Difference between revisions of "ASM Valley (Unhooked)"

Jump to: navigation, search

Difference between revisions of "ASM Valley (Unhooked)"

Line 37: Line 37:
  
  
 
+
[[RoofStar Guarantee Standards for ASM Roof Systems|<i class="fa fa-chevron-circle-left fa" ></i> RoofStar Guarantee Standards for ASM Roof Systems]]
[[Section:E. Application: Steep Slope Roofs|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''ASM Application'']]
 
  
 
[[Architectural Sheet Metal Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''ASM Construction Details'']]
 
[[Architectural Sheet Metal Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''ASM Construction Details'']]
  
 
[[Section:G. Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''Construction Details'']]
 
[[Section:G. Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''Construction Details'']]

Revision as of 18:42, 25 October 2016

RoofStar Guarantee Standards are blue-linked
ASM Details

8.1.4.6.1.jpg

1 WORK INCLUDED

(1) Valley Protection Membrane
Accepted self-adhered modified bituminous eave protection membrane.
(2) Underlayment
The type of underlay required is determined by roof slope.
(3) Slip Sheet
Recommended over asphaltic underlays and / or as required by metal roof panel manufacturer.
(4) Valley Metal Panel
Preformed with centre rib.
(5) Metal Panel Clip
Installed to metal roof panel manufacturer's printed instructions.
(6) Pre-formed Closures
Two rows set in accepted caulking.
(7) Architectural Metal Roof Panel
(8) Valley Panel Overlap
Overlaps minimum 200 mm (8") sealed with two rows of accepted caulking and drag load fasteners.

2 RELATED WORK BY OTHERS

(A) Acceptable Deck

NOTE: Refer to RoofStar Guarantee Standards for additional requirements.




RoofStar Guarantee Standards for ASM Roof Systems

Back to ASM Construction Details

Back to Construction Details