Difference between revisions of "ASM Eave Protection and Underlayment"
Difference between revisions of "ASM Eave Protection and Underlayment"
(→RELATED WORK BY OTHERS) |
|||
Line 38: | Line 38: | ||
− | [[ | + | [[RoofStar Guarantee Standards for ASM Roof Systems|<i class="fa fa-chevron-circle-left fa" ></i> RoofStar Guarantee Standards for ASM Roof Systems]] |
[[Architectural Sheet Metal Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''ASM Construction Details'']] | [[Architectural Sheet Metal Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''ASM Construction Details'']] | ||
[[Section:G. Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''Construction Details'']] | [[Section:G. Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''Construction Details'']] |
Revision as of 18:41, 25 October 2016
RoofStar Guarantee Standards are blue-linked |
ASM Details
1 WORK INCLUDED
- (1) Underlayment
- Proprietary underlayment installed perpendicular to the slope with 50 mm (2") minimum side laps and 100 mm (4") minimum end laps.
- (2) Ice and Water Protection
- One ply of accepted self-adhered modified bituminous membrane.
- (3) Edge Metal Flashing
- Installed to manufacturer's printed instructions.
- Note:
- This specification is only applicable to slopes 1:3 (4" in 12") or greater
- Slip sheet not shown for clarity
2 RELATED WORK BY OTHERS
- (A) Acceptable Deck
NOTE: Refer to RoofStar Guarantee Standards for additional requirements.
RoofStar Guarantee Standards for ASM Roof Systems