Difference between revisions of "ASM Valley (Unhooked)"

Jump to: navigation, search

Difference between revisions of "ASM Valley (Unhooked)"

Line 13: Line 13:
 
<div class="col-md-6">
 
<div class="col-md-6">
 
=== WORK INCLUDED ===
 
=== WORK INCLUDED ===
;(1) [[RoofStar Guarantee Standards for ASM Roof Systems#ASMVALLEYMEM |'''Valley Protection Membrane''']]: Accepted self-adhered modified bituminous eave protection membrane.  
+
;(1) [[RoofStar Guarantee Standards for ASM Roof Assemblies#ASMVALLEYMEM |'''Valley Protection Membrane''']]: Accepted self-adhered modified bituminous eave protection membrane.  
;(2) [[RoofStar Guarantee Standards for ASM Roof Systems#ASMUNDERLAYMENT|'''Underlayment''']]: The type of underlay required is determined by roof slope.  
+
;(2) [[RoofStar Guarantee Standards for ASM Roof Assemblies#ASMUNDERLAYMENT|'''Underlayment''']]: The type of underlay required is determined by roof slope.  
;(3) [[RoofStar Guarantee Standards for ASM Roof Systems#ASMSLIP|'''Slip Sheet''']]: Recommended over asphaltic underlays and / or as required by metal roof panel manufacturer.
+
;(3) [[RoofStar Guarantee Standards for ASM Roof Assemblies#ASMSLIP|'''Slip Sheet''']]: Recommended over asphaltic underlays and / or as required by metal roof panel manufacturer.
;(4) [[RoofStar Guarantee Standards for ASM Roof Systems#ASMVALLEYPAN |'''Valley Metal Panel''']]: Preformed with centre rib.
+
;(4) [[RoofStar Guarantee Standards for ASM Roof Assemblies#ASMVALLEYPAN |'''Valley Metal Panel''']]: Preformed with centre rib.
;(5) [[RoofStar Guarantee Standards for ASM Roof Systems#ASMCLIP|'''Metal Panel Clip''']]: Installed to metal roof panel manufacturer's printed instructions.  
+
;(5) [[RoofStar Guarantee Standards for ASM Roof Assemblies#ASMCLIP|'''Metal Panel Clip''']]: Installed to metal roof panel manufacturer's printed instructions.  
;(6) [[RoofStar Guarantee Standards for ASM Roof Systems#ASMCLOSURE |'''Pre-formed Closures''']]: Two rows set in accepted caulking.  
+
;(6) [[RoofStar Guarantee Standards for ASM Roof Assemblies#ASMCLOSURE |'''Pre-formed Closures''']]: Two rows set in accepted caulking.  
;(7) [[RoofStar Guarantee Standards for ASM Roof Systems#ASMPANEL |'''Architectural Metal Roof Panel''']]
+
;(7) [[RoofStar Guarantee Standards for ASM Roof Assemblies#ASMPANEL |'''Architectural Metal Roof Panel''']]
;(8) [[RoofStar Guarantee Standards for ASM Roof Systems#ASMVALOVERLAP |'''Valley Panel Overlap''']]: Overlaps minimum 200 mm (8") sealed with two rows of accepted caulking and drag load fasteners.  
+
;(8) [[RoofStar Guarantee Standards for ASM Roof Assemblies#ASMVALOVERLAP |'''Valley Panel Overlap''']]: Overlaps minimum 200 mm (8") sealed with two rows of accepted caulking and drag load fasteners.  
  
 
<hr>
 
<hr>
  
 
=== RELATED WORK BY OTHERS  ===
 
=== RELATED WORK BY OTHERS  ===
;(A) [[RoofStar Guarantee Standards for ASM Roof Systems#ASMDECK|'''Acceptable Deck''']]
+
;(A) [[RoofStar Guarantee Standards for ASM Roof Assemblies#ASMDECK|'''Acceptable Deck''']]
 
</div><!-- COL-6-MD -->
 
</div><!-- COL-6-MD -->
 
</div><!-- PANEL BODY -->
 
</div><!-- PANEL BODY -->

Revision as of 17:14, 23 October 2017

RoofStar Guarantee Standards are blue-linked
ASM Details

8.1.4.6.1.jpg

1 WORK INCLUDED

(1) Valley Protection Membrane
Accepted self-adhered modified bituminous eave protection membrane.
(2) Underlayment
The type of underlay required is determined by roof slope.
(3) Slip Sheet
Recommended over asphaltic underlays and / or as required by metal roof panel manufacturer.
(4) Valley Metal Panel
Preformed with centre rib.
(5) Metal Panel Clip
Installed to metal roof panel manufacturer's printed instructions.
(6) Pre-formed Closures
Two rows set in accepted caulking.
(7) Architectural Metal Roof Panel
(8) Valley Panel Overlap
Overlaps minimum 200 mm (8") sealed with two rows of accepted caulking and drag load fasteners.

2 RELATED WORK BY OTHERS

(A) Acceptable Deck

NOTE: Refer to RoofStar Guarantee Standards for additional requirements.




RoofStar Guarantee Standards for ASM Roof Systems

Back to ASM Construction Details

Back to Construction Details