tile - Hips & Ridges)"

Line 27: Line 27:
  
  
 
+
[[RoofStar Guarantee Standards for Tile & Slate Roof Assemblies|<i class="fa fa-chevron-circle-left fa" ></i> RoofStar Guarantee Standards for Tile & Slate Roof Assemblies]]
[[RoofStar Guarantee Standards for Tile & Slate Roof Systems|<i class="fa fa-chevron-circle-left fa" ></i> RoofStar Guarantee Standards for Tile & Slate Roof Systems]]
 
  
 
[[Tile and Slate Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''Tile and Slate Construction Details'']]
 
[[Tile and Slate Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''Tile and Slate Construction Details'']]
  
[[Section:G. Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''Construction Details'']]
+
[[Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''Construction Details'']]

Revision as of 18:09, 23 October 2017

Ridge and hip tiles are applied after the field tiles are terminated against the nailer board. A sealant, mortar or plaster cement should be applied to the tops of the field tile and between laps of the ridge / hip tile. This prevents entry of wind driven rain or snow.

Tiles are started at the low end of hips or the leeward end of ridges. Each tile is nailed through the hole provided into the nailer. The lap of the next tile covers the nail. The last ridge tile nails will have to be caulked.

RoofStar Guarantee Standards are blue-linked
Tile Roofing Details

7.3.2.2.12.jpg

7.3.2.2.13.jpg




RoofStar Guarantee Standards for Tile & Slate Roof Assemblies

Back to Tile and Slate Construction Details

Back to Construction Details