=== WORK INCLUDED ===
 
=== WORK INCLUDED ===
  
(1) [[RoofStar Guarantee Standards for Cedar Shakes %26 Shingles Roof Systems#STR-CSEAVE| '''Interrlay''']]: Minimum No. 15 asphalt saturated felt not less than 450 mm (18") shall be laid between courses of cedar shakes starting from a distance equal to double the weather exposure from the butt. On open sheathing top edge of interlay must rest on and be secured to the strapping.
+
(1) [[RoofStar Guarantee Standards for Cedar Shakes %26 Shingles Roof Assemblies#STR-CSEAVE| '''Interrlay''']]: Minimum No. 15 asphalt saturated felt not less than 450 mm (18") shall be laid between courses of cedar shakes starting from a distance equal to double the weather exposure from the butt. On open sheathing top edge of interlay must rest on and be secured to the strapping.
  
 
(2) <b>Final Course</b>: Trim final course to top point of ridge or hip.
 
(2) <b>Final Course</b>: Trim final course to top point of ridge or hip.
Line 20: Line 20:
 
(3) <b>Ridge Underlay</b>: A strip of minimum No. 15 asphalt saturated felt prior to capping.
 
(3) <b>Ridge Underlay</b>: A strip of minimum No. 15 asphalt saturated felt prior to capping.
  
(4) [[RoofStar Guarantee Standards for Cedar Shakes %26 Shingles Roof Systems#STR-CSHIP| '''Ridge Caps''']]: Optional locations for second nail. All ridges and hips shall be of the alternate overlap type and at the same exposure as the field of the roof. Each side shall be fastened with 2 nails not in the same line of grain (staggered). Nails should be longer than the field nails and long enough to penetrate the sheathing a minimum of 20 mm (3/4") or in the case of plywood, completely through the sheathing, <b>OR</b> 1 nail per side and an additional nail through the butt end edge at peak of ridge caps (staples alone are not sufficient).
+
(4) [[RoofStar Guarantee Standards for Cedar Shakes %26 Shingles Roof Assemblies#STR-CSHIP| '''Ridge Caps''']]: Optional locations for second nail. All ridges and hips shall be of the alternate overlap type and at the same exposure as the field of the roof. Each side shall be fastened with 2 nails not in the same line of grain (staggered). Nails should be longer than the field nails and long enough to penetrate the sheathing a minimum of 20 mm (3/4") or in the case of plywood, completely through the sheathing, <b>OR</b> 1 nail per side and an additional nail through the butt end edge at peak of ridge caps (staples alone are not sufficient).
  
 
=== RELATED WORK BY OTHERS ===
 
=== RELATED WORK BY OTHERS ===
Line 28: Line 28:
 
</div><!-- PANEL -->
 
</div><!-- PANEL -->
  
<b>NOTE: </b>• Refer to <i>RGC Guarantee Standards</i> for additional requirements.
+
<b>NOTE: </b>• Refer to '''''RoofStar Guarantee Standards''''' for additional requirements.
  
 
<hr>
 
<hr>
  
  
 
+
[[RoofStar Guarantee Standards for Cedar Shakes & Shingles Roof Assemblies|<i class="fa fa-chevron-circle-left fa" ></i> RoofStar Guarantee Standards for Cedar Shakes & Shingles Roof Assemblies]]
[[RoofStar Guarantee Standards for Cedar Shakes & Shingles Roof Systems|<i class="fa fa-chevron-circle-left fa" ></i> RoofStar Guarantee Standards for Cedar Shakes & Shingles Roof Systems]]
 
  
 
[[Cedar Shakes & Shingles Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''Cedar Shakes & Shingles Construction Details'']]
 
[[Cedar Shakes & Shingles Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''Cedar Shakes & Shingles Construction Details'']]
  
[[Section:G. Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''Construction Details'']]
+
[[Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''Construction Details'']]

Revision as of 18:06, 23 October 2017

RoofStar Guarantee Standards are blue-linked
Cedar Shakes & Shingles Details

7.2.4.2.jpg

1 WORK INCLUDED

(1) Interrlay: Minimum No. 15 asphalt saturated felt not less than 450 mm (18") shall be laid between courses of cedar shakes starting from a distance equal to double the weather exposure from the butt. On open sheathing top edge of interlay must rest on and be secured to the strapping.

(2) Final Course: Trim final course to top point of ridge or hip.

(3) Ridge Underlay: A strip of minimum No. 15 asphalt saturated felt prior to capping.

(4) Ridge Caps: Optional locations for second nail. All ridges and hips shall be of the alternate overlap type and at the same exposure as the field of the roof. Each side shall be fastened with 2 nails not in the same line of grain (staggered). Nails should be longer than the field nails and long enough to penetrate the sheathing a minimum of 20 mm (3/4") or in the case of plywood, completely through the sheathing, OR 1 nail per side and an additional nail through the butt end edge at peak of ridge caps (staples alone are not sufficient).

2 RELATED WORK BY OTHERS

(A) Sheathing: Minimum 19 mm x 89 mm (1" x 4") boards spaced to match exposure of shakes or shingles, though minimum 19 mm x 140 mm (1" x 6") boards are mandatory for 24" shakes. Solid sheathing is also acceptable.

NOTE: • Refer to RoofStar Guarantee Standards for additional requirements.



RoofStar Guarantee Standards for Cedar Shakes & Shingles Roof Assemblies

Back to Cedar Shakes & Shingles Construction Details

Back to Construction Details