=== WORK INCLUDED ===
 
=== WORK INCLUDED ===
  
;(1) [[RoofStar Guarantee Standards for SBS Roof Systems#SBSSUBSTRATES|'''Gypsum Deck Overlay''']]: If required by design authority.
+
;(1) [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#SBSSUBSTRATES|'''Gypsum Deck Overlay''']]: If required by design authority.
;(2) [[RoofStar Guarantee Standards for SBS Roof Systems#SBSVAPOUR|'''Vapour Retarder''']]: If required by design authority.
+
;(2) [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#SBSVAPOUR|'''Vapour Retarder''']]: If required by design authority.
;(3) [[RoofStar Guarantee Standards for SBS Roof Systems#SBSINSULATION|'''Insulation''']]: See available insulation products in the [[Roof Deck Insulation|'''Accepted Materials''']] section of this Manual.
+
;(3) [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#SBSINSULATION|'''Insulation''']]: See available insulation products in the [[Roof Deck Insulation|'''Accepted Materials''']] section of this Manual.
;(4) [[RoofStar Guarantee Standards for SBS Roof Systems#SBSINSULATIONOVERLAY|'''Insulation Overlay Board''']]: As required.  
+
;(4) [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#SBSINSULATIONOVERLAY|'''Insulation Overlay Board''']]: As required.  
;(5) [[RoofStar Guarantee Standards for SBS Roof Systems#SBSBASE|'''Primary Membrane and Membrane Protection''']]
+
;(5) [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#SBSBASE|'''Primary Membrane and Membrane Protection''']]
;(6) [[RoofStar Guarantee Standards for SBS Roof Systems#SBS-STRIPPING|'''Base Sheet Flashing''']]: Mechanically fasten to parapet at termination.
+
;(6) [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#SBS-STRIPPING|'''Base Sheet Flashing''']]: Mechanically fasten to parapet at termination.
;(7) [[RoofStar Guarantee Standards for SBS Roof Systems#METALCAP-SBS|'''Base Metal Flashing''']]:  Optional on flexible membrane systems. Required on assemblies using gravel ballast filter mats.  See '''Section 13.6 - Cap Flashings, Base Flashings and Reglets'''.
+
;(7) [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#METALCAP-SBS|'''Base Metal Flashing''']]:  Optional on flexible membrane systems. Required on assemblies using gravel ballast filter mats.  See '''Section 13.6 - Cap Flashings, Base Flashings and Reglets'''.
;(8) [[RoofStar Guarantee Standards for SBS Roof Systems#METALCAP-SBS|'''Metal Counter Flashing''']]: Minimum 250 mm (10") above roof surface.  
+
;(8) [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#METALCAP-SBS|'''Metal Counter Flashing''']]: Minimum 250 mm (10") above roof surface.  
;(9) [[RoofStar Guarantee Standards for SBS Roof Systems#METALCAP-SBS|'''Metal Cap Flashing''']]: Required whenever the primary roof membrane flashing/stripping is carried over the top of parapet walls. See '''Section 13.6 - Cap Flashings, Base Flashings and Reglets'''.
+
;(9) [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#METALCAP-SBS|'''Metal Cap Flashing''']]: Required whenever the primary roof membrane flashing/stripping is carried over the top of parapet walls. See '''Section 13.6 - Cap Flashings, Base Flashings and Reglets'''.
  
 
<hr>
 
<hr>
Line 36: Line 36:
 
=== RELATED WORK BY OTHERS ===
 
=== RELATED WORK BY OTHERS ===
  
;(A) [[RoofStar Guarantee Standards for SBS Roof Systems#SBSDECKS|'''Acceptable Deck''']]
+
;(A) [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#SBSDECKS|'''Acceptable Deck''']]
 
;(B) '''Air / Vapour Seal'''
 
;(B) '''Air / Vapour Seal'''
;(C) [[RoofStar Guarantee Standards for SBS Roof Systems#SBSWALLSUB|'''Acceptable Wall Surface''']]
+
;(C) [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#SBSWALLSUB|'''Acceptable Wall Surface''']]
 
;(D) '''Wood Blocking'''
 
;(D) '''Wood Blocking'''
;(E) [[RoofStar Guarantee Standards for SBS Roof Systems#SBSSLOPEDWOODBLOCKING|'''Sloped Wood Blocking''']]: Required over 100 mm (4") parapet width.
+
;(E) [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#SBSSLOPEDWOODBLOCKING|'''Sloped Wood Blocking''']]: Required over 100 mm (4") parapet width.
;(F) [[RoofStar Guarantee Standards for SBS Roof Systems#SBS-STRIPPING|'''Wall Sheathing Membrane''']]: Minimum 1 mm (0.040") self-adhered modified bitumen.
+
;(F) [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#SBS-STRIPPING|'''Wall Sheathing Membrane''']]: Minimum 1 mm (0.040") self-adhered modified bitumen.
 
;(G) '''Exterior Wall Finish'''
 
;(G) '''Exterior Wall Finish'''
;(H) [[RoofStar Guarantee Standards for SBS Roof Systems#METALCAP-SBS|'''Metal Cap Flashing''']]: Required by others whenever the primary roof membrane is not carried over top of the parapet and/or when the wall finish is by others. (Unless specified otherwise).
+
;(H) [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#METALCAP-SBS|'''Metal Cap Flashing''']]: Required by others whenever the primary roof membrane is not carried over top of the parapet and/or when the wall finish is by others. (Unless specified otherwise).
;(I) [[RoofStar Guarantee Standards for SBS Roof Systems#SBSCAPFLASHINGUNDERLAY|'''Cap Flashing Underlay''']]:Minimum 1 mm (0.040" or 40 mil) self-adhered modified bitumen.
+
;(I) [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#SBSCAPFLASHINGUNDERLAY|'''Cap Flashing Underlay''']]:Minimum 1 mm (0.040" or 40 mil) self-adhered modified bitumen.
 
</div><!-- COL-6-MD -->
 
</div><!-- COL-6-MD -->
 
</div><!-- PANEL BODY -->
 
</div><!-- PANEL BODY -->

Revision as of 15:59, 23 October 2017

RoofStar Guarantee Standards are blue-linked
SBS Details

10.3.1.3.jpg


Click below for a printable version of this page.
Print Sheet

1 WORK INCLUDED

(1) Gypsum Deck Overlay
If required by design authority.
(2) Vapour Retarder
If required by design authority.
(3) Insulation
See available insulation products in the Accepted Materials section of this Manual.
(4) Insulation Overlay Board
As required.
(5) Primary Membrane and Membrane Protection
(6) Base Sheet Flashing
Mechanically fasten to parapet at termination.
(7) Base Metal Flashing
Optional on flexible membrane systems. Required on assemblies using gravel ballast filter mats. See Section 13.6 - Cap Flashings, Base Flashings and Reglets.
(8) Metal Counter Flashing
Minimum 250 mm (10") above roof surface.
(9) Metal Cap Flashing
Required whenever the primary roof membrane flashing/stripping is carried over the top of parapet walls. See Section 13.6 - Cap Flashings, Base Flashings and Reglets.

2 RELATED WORK BY OTHERS

(A) Acceptable Deck
(B) Air / Vapour Seal
(C) Acceptable Wall Surface
(D) Wood Blocking
(E) Sloped Wood Blocking
Required over 100 mm (4") parapet width.
(F) Wall Sheathing Membrane
Minimum 1 mm (0.040") self-adhered modified bitumen.
(G) Exterior Wall Finish
(H) Metal Cap Flashing
Required by others whenever the primary roof membrane is not carried over top of the parapet and/or when the wall finish is by others. (Unless specified otherwise).
(I) Cap Flashing Underlay
Minimum 1 mm (0.040" or 40 mil) self-adhered modified bitumen.

NOTE: Refer to RoofStar Guarantee Standards for additional requirements.



Back to RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies

Back to SBS Modified Bitumen Construction Details

Back to Construction Details