Difference between revisions of "SBS Parapet-Wall Connection"

Jump to: navigation, search

Difference between revisions of "SBS Parapet-Wall Connection"

(WORK INCLUDED)
Line 31: Line 31:
 
;(6) [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#SBSSTRIPTERM|'''Membrane Flashing (attachment & termination)''']]: Mechanically fasten at terminations.  At least one ply must extend over outside edge.
 
;(6) [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#SBSSTRIPTERM|'''Membrane Flashing (attachment & termination)''']]: Mechanically fasten at terminations.  At least one ply must extend over outside edge.
 
;(7) [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#METALCAP-SBS|'''Metal Base Flashing''']]: Optional on flexible membrane systems. Required on assemblies using gravel ballast filter mats.
 
;(7) [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#METALCAP-SBS|'''Metal Base Flashing''']]: Optional on flexible membrane systems. Required on assemblies using gravel ballast filter mats.
;(8) [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#METALCAP-SBS|'''Metal Cap Flashing''']]: Must overlap exterior wall finish.  </i>Fasten with  concealed clip-type fasteners  <b>or</b> cladding screws evenly spaced between seams.
+
;(8) [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#METALCAP-SBS|'''Metal Cap Flashing''']]: Must overlap exterior wall finish.  Fasten with  concealed clip-type fasteners  <b>or</b> cladding screws evenly spaced between seams.
 
;(9) [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#SBSWALLTIEIN|'''Wall Tie-in''']]: Minimum 2 mm (0.078") self-adhered  modified bitumen or flexible membrane manufacturers approved detail.
 
;(9) [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#SBSWALLTIEIN|'''Wall Tie-in''']]: Minimum 2 mm (0.078") self-adhered  modified bitumen or flexible membrane manufacturers approved detail.
 
;(10) [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#METALCAP-SBS|'''Metal Counter-flashing''']]:
 
;(10) [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#METALCAP-SBS|'''Metal Counter-flashing''']]:

Revision as of 19:26, 6 December 2017

RoofStar Guarantee Standards are blue-linked
SBS Details

10.3.1.4.jpg


Click below for a printable version of this page.
Print Sheet

1 WORK INCLUDED

(1) Gypsum Deck Overlay
If required by design authority.
(2) Vapour Retarder
If required by design authority.
(3) Insulation
See list of Accepted Materials.
(4) Insulation Overlay Board
As required.
(5) Primary Membrane and Membrane Protection
(6) Membrane Flashing (attachment & termination)
Mechanically fasten at terminations. At least one ply must extend over outside edge.
(7) Metal Base Flashing
Optional on flexible membrane systems. Required on assemblies using gravel ballast filter mats.
(8) Metal Cap Flashing
Must overlap exterior wall finish. Fasten with concealed clip-type fasteners or cladding screws evenly spaced between seams.
(9) Wall Tie-in
Minimum 2 mm (0.078") self-adhered modified bitumen or flexible membrane manufacturers approved detail.
(10) Metal Counter-flashing

2 RELATED WORK BY OTHERS

(A) Acceptable Deck
(B) Air/Vapour Seal
(C) Acceptable Wall Surface
(D) Wood Blocking
(E) Sloped Wood Blocking
Required over 100 mm (4") parapet width.
(F) Wall Sheathing Membrane
Minimum 1 mm (0.040") self-adhered modified bitumen.
(G) Wall Cladding

NOTE: Refer to RoofStar Guarantee Standards for additional requirements.




Back to RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies

Back to SBS Modified Bitumen Construction Details

Back to Construction Details