Difference between revisions of "TS Details:E4.7.5 (Tile - Curb Flashing)"

Jump to: navigation, search

Difference between revisions of "TS Details:E4.7.5 (Tile - Curb Flashing)"

Line 31: Line 31:
  
  
 
+
[[RoofStar Guarantee Standards for Tile & Slate Roof Assemblies|<i class="fa fa-chevron-circle-left fa" ></i> RoofStar Guarantee Standards for Tile & Slate Roof Assemblies]]
[[RoofStar Guarantee Standards for Tile & Slate Roof Systems|<i class="fa fa-chevron-circle-left fa" ></i> RoofStar Guarantee Standards for Tile & Slate Roof Systems]]
 
  
 
[[Tile and Slate Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''Tile and Slate Construction Details'']]
 
[[Tile and Slate Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''Tile and Slate Construction Details'']]
  
[[Section:G. Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''Construction Details'']]
+
[[Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''Construction Details'']]

Revision as of 18:12, 23 October 2017

Curb flashings are applied around skylights, chimneys or other larger penetrations. The basic principle is to deflect the water rushing against the uproof side, safely around then on top of the tiles on the down roof side.

The recommended method is to use 3 lb. lead sheeting due to its malleability and, therefore, easy conformance to the tile’s contour.

RoofStar Guarantee Standards are blue-linked
Tile Roofing Details

7.3.2.2.17.jpg

Upper and lower flashings should be conformed with tile’s surface.

  • Upper flashings should extend 150 mm (6") past corners on each side, then formed around soakers.
  • Lower flashing should extend 100 mm (4") past corners and lapped under the soakers.


A mortar or mastic bedding should be applied to the tops of the concrete tile before flashing to prevent wind blown rain or vermin from entering.



RoofStar Guarantee Standards for Tile & Slate Roof Assemblies

Back to Tile and Slate Construction Details

Back to Construction Details