Difference between revisions of "ASM 10.4.4 Ridge (Snap Seam, Notched)"

Jump to: navigation, search

Difference between revisions of "ASM 10.4.4 Ridge (Snap Seam, Notched)"

Line 37: Line 37:
  
  
[[Section:E. Application: Steep Slope Roofs|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''ASM Application'']]
+
[[RoofStar Guarantee Standards for ASM Roof Systems|<i class="fa fa-chevron-circle-left fa" ></i> RoofStar Guarantee Standards for ASM Roof Systems]]
  
 
[[Architectural Sheet Metal Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''ASM Construction Details'']]
 
[[Architectural Sheet Metal Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''ASM Construction Details'']]
  
 
[[Section:G. Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''Construction Details'']]
 
[[Section:G. Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''Construction Details'']]

Revision as of 18:45, 25 October 2016

RoofStar Guarantee Standards are blue-linked
ASM Details

8.1.4.12.1.jpg

1 WORK INCLUDED

(1) Underlayment
The type of underlay required is determined by roof slope.
(2) Insulation Overlay Protection
Recommended.
(3) Architectural Metal Roof Panel 
Turn up (bread panned) at termination.
(4) 'Z'-Bar
Installed to meet adequate attachment for UL I-90 wind uplift requirements.
(5) Insulation
Installed between ‘Z’ bars or wood battens on 600 mm (24") centres.
(6) Pre-formed Foam Closures
Set in accepted caulking.
(7) Exposed Fasteners
High domed, gasketed cladding type screws compatible with metal roof panel.
(8) Metal Cap Flashing
Joints overlapped 100 mm (4") minimum, sealed with two rows of accepted caulking. Exposed edges must be turned under 12.7 mm (1/2").
(9) Drag-load Fasteners
Compatible non-corrosive fasteners.

2 RELATED WORK BY OTHERS

(A) Acceptable Deck

NOTE: Refer to RoofStar Guarantee Standards for additional requirements.



RoofStar Guarantee Standards for ASM Roof Systems

Back to ASM Construction Details

Back to Construction Details