Difference between revisions of "SBS Fall Protection Anchor in Wall"
Difference between revisions of "SBS Fall Protection Anchor in Wall"
(→RELATED WORK BY OTHERS) |
|||
Line 22: | Line 22: | ||
=== RELATED WORK BY OTHERS === | === RELATED WORK BY OTHERS === | ||
;(A) [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#SBSDECKS|'''Acceptable Deck''']]: | ;(A) [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#SBSDECKS|'''Acceptable Deck''']]: | ||
− | ;(B) '''Wall Anchor''': | + | ;(B) '''Wall Anchor''': Anchor selection and attachment details are the responsibility of the Design Authority |
− | ;(C) '''Anchor Eye''' | + | ;(C) '''Anchor Eye''' |
;(D) '''Anchor Placement''': Minimum 200 mm (8") above finished roof surface. | ;(D) '''Anchor Placement''': Minimum 200 mm (8") above finished roof surface. | ||
;(E) '''Plywood''': 15.9 mm (5/8") treated where required. | ;(E) '''Plywood''': 15.9 mm (5/8") treated where required. |
Revision as of 17:06, 15 May 2018
RoofStar Guarantee Standards are blue-linked |
SBS Details
1 WORK INCLUDED
- (1) Conventional Roof Assembly
- (2) Metal Counter-flashing
- (3) Insulation
- See available insulation products in the Accepted Materials section of this Manual.
- (4) Primary Membrane and Membrane Flashing.
2 RELATED WORK BY OTHERS
- (A) Acceptable Deck
- (B) Wall Anchor
- Anchor selection and attachment details are the responsibility of the Design Authority
- (C) Anchor Eye
- (D) Anchor Placement
- Minimum 200 mm (8") above finished roof surface.
- (E) Plywood
- 15.9 mm (5/8") treated where required.
NOTE: Refer to RoofStar Guarantee Standards for additional requirements.
Back to RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies