Difference between revisions of "WP Details:F1.7.12 (Deck Drain - Unit Masonry on Pedestal Supports)"

Jump to: navigation, search

Difference between revisions of "WP Details:F1.7.12 (Deck Drain - Unit Masonry on Pedestal Supports)"

(WORK INCLUDED)
Line 12: Line 12:
 
(1) <b>Membrane Primer or Adhesive: </b>proprietary primer or adhesive, application method and quantities for substrate type as directed by membrane manufacturer's published application specifications.  
 
(1) <b>Membrane Primer or Adhesive: </b>proprietary primer or adhesive, application method and quantities for substrate type as directed by membrane manufacturer's published application specifications.  
  
(2) <b>Primary Waterproofing Membrane: </b>Fully adhered to acceptable substrates (concrete slab shown), installed as per <i>RoofStar Guarantee
+
(2) <b>Primary Waterproofing Membrane: </b>Fully adhered to acceptable substrates (concrete slab shown), installed as per {{hilite | <i>RoofStar Guarantee
Standards E </i>and Membrane Manufacturer's installation specifications.<b> </b>
+
Standards E </i> || 2016-November-19 }} and Membrane Manufacturer's installation specifications.<b> </b>  
 
 
(3) <b>Protection Board/Mat: </b>Proprietary membrane protection board or mat approved by membrane manufacturer, compatible with waterproofing membrane system, and compliant with RGC Guarantee Standards <b>E.</b>  
 
  
 +
(3) <b>Protection Board/Mat: </b>Proprietary membrane protection board or mat approved by membrane manufacturer, compatible with waterproofing membrane system, and compliant with {{hilite | RGC Guarantee Standards <b>E.</b>
 +
|| 2016-November-19 }}
 
(4) <b>Insulation</b>: Type 4 extruded polystyrene insulation
 
(4) <b>Insulation</b>: Type 4 extruded polystyrene insulation
  
 
(5) <b>Filter Mat: </b>synthetic water permeable fabric.
 
(5) <b>Filter Mat: </b>synthetic water permeable fabric.
 
  
 
=== WORK BY OTHERS ===
 
=== WORK BY OTHERS ===

Revision as of 21:54, 19 August 2016

Waterproofing Details for Plazas, Promenades and Terraces

9.6.12.jpg

1 WORK INCLUDED

(1) Membrane Primer or Adhesive: proprietary primer or adhesive, application method and quantities for substrate type as directed by membrane manufacturer's published application specifications.

(2) Primary Waterproofing Membrane: Fully adhered to acceptable substrates (concrete slab shown), installed as per RoofStar Guarantee Standards E and Membrane Manufacturer's installation specifications.

(3) Protection Board/Mat: Proprietary membrane protection board or mat approved by membrane manufacturer, compatible with waterproofing membrane system, and compliant with RGC Guarantee Standards E. (4) Insulation: Type 4 extruded polystyrene insulation

(5) Filter Mat: synthetic water permeable fabric.

2 WORK BY OTHERS

(A) Acceptable Deck: Concrete slab shown (B) Drain Assembly: Proprietary cast iron waterproofing/roof drain assembly

(C) Pedestals Proprietary paver pedestals designed to carry predicted live loads and accepted by the insulation manufacturer.

(D) Concrete Paver

NOTE: Refer to RoofStar Guarantee Standards for additional requirements.




Back to Waterproofing Application

Back to Waterproofing Construction Details

Back to Construction Details